KitLog pro

Powered By Kitlog Pro v2.0

Alaska Sonex
Work Logs Found: 48
Category Work Time: 178 Hours
 Date
Hours
Work Log Summary

Details

 06-11-2011
2.50
Canopy Frame
Details
       

 01-23-2011
4.00
Canopy parts
Details
       

 01-17-2011
6.00
Windscreen
Details
       

 10-10-2010
4.00
Trim Wheel
Details
     

 09-29-2010
6.50
Control sticks, etc.
Details
       

 08-08-2010
3.00
Closing the spar tunnel.
Details

 06-06-2010
6.00
Control assembly and panel
Details
       

 06-02-2010
2.00
Rudder springs
Details

 06-01-2010
3.00
aft spar carry through
Details

 05-31-2010
6.00
Stick assembly
Details
       

 05-23-2010
8.00
Control pushrods and cables
Details
       

 05-02-2010
4.00
Flap tube
Details
       

 04-25-2010
4.00
Glareshield
Details
       

 04-24-2010
2.00
Rework seat sling
Details

 03-19-2010
3.00
Firewall Details
Details
     

 03-19-2010
4.50
Engine Mount
Details
       

 01-20-2010
6.00
Glare shield
Details
       

 01-16-2010
2.00
Rudder pedals
Details
       

 01-15-2010
1.50
Pivot blocks
Details
       

 01-10-2010
2.00
Flap detent.
Details
       

 01-09-2010
2.00
Seat pan install
Details
     

 01-08-2010
3.50
Install hardware
Details
     

 01-01-2010
2.50
Countersinks.
Details

 12-28-2009
3.00
Firewall
Details
     

 12-28-2009
2.00
Completed floor assemblies
Details
       

 12-24-2009
2.00
Initial floor assembly rivets.
Details
     

 12-22-2009
1.50
Priming
Details

 12-19-2009
2.00
More metal Prep
Details

 12-14-2009
2.50
Parts prep
Details

 12-12-2009
2.00
Updrilled cabin floor structure
Details

 12-10-2009
8.50
Fuselage floor/support structure
Details
       

 12-08-2009
2.00
Rough assembly cabin floor
Details

 12-03-2009
7.50
Mating of the Fuselages
Details
       

 11-26-2009
7.00
More Fwd Fuse details
Details
       

 11-21-2009
4.00
Fwd Fuse Parts
Details
       

 11-20-2009
6.00
Upper Fire Wall
Details
       

 11-16-2009
2.50
Completed Fwd. Fuse Panels
Details

 11-14-2009
2.00
Reassemble Left Fwd. Fuse Panel
Details
     

 11-13-2009
3.00
Debur and prep
Details

 11-12-2009
2.00
More Left Fwd. Fuselage panel
Details
       

 11-11-2009
3.00
Left fwd. panel
Details

 11-09-2009
8.00
Right Fwd Side Panel
Details
       

 10-31-2009
6.00
SNX- F16 and F15
Details
       

 10-29-2009
2.50
Aft Tunnel Assembly
Details
     

 10-25-2009
1.50
Angle Assembly
Details

 10-24-2009
4.50
Fwd Fuse parts
Details

 10-22-2009
2.00
Upper firewall parts
Details

 10-21-2009
3.50
Seat Pan
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.