KitLog pro

Powered By Kitlog Pro v2.0

Flandy Rv-10
Work Logs Found: 143
Category Work Time: 284 Hours
 Date
Hours
Work Log Summary

Details

 08-14-2014
3.00
Elevator horn- take deux
Details
       

 02-04-2014
1.50
HS fairings
Details

 02-14-2009
2.00
Tip fairings installed
Details
       

 02-03-2009
0.75
Tip fairing work
Details
     

 02-01-2009
0.40
Tip fairings again.
Details
     

 01-31-2009
0.40
Tip Fairings
Details

 01-30-2009
0.25
Tip fairings
Details

 01-29-2009
0.75
Tail fairing work
Details
     

 01-25-2009
1.00
Elevator stop final adjustment
Details
       

 01-24-2009
1.00
HS Fwd attach bolts redrilled
Details
     

 12-18-2008
0.40
Prime and riveted spacer
Details

 11-20-2008
2.00
Tip fairings match drilled
Details
       

 11-13-2008
0.50
Spacer/shim remake
Details

 11-07-2008
0.45
Drilling Wingtip fairings
Details
       

 11-06-2008
1.50
Tail dissamebly and wing kit unpack
Details

 11-04-2008
1.50
Elevator trim assembly and Fairing rough cuts.
Details
       

 11-03-2008
2.00
Pushrod adjustment and trim servo mount assembly
Details
       

 11-02-2008
0.40
VS and Rudder removal
Details

 11-01-2008
2.50
VS, Rudder, and pushrod installation
Details
       

 10-31-2008
1.00
HS and VS attachment
Details
     

 10-28-2008
0.75
Pushrod fabrication
Details

 10-21-2008
0.70
Trim mount assmebly and servo link prep
Details

 10-17-2008
1.50
Trim assembly construction
Details

 10-16-2008
0.60
Drilled HS Fwd attach holes
Details

 10-15-2008
2.00
HS to tail cone attachment
Details
       

 10-14-2008
3.00
Match drilling elevator horns
Details
       

 10-13-2008
1.50
Elevator fitting to HS
Details
     

 10-12-2008
0.25
Tailcone complete.
Details
       

 10-11-2008
1.50
Complete riveting skins.
Details
       

 10-05-2008
1.00
Cont. riveting top stiffeners and frames to skin
Details

 10-03-2008
0.75
Riveting top stiffeners to skin
Details

 10-01-2008
1.50
Aft deck hardware and top skin install
Details
       

 09-30-2008
1.50
Riveted Aft Deck
Details

 09-29-2008
4.50
Lower skin and bellcrank rib riveting complete
Details

 09-28-2008
1.25
Riveting side skins to bottom skin
Details
     

 09-27-2008
1.00
More riveting
Details

 09-24-2008
2.50
Stiffener riveting complete/ frames to skin begins
Details

 09-19-2008
2.50
And more riveting
Details

 09-17-2008
1.00
More Riveting
Details

 09-16-2008
1.00
Riveting stiffeners
Details

 09-15-2008
6.50
Riveting Frames and tailcone assembly
Details
       

 09-11-2008
1.00
Frame and bulkhead assembly begins.
Details
       

 09-10-2008
5.50
Priming Complete
Details
       

 09-09-2008
4.50
Still Priming
Details

 09-08-2008
5.00
Priming begins
Details

 09-04-2008
2.00
Dimpling complete. Battery mount and bellcrank as
Details

 09-03-2008
4.50
Deburring complete, Dimpling begins
Details

 09-02-2008
2.50
Deburring complete
Details

 08-29-2008
0.40
Deburring cont.
Details

 08-26-2008
1.50
Deburring skins cont.
Details

 08-25-2008
3.00
Drilling complete and Tailcone deburring begins
Details

 08-19-2008
1.50
Shoulder harness anchor and cover plates
Details

 08-18-2008
4.50
Top skin installed
Details
     

 08-18-2008
1.25
Drilling aft deck
Details
       

 08-17-2008
1.00
Match drilling empenage cont.
Details

 08-16-2008
3.50
Aft deck and longeron installation
Details
       

 08-15-2008
2.50
Rudder stop brace+ stiffeners/ Bellcrank angles
Details
     

 08-15-2008
1.00
Bellcrank angles and Longeron redo
Details
     

 08-14-2008
2.00
More match drilling
Details
       

 08-13-2008
3.00
Frames/stiffeners/longerons
Details
       

 08-13-2008
2.50
Assembled frames, bulkheads, and skins
Details
       

 08-12-2008
3.50
Bulkhead and Frame preparation
Details
     

 08-09-2008
1.40
Rudder cable angle and HS attachment bars
Details
     

 08-07-2008
1.00
Tie down and aft bulkhead
Details
     

 07-29-2008
0.05
Elevators Complete
       

 07-28-2008
3.50
Trim Tab Completeion
Details
 

 07-27-2008
2.00
C'balance wts. and Trim tab hinge
Details
       

 07-23-2008
1.50
Rolled leading edges
Details

 07-22-2008
1.50
Riveted Trailing Edge
Details
     

 07-19-2008
2.50
Bonded elevator and trim tab ribs and edge
Details
       

 07-15-2008
3.50
Riveted Front spar, Root ribs, and tip ribs
Details
       

 07-14-2008
5.00
Riveting- Cleanup/ Rear spar / Front spar to skin
Details
       

 07-12-2008
2.00
Assembled parts to elevator skins
Details
       

 07-10-2008
1.50
Rivetd Dbler plates and control horns
Details
       

 07-09-2008
0.50
Rivet tip ribs
Details
     

 07-09-2008
6.00
Priming Part 2
Details
       

 07-08-2008
7.00
Prime elevator parts
Details
     

 07-07-2008
6.00
Elevator Trim Tabs
Details
       

 07-06-2008
1.30
C'sink elevator wedge and cut out ribs
Details
     

 07-05-2008
0.75
Checked elevator spar flanges
Details
       

 06-26-2008
2.75
Dimpling and C'sinking
Details
       

 06-25-2008
2.25
Finsihed deburring and began dimpling
Details

 06-24-2008
2.50
Deburring elevator parts
Details

 06-23-2008
3.00
More Match Drilling
Details

 06-22-2008
2.00
Match drilling
Details

 06-19-2008
0.20
Elevator horns and close-out tabs
Details
       

 06-18-2008
0.45
Top skin and trailing edge
Details

 06-17-2008
0.50
Elevator Internal construction cont.
Details
     

 06-17-2008
1.50
Elevator internal construction
Details
       

 06-16-2008
0.80
Hinge reinforecments+ spar and rib placement
Details
     

 06-13-2008
1.00
Finished Tip ribs and bent Elev skin tabs
Details
     

 06-11-2008
1.50
rib deburring and tip rib assembly
Details
       

 06-10-2008
2.00
Elevator ribs
Details
       

 06-08-2008
1.00
Trailing Edge and forward edge finished
Details
       

 06-08-2008
2.00
Rudder counterweight and completion
Details
       

 06-07-2008
2.00
Riveted Rudder trailing edge
Details
       

 06-03-2008
1.50
Riveted rudder spar
Details

 05-30-2008
1.00
Rudder skin assembly
Details
       

 05-27-2008
1.00
HS Complete!
Details

 05-26-2008
3.00
Riveting HS cont.
Details
       

 05-23-2008
4.50
Riveting HS
Details

 05-22-2008
2.00
HS Riveting
Details
       

 05-21-2008
3.20
Began riveting HS
Details
       

 05-20-2008
1.25
Rudder final construction
Details
       

 05-19-2008
5.00
Prime rudder and HS parts
Details

 05-12-2008
1.50
Rudder work
Details

 05-12-2008
3.00
HS Dimpling complete
Details
       

 05-09-2008
2.50
Deburred complete- Dimpling begins
Details

 05-08-2008
2.00
More deburring.
Details

 05-07-2008
1.00
Deburring
Details

 05-06-2008
1.00
HS disassmebly
Details

 05-05-2008
2.00
HS Assenbly cont
Details

 05-04-2008
0.40
HS Assembly cont.
Details
     

 05-03-2008
2.50
HS Assembly
Details
       

 05-03-2008
1.00
Con't HS assembly
Details
       

 05-02-2008
3.00
Modified HS Ribs
Details
       

 05-02-2008
1.50
Built cradles and began HS assembly
Details
       

 05-01-2008
3.00
Finished VS
Details
       

 04-26-2008
1.00
Forward HS spar assembly
Details
       

 04-19-2008
1.50
Assmbled fwd and aft HS spar
Details
       

 04-18-2008
1.25
Riveted VS skeleton
Details
     

 04-18-2008
0.50
Riveted Rudder lower rib and spar
Details
       

 04-18-2008
0.25
Finished rudder spar
Details
     

 04-17-2008
5.00
Riveted VS Spar
Details
       

 04-16-2008
3.00
Prime
Details
       

 04-16-2008
2.00
Alodined all parts
Details
       

 04-15-2008
3.50
Prep for Priming
Details

 03-28-2008
5.50
HS Front and Rear spars
Details
       

 03-27-2008
1.50
Cut and deburr spar caps and attach brackets
Details
       

 03-26-2008
1.50
Deburr HS spars
Details

 03-24-2008
1.00
VS final deburr
Details

 03-16-2008
0.75
Dimpled rudder parts
Details

 03-12-2008
1.50
Rudder construction cont.
Details

 03-11-2008
2.00
Rudder Skeleton and Skin Prep
Details
       

 03-10-2008
2.50
Rudder Skeleton Assembly
Details
       

 03-07-2008
0.50
Separated R1003 /R1004 /R1010 parts
Details
     

 03-07-2008
0.75
Rear Spar Dblr and Rudder Stops
Details
       

 03-06-2008
3.00
VS skeleton preparation
Details
     

 03-05-2008
2.25
VS skin Dimpled
Details

 03-04-2008
2.00
VS skin fitting
Details
       

 02-29-2008
1.00
VS Skeleton Assembly
Details

 02-28-2008
2.00
Spar Caps and Rear Spar Assembly
Details
       

 02-11-2008
2.50
completed tail kit inventory
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.