Powered By Kitlog Pro v2.0
Waynes RV8 Project
RV8
Empennage - L Elev.
Work Logs Found:
64
Category Work Time:
48 Hours
Date
Hours
Work Log Summary
Details
09-20-2010
0.40
Riveted end of elevator had not been riveted.
Details
09-20-2010
0.30
Finished filing fiberglass tip.
09-19-2010
0.20
Continued to file fiberglass tip
04-01-2010
1.30
Fiberglass tips
Details
03-17-2010
0.50
Shaped lead weight cont.
Details
03-16-2010
1.60
Repeated procedure from right elevator
03-02-2010
1.80
Rolled and riveted leading edge
03-01-2010
2.20
Rolled and riveted the leading edges
02-22-2010
0.20
Trimmed inboard edge of E-721. Clecoed to elev.
02-22-2010
2.10
Made final adjustments to trim tab.
Details
02-18-2010
0.30
Match drilled and clecoed forward portion of E-721
02-18-2010
0.10
Marked the inboard edge of E-701-L on E-721
02-18-2010
0.20
Hinge
Details
02-18-2010
0.30
Adjusted hinge line of trim tab and elevator
02-17-2010
2.75
Riveted E-701-L and E-713 to the understructure
02-17-2010
0.50
Riveted E-606PP to E-701-L along bottom flange
Details
02-17-2010
0.25
Finished attaching E-714
02-16-2010
0.10
Placed skin over skeleton
02-10-2010
2.00
Prepped trim parts including etching and primining
01-29-2010
0.70
Riveted bottom part of trim tab
Details
01-29-2010
0.20
Clecoed trim tab back together
01-27-2010
1.75
Prepped trim tab parts including priming
01-25-2010
0.10
Trimmed E-721 trim tab hinge
01-25-2010
0.30
Trimmed E-717 and E-718
01-25-2010
0.10
Disassembled trim tab
01-25-2010
0.20
Dimpled top of the E-607PP trim tab spar
01-25-2010
0.80
Continued work of trim tab.
Details
01-24-2010
1.20
Continued work on trim tab.
Details
01-24-2010
1.00
Completed trailing edge bend of the trim tab
01-21-2010
2.00
Worked on trim tab.
Details
01-21-2010
0.30
Bent left elevator tabs.
Details
01-21-2010
0.25
Bent elevator trim tab openings.
01-16-2010
0.30
Riveted E-713 to E-701. Placed E-714 inside E-713.
01-14-2010
0.80
Riveted skeleton parts.
Details
01-13-2010
0.30
Riveted E-705 to E-702.
01-13-2010
0.75
Prepped and riveted parts.
Details
01-12-2010
0.40
Primed parts at Mark's house.
01-06-2010
3.50
Acid etch, alodine skeleton parts.
01-05-2010
1.00
Skeleton parts prep.
Details
01-05-2010
0.15
Drilled E-701-L to the understructure. Disassemble
01-05-2010
0.10
Countersunk (Dimpled) for rivets
Details
12-30-2009
0.50
Riveted platenuts to trim access panel
12-30-2009
1.25
Primed inside of (L) elevator skin
Details
12-29-2009
0.60
Trim access panel plate nut preps.
Details
12-21-2009
1.30
Smoothed edges of (L) elev. skin.
12-14-2009
0.20
Disassembled elevator
12-14-2009
1.00
Dimpled and smoothed stiffeners
12-14-2009
1.10
Devinyled top of skin
12-14-2009
0.75
Deburred inside of skin
12-14-2009
0.30
Clecoed and final drilled E-606PP to E-705
12-14-2009
0.25
Clecoed and drilled WD-605-1 to E-702 & E-705
12-11-2009
0.70
Drilled stiffeners to skin
12-08-2009
1.50
Fabricated D, E & F stiffeners
12-08-2009
0.50
Continued to fabricate stiffeners
12-07-2009
1.00
Fabricated stiffeners
12-07-2009
0.40
Clecoed E-701-L to the understructure
11-30-2009
0.25
Smoothed edges and clecoed E-615PP to skin
11-30-2009
0.70
Fabricated "H" stiffeners
11-08-2009
0.40
Elevator skeleton prep.
Details
11-07-2009
0.20
Drilled holes in E-714 for screws
11-06-2009
0.25
Fitted E-714 counterweight
Details
11-02-2009
1.00
Prepared tip ribs
Details
11-02-2009
0.20
Match drilled reinforcement plates to spar
Details
11-01-2009
0.30
Clecoed reinforcing plates to spar
Details
SITE NAVIGATION
Contact Builder
RV8 Home
Category
# Logs
# Hours
All
242
315
Empennage
3
3
Empennage - Elev.
4
6
Empennage - H Stab
60
84
Empennage - L Elev.
64
48
Empennage - R Elev.
24
37
Empennage - Rudder
40
60
Empennage - V Stab
21
33
Miscellaneous
2
4
Wings
16
19
Wings - L
6
16
Wings - Right
2
5
Copyright © 2001-2024 Matronics. All Rights Reserved.