KitLog pro

Powered By Kitlog Pro v2.0

Flandy Rv-10
Work Logs Found: 235
Category Work Time: 579 Hours
 Date
Hours
Work Log Summary

Details

 10-14-2015
2.00
Wingtips and flying
Details

 08-15-2015
4.00
Emp/ wingtip fairings and wheel pants
Details

 08-14-2015
3.00
fairing work
Details

 11-06-2014
3.00
Wingtips
Details
       

 11-05-2014
3.00
Aux tank and wingtips
Details
       

 10-31-2014
5.00
Flaps, aux tanks, fuel system
Details
       

 10-28-2014
4.00
Aux Fuel Tank and electrical sys
Details
       

 10-26-2014
4.00
Wingtips and Engine mount
Details
       

 10-23-2014
2.00
Flight Controls- complete
Details
       

 10-22-2014
6.00
Flight Controls--rigged.
Details
       

 10-21-2014
2.00
Fuel system
Details
     

 10-16-2014
3.00
Left tank install
Details

 10-15-2014
3.00
Right tank install
Details
       

 10-10-2014
3.00
Leak testing in progress and right tip.
Details

 07-23-2014
3.00
Strobe wiring
Details
       

 07-22-2014
5.00
Still wiring
Details
       

 07-21-2014
2.00
Wiring continues
Details
     

 07-14-2014
6.00
Pitot and OAT probe wiring + more
Details
       

 07-12-2014
3.00
Wing Install Day #3
Details
       

 07-11-2014
6.00
Wing install cont.--wiring, flaps
Details
       

 07-10-2014
6.50
Prep and FINAL wing install
Details
       

 07-06-2014
5.00
Tank nutplates and final mate prep work
Details

 07-05-2014
7.00
Wing roots and HS/elevator
Details
       

 07-04-2014
8.50
Wing Assembly prep
Details
       

 06-23-2014
5.00
Aux Pump Pwr and Wing Mating
Details
       

 05-13-2014
4.00
Wingtips, Wing attach prep, Doors
Details
       

 05-07-2014
3.00
Wingtips and interior work
Details

 03-23-2014
3.00
Wingtip Aux Fuel Doors
Details
       

 03-16-2014
2.00
Wingtips- ribs and misc
Details
       

 03-07-2014
3.00
Wingtips and body work
Details
       

 03-02-2014
2.50
Wingtips cont.
Details

 02-24-2014
1.50
Left wingtip
Details

 02-23-2014
2.50
Right wingtip
Details
       

 02-22-2014
2.50
Aileron Trim and wingtips
Details

 02-07-2014
2.50
Fuel tanks and tip fairings
Details
     

 02-05-2014
4.00
Wingtips and AOA line
Details
       

 01-31-2014
2.00
Fuel tanks
Details

 01-20-2014
1.50
Wingtips Day #7
Details

 01-19-2014
3.50
Wingtips Day #6
Details

 01-18-2014
2.50
Wingtips Day #5
Details
     

 01-17-2014
2.00
Wingtips Day #4
Details

 01-13-2014
2.00
Wingips Day#3
Details

 01-09-2014
1.50
Wingtips Day #2
Details

 01-08-2014
4.50
Wingtip fairings
Details

 07-13-2010
2.50
Aux Tanks and Aileron Actuation Complete
Details

 07-12-2010
1.50
Installed Flaps and Ailerons, Actuators finsihed
Details
       

 07-03-2010
3.50
More Aux tank install
Details
       

 07-01-2010
3.50
Left Aux Tank Install and Fuel Tank Repair
Details
       

 06-30-2010
3.50
Tested Lt Main Tank and More Aux Tank Install
Details
       

 06-29-2010
3.00
Ailerons Complete, Tested Rt Main Tank
Details
     

 06-26-2010
2.50
EAA Tech Visit/ Ailerons and Aux tanks
Details

 06-25-2010
4.00
Ailerons and Aux Tanks
Details
       

 06-17-2010
1.50
More aileron riveting
Details
       

 06-16-2010
4.50
Riveting Ailerons
Details
       

 06-15-2010
5.00
Primed ailerons and aux tank mounts
Details
       

 06-14-2010
3.50
Aileron prep
Details

 06-13-2010
3.00
More Aux Tank mounts and Aileron prep work
Details

 06-12-2010
3.00
Aux tank mounts
Details
       

 06-11-2010
3.50
Aux Tank Installation
Details
       

 06-10-2010
4.00
Bottom Skins Finished
Details
       

 06-03-2010
3.50
Flaps Completed
Details
       

 05-27-2010
0.75
Flap trailing edge
Details
       

 05-26-2010
3.00
Riveting Flaps
Details
       

 05-25-2010
3.50
Aileron and Flap work
Details

 05-24-2010
3.00
More misc catch-up work
Details
       

 05-23-2010
1.50
Pitot Heat and Torque tubes
Details
     

 05-22-2010
2.50
Misc catch-up work
Details

 05-06-2010
1.50
Flaps and Pushrods
Details
       

 05-05-2010
3.00
Priming parts
Details
     

 05-04-2010
1.50
Flap Skin prep
Details

 04-29-2010
3.50
Even more riveting
Details
     

 04-28-2010
0.75
Wing wiring
Details

 04-27-2010
3.50
Right Outboard Bottom Skin Finished
Details
       

 04-25-2010
0.75
More bottom skin riveting
Details

 04-23-2010
2.50
More Riveting again
Details
     

 04-22-2010
2.00
Riveting again
Details

 04-10-2010
3.00
And More Riveting
Details
       

 04-09-2010
1.50
More Riveting
Details

 04-08-2010
2.00
Bottom skin riveting
Details

 03-26-2010
3.00
Riveting Bottom Skin
Details
       

 03-24-2010
2.50
Finished Dimpling bottom skins
Details
       

 03-23-2010
2.25
Cont. riveting flaps and dimpled skins
Details
       

 03-22-2010
1.50
Riveted flap skeletons
Details

 03-20-2010
3.00
Riveted Flap sub assemblies
Details
       

 03-19-2010
4.50
Priming Completed
Details
       

 03-18-2010
4.00
More priming
Details
       

 03-17-2010
4.00
Priming wing skins and flaps
Details
       

 03-16-2010
2.00
Final Priming Prep
Details

 03-11-2010
4.00
Final Aileron Match drill and Pushrod fabrication
Details
       

 03-10-2010
3.50
Finished Flap deburring and more aileron work
Details
       

 03-09-2010
4.00
More Wiring and a lot more deburring
Details

 03-01-2010
1.50
Wired wings
Details
       

 02-22-2010
3.00
Riveted Aileron skins and Aileron trim mount
Details
       

 02-20-2010
1.50
Priming Aileron skins and stiffeners
Details
       

 02-19-2010
3.00
Priming Ailerons and Flap deburring cont.
Details

 02-18-2010
1.00
Flap deburring cont.
Details

 02-12-2010
3.50
C-sink and deburring Flap parts
Details

 02-11-2010
3.00
Flap match drilled
Details
       

 02-10-2010
3.00
Flap assembled
Details
       

 02-03-2010
3.50
Flap Ribs and Hinge Brackets
Details
       

 02-02-2010
2.00
Wing plumbing and wiring
Details

 01-29-2010
1.50
More deburring and other misc items
Details
       

 01-28-2010
3.00
Aileron stiffeners and aileron trim started
Details
       

 01-27-2010
2.00
Drilled hinge brackets -- ER Tanks arrived
Details
       

 01-26-2010
1.50
Ailerons
Details

 01-25-2010
1.00
Wiring Wings
Details
       

 01-25-2010
1.00
Ailerons
Details
       

 01-21-2010
0.75
Finished deburring bottom skins
Details

 01-20-2010
3.00
Wing deburring and wiring
Details
     

 01-19-2010
2.00
Tanks compeleted and more skin deburring
Details

 01-16-2010
2.50
Closed Left Fuel Tank
Details

 01-14-2010
2.50
Closed Right Fuel Tank
Details
       

 01-13-2010
3.00
Tank inspection and wing deburring
Details

 01-12-2010
2.00
Fuel level senders
Details
       

 01-05-2010
2.50
Tank Inboard Rib installed
Details

 01-04-2010
2.50
More Proseal and vent parts
Details
       

 12-31-2009
3.50
Tank assembly work
Details
       

 12-30-2009
1.50
Deburring wing parts
Details

 12-29-2009
2.00
Tank stiffeners
Details
       

 12-28-2009
1.00
More Pitot Tube Mount
Details
       

 12-21-2009
1.50
Pitot Mount
Details
       

 12-19-2009
1.00
Left tank J-channel
Details

 12-09-2009
2.50
Prosealed Ribs
Details

 12-07-2009
2.50
Finished Riveting Fuel tank ribs
Details

 12-03-2009
4.00
Riveting tank ribs
Details
     

 12-02-2009
3.00
More tank ribs and finished match drilling skins
Details
       

 12-01-2009
2.75
Tank rib install and match drilling
Details
     

 11-30-2009
3.25
Tank rib install and match drill skins
Details
       

 11-29-2009
0.75
More bottom wing skins
Details

 11-28-2009
0.75
Cleocoed wing bottom skins
Details
     

 11-26-2009
4.25
Riveting stiffeners and fairings complete
Details
       

 11-25-2009
2.75
More tank stiffeners and gap seals
Details
       

 11-18-2009
2.50
Fuel tank stiffeners and gap seals
Details
       

 11-17-2009
1.50
Misc. Tank Parts sealed
Details
       

 11-16-2009
1.00
Riveting Fairings
Details
       

 11-13-2009
3.00
Primed Gap Fairings
Details

 11-12-2009
1.20
Gap fairings
Details

 11-11-2009
2.50
Tank mods and wing gap seals
Details
       

 11-04-2009
1.00
Tank modifications
Details
       

 11-03-2009
1.00
Misc Fuel tank prep and modifications
Details

 10-31-2009
1.50
Finished Dimpling Skins
Details
       

 10-30-2009
3.00
Let the Dimpling Begin!
Details

 10-29-2009
6.00
Primed tank parts
Details
       

 10-28-2009
4.50
Deburring of tanks complete
Details

 10-27-2009
3.00
Match drilled Fuel cap and Dissambled tank
Details
       

 10-26-2009
2.00
Match drill/C-sink tank skins
Details
       

 10-19-2009
1.50
Attach Zees and Aft tank baffle
Details
     

 10-15-2009
2.25
Match drilling skins to ribs
Details
       

 10-14-2009
1.00
Tank Rib Install
Details
       

 10-13-2009
1.00
More tank rib installation
Details

 09-28-2009
1.50
Completed Outboard Leading Edges
Details

 09-22-2009
1.50
Fuel tank assembly
Details

 09-21-2009
3.00
Left LE Riveting and Fuel tank assembly
Details
       

 09-20-2009
1.40
Finished Left light lens and cut j-channels
Details

 09-19-2009
2.00
Fuel tank parts prep
Details
     

 09-17-2009
2.00
Installed AOA sensors and attached right LE
Details
       

 09-16-2009
1.50
Match drilled left leading edge
Details
       

 09-15-2009
1.50
Clecoed both leading edges
Details
     

 09-08-2009
1.00
RIght Light complete- Left light almost done
Details

 09-07-2009
1.00
Fitting left and ring lens
Details

 09-06-2009
0.40
Trimming left wing lens
Details

 09-05-2009
2.25
Priming complete- More DW light install work
Details
       

 09-04-2009
1.75
Finished lens mounts and priming prep
Details
       

 09-03-2009
3.00
More light installation work
Details
       

 09-02-2009
2.00
Landing light assembly
Details
       

 09-01-2009
2.50
Finished Riveting LE and started landing light ins
Details
       

 08-31-2009
3.00
More leading edge riveting
Details
       

 08-19-2009
1.50
Rivet leading edges
Details
       

 08-17-2009
1.50
Reassembled leading edges
Details
       

 08-10-2009
2.00
Dimpled leading edges
Details

 08-08-2009
2.50
Primed leading edge parts
Details

 08-07-2009
4.00
Prime leading edge
Details

 08-06-2009
1.25
Finished leading edge prep
Details

 08-05-2009
2.00
Leading edge work
Details
       

 08-05-2009
1.50
Deburring leading edges
Details

 07-04-2009
2.50
Match drilled both leading edges
Details
     

 06-26-2009
2.75
Leading Edge Assembled
Details
       

 06-24-2009
0.50
Riveted right aileron bracket
Details
       

 06-13-2009
2.00
Finished riveting right wing top skins
Details
       

 06-10-2009
3.00
Right wing top skin riveting
Details
     

 06-01-2009
0.50
Rivet outboard aileron bracket
Details

 05-31-2009
1.75
Finished Left wing top skin
Details
       

 05-30-2009
1.50
Top skin riveting
Details
       

 05-29-2009
1.50
Top Skin Riveting
Details

 05-27-2009
1.00
Riveting Top skins
Details
     

 05-17-2009
1.50
Outboard leading edge
Details
     

 05-15-2009
2.50
Finished dimpling skins and assembled parts
Details
       

 05-14-2009
3.50
Finished Priming and more Dimpling
Details
     

 05-11-2009
5.00
Finished deburring skins and began priming
Details

 05-05-2009
1.50
More deburring wing skins
Details

 05-03-2009
1.25
Deburr and dimple wing ribs
Details

 04-30-2009
3.00
Dissasemble/ deburr/ C-sink Top Skin
Details

 04-29-2009
2.50
Match drilling top skins
Details

 04-27-2009
2.50
Finished rear spar riveting and began top skin pre
Details
       

 04-26-2009
2.00
Riveting rear spar
Details
     

 04-25-2009
3.50
Prime rear spar and assemble
Details
       

 04-15-2009
1.50
Rear spar final prep
Details

 04-11-2009
2.25
Rear spars match drilled
Details

 04-06-2009
2.50
Completed Right Rib Install and clecoed rear spar
Details
       

 04-05-2009
2.00
Flap Hinge and Aileron Bracket Riveted
Details
       

 04-04-2009
3.00
Prime time
Details

 03-27-2009
2.50
Priming parts
Details

 03-26-2009
3.50
Right Ribs and Aft spar doublers
Details
       

 03-25-2009
1.50
Deburring right wing ribs and aileron hinges
Details

 03-23-2009
2.00
Riveted ribs to spar and started aileron hinges
Details

 03-22-2009
2.00
Assebled flap hinges and ribs to wing
Details
       

 03-21-2009
4.50
Priming complete
Details
     

 03-20-2009
2.50
Priming Left Wing ribs
Details

 03-17-2009
0.60
Right wing spar/rib match drill complete
Details

 03-16-2009
1.50
Flap hinge assembly and wing rib match drilling
Details

 03-16-2009
1.00
Finished rudder tip and started right wing ribs
Details
       

 03-08-2009
1.00
Deburring wing ribs
Details

 03-04-2009
1.00
Disassemble and deburr left wing ribs
Details

 03-03-2009
1.00
Match Drilled Ribs to Spar
Details
     

 03-02-2009
1.50
Torgue Tube and Flap Hinge Assemblies
Details
       

 03-01-2009
1.00
Fluting complete
Details

 02-28-2009
2.00
More Rib preparation
Details

 02-27-2009
1.00
Fluting Ribs
Details

 02-26-2009
1.75
Primed parts and assembled attached tie downs
Details
     

 02-22-2009
0.75
Tie down fabrication
Details

 02-13-2009
0.75
Completed spar nutplates
Details

 02-12-2009
2.50
More wing spar preparation
Details
       

 02-11-2009
1.00
Fuel tank screw countersinks+ tip fairings
Details

 02-10-2009
2.00
Countersinking and Fuel tank nutplates
Details
       

 02-09-2009
2.00
More C-sinking spars
Details
       

 02-07-2009
2.00
Countersinking spars
Details

 02-03-2009
3.15
Match drilling J-Channels and C-sink spars
Details
     

 02-02-2009
1.20
Match drilling stiffeners
Details
     

 01-29-2009
1.25
Wing stiffeners
Details
     

 01-28-2009
1.50
Riveted wing spar extensions
Details
       

 01-27-2009
0.50
Finsihed priming spar extension
Details
     

 01-26-2009
0.75
Wingtip extension prime step 1+2
Details

 01-25-2009
1.00
Fairing work and Wing spar extension
Details
     

 01-23-2009
0.50
Wing spar extension
Details

 01-18-2009
2.50
Wing stand
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.