KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
Work Logs Found: 385
Category Work Time: 237 Hours
 Date
Hours
Work Log Summary

Details

 01-06-2019
0.50
Fwd Top Skin Finishing 8
Details
       

 01-06-2019
0.50
Fwd Top Skin Finishing 7
Details
       

 01-06-2019
1.00
Fwd Top Skin Finishing 6
Details
       

 01-06-2019
0.50
Fwd Top Skin Finishing 5
       

 01-06-2019
1.00
Fwd Top Skin Finishing 4
Details
       

 01-06-2019
1.00
Fwd Top Skin Finishing 3
Details
       

 01-06-2019
1.00
Fwd Top Skin Finishing 2
Details
       

 01-06-2019
1.00
Fwd Top Skin Finishing 1
Details
       

 10-11-2018
0.50
Fwd Top Final Skin 4
Details
       

 10-11-2018
1.00
Fwd Top Final Skin 3
Details
       

 10-11-2018
1.00
Fwd Top Final Skin 2
Details
       

 10-11-2018
1.00
Fwd Top Final Skin 1
Details
       

 09-27-2018
1.00
Center floor and covers
Details
       

 09-16-2018
0.20
Fuel pump & Line covers 2
Details
       

 09-16-2018
1.00
Fuel pump & Line covers 1
Details
       

 09-14-2018
1.00
Wing Box Fuselage covers
Details
       

 06-04-2018
0.50
Rear Access Plates
Details
       

 05-05-2018
1.00
Aux Fuel Pump Final Installation 2
Details
       

 05-05-2018
1.00
Aux Fuel Pump Final Installation 1
Details
       

 05-04-2018
0.50
Access Holes in top skin 4
Details
       

 05-04-2018
0.50
Access Holes in top skin 3
Details
       

 05-04-2018
1.00
Access Holes in top skin 2
Details
       

 04-22-2018
0.50
Access Holes in top skin 1
Details
       

 04-21-2018
2.00
Floors Final Installation 2
Details
       

 04-21-2018
0.50
Floors Final Installation 1
Details
       

 04-16-2018
1.00
Sound Proofing 1
Details
       

 04-13-2018
0.50
Flaps motor
Details
       

 12-04-2016
1.00
N454SL
Details
       

 09-11-2016
1.00
Top Forward Fuselage 1
Details
       

 04-28-2016
0.10
Final Reviting of Aft Fuselage 2
Details
     

 04-28-2016
1.00
Final Reviting of Aft Fuselage 1
Details
       

 05-16-2015
0.50
Noise Reduction: Damping 1
Details
       

 06-02-2011
0.50
Canopy Emergency Release Configuration 2
       

 06-02-2011
2.00
Canopy Emergency Release Configuration 1
Details
       

 06-01-2011
1.00
Stick Installation 5: Coolie Hat
Details
       

 06-01-2011
1.00
Stick Installation 4
Details
       

 06-01-2011
1.00
Stick Installation 3
Details
       

 05-12-2011
1.00
Stick Installation 2
Details
       

 05-12-2011
1.00
Stick Installation 1
Details
       

 05-10-2011
1.00
Rudder & Brake Pedal Install 3
Details
       

 05-10-2011
1.00
Rudder & Brake Pedal Install 2
Details
       

 05-10-2011
1.00
Rudder & Brake Pedal Install 1
Details
       

 05-08-2011
1.00
Rivet on Canopy Decks 3
Details
       

 05-08-2011
1.00
Rivet on Canopy Decks 2
Details
       

 05-07-2011
1.00
Rivet on Canopy Decks 1
Details
       

 05-06-2011
1.00
Finshi Bulkhead #705 Riveting 1
Details
       

 05-04-2011
1.00
Top Rear Skins 4
Details
       

 05-04-2011
2.00
Top Rear Skins 3
Details
       

 05-03-2011
2.00
Top Rear Skins 2
Details
       

 05-02-2011
1.00
Top Rear Skins 1
Details
       

 04-27-2011
0.10
Aft Fuselage is Ready for top skins
Details
       

 04-21-2011
1.00
Fuel Lines from Bonaco 9
Details
       

 04-21-2011
0.50
Fuel Lines from Bonaco 8
Details
       

 04-21-2011
0.50
Fuel Lines from Bonaco 7
Details
       

 04-21-2011
0.50
Fuel Lines from Bonaco 6
Details
       

 04-21-2011
1.00
Fuel Lines from Bonaco 5: Order Tubes
Details
       

 04-21-2011
0.20
Fuel Lines from Bonaco 5
Details
       

 04-21-2011
1.00
Fuel Lines from Bonaco 4
Details
       

 04-21-2011
1.00
Fuel Lines from Bonaco 3
Details
       

 04-21-2011
1.00
Fuel Lines from Bonaco 2
Details
       

 04-21-2011
1.00
Fuel Lines from Bonaco 1
Details
       

 04-05-2011
1.00
Fuselage Finish: Dynon ADAHRS 3
Details
       

 04-05-2011
1.00
Fuselage Finish: Dynon ADAHRS 2
Details
       

 04-05-2011
1.00
Fuselage Finish: Dynon ADAHRS 1
Details
       

 04-04-2011
2.00
Fuselage Finish: Brakes, Fuel Vent Fittings 1
Details
       

 10-02-2010
1.00
Redo Fuel Lines 3: Installed firewall doubler
Details
       

 10-02-2010
1.00
Redo Fuel Lines 2: Installed firewall doubler
Details
       

 10-02-2010
1.00
Redo Fuel Lines 1: Installed firewall doubler
Details
       

 10-01-2010
1.00
Rudder Cable Cover fastened Down
Details
       

 04-11-2010
0.10
Fuselage Final Items: List of future pick ups
Details

 04-10-2010
0.10
Fuselage Final Items: Paint Interior 3
Details
       

 04-10-2010
1.00
Fuselage Final Items: Paint Interior 2
Details
       

 04-10-2010
1.00
Fuselage Final Items: Paint Interior 1
Details
       

 04-08-2010
0.20
Fuselage Final Items: Fwd Elevator Push Rod 3
Details
       

 04-08-2010
0.20
Fuselage Final Items: Fwd Elevator Push Rod 2
Details
       

 04-08-2010
0.20
Fuselage Final Items: Fwd Elevator Push Rod 1
Details
       

 04-07-2010
0.10
Fuselage Final Items: Electric Aileron Trim 11
Details
       

 04-07-2010
0.10
Fuselage Final Items: Electric Aileron Trim 10
Details
       

 04-06-2010
0.30
Fuselage Final Items: Electric Aileron Trim 9
Details
       

 04-06-2010
0.50
Fuselage Final Items: Electric Aileron Trim 8
Details
       

 04-06-2010
0.50
Fuselage Final Items: Electric Aileron Trim 7
Details
       

 04-06-2010
0.50
Fuselage Final Items: Electric Aileron Trim 6
Details
       

 04-04-2010
0.50
Fuselage Final Items: Electric Aileron Trim 5
Details
       

 04-04-2010
0.50
Fuselage Final Items: Electric Aileron Trim 4
Details
       

 04-04-2010
0.50
Fuselage Final Items: Electric Aileron Trim 3
Details
       

 04-04-2010
0.50
Fuselage Final Items: Electric Aileron Trim 1
Details
       

 04-02-2010
1.00
Fuselage Final Items: Air inlet scoops Screens
Details
       

 04-02-2010
0.20
Fuselage Final Items: Air inlet scoops 7
Details
       

 04-02-2010
0.20
Fuselage Final Items: Air inlet scoops 6
Details
       

 04-02-2010
0.20
Fuselage Final Items: Air inlet scoops 5
Details
       

 04-02-2010
0.20
Fuselage Final Items: Air inlet scoops 4
Details
       

 04-02-2010
0.20
Fuselage Final Items: Air inlet scoops 3
Details
       

 04-02-2010
0.20
Fuselage Final Items: Air inlet scoops 2
Details
       

 04-01-2010
0.20
Fuselage Final Items: Air inlet scoops 1
Details
       

 03-30-2010
0.10
Front Deck (Tip Up) 32: Rivet on Panel Brackets
Details
       

 03-30-2010
0.10
Front Deck (Tip Up) 31: Rivet on side brackets
Details
       

 03-30-2010
0.20
Front Deck (Tip Up) 30: Air Inlet Vent
Details
       

 03-28-2010
0.20
Front Deck (Tip Up) 29: Air Inlet Vent
Details
       

 03-28-2010
0.50
Front Deck (Tip Up) 28: Air Inlet Vent
Details
       

 03-28-2010
0.10
Front Deck (Tip Up) 27: Structure Complete
Details
       

 03-24-2010
1.00
Front Deck (Tip Up) 26: Installed Panel Angles
Details
       

 03-24-2010
0.50
Front Deck (Tip Up) 25: Make Panel Angles
Details
       

 03-24-2010
0.50
Front Deck (Tip Up) 24: Dimple Firewall more
Details
       

 03-24-2010
0.30
Front Deck (Tip Up) 23: Dimple Firewall
Details
       

 03-24-2010
0.30
Front Deck (Tip Up) 22: Dimple Top Skin
Details
       

 03-24-2010
1.00
Front Deck (Tip Up) 21: Prepare Top Skin
Details
       

 03-24-2010
0.30
Front Deck (Tip Up) 20: Drill top skin
Details
       

 03-22-2010
0.50
Front Deck (Tip Up) 19: Drill top skin
Details
       

 03-22-2010
0.20
Front Deck (Tip Up) 18: Install into fuselage
Details
       

 03-22-2010
0.50
Front Deck (Tip Up) 17: Outboard sub panels
Details
       

 03-22-2010
1.00
Front Deck (Tip Up) 16: Platenuts & Rivet
Details
       

 03-20-2010
0.10
Front Deck (Tip Up) 15: Debur and prime
Details
       

 03-20-2010
1.00
Front Deck (Tip Up) 14: Seal Support Brackets
Details
       

 03-20-2010
1.00
Front Deck (Tip Up) 13: Engine Control Bracket
Details
       

 03-20-2010
0.20
Front Deck (Tip Up) 12: Fwd Fuse Channels
Details
       

 03-19-2010
0.10
Front Deck (Tip Up) 11: Trim and fix 2 close holes
Details
       

 03-19-2010
0.30
Front Deck (Tip Up) 10: Center Sub Channel
Details
       

 03-18-2010
0.50
Front Deck (Tip Up) 9: Make the Channel
Details
       

 02-26-2010
0.20
Front Deck (Tip Up) 8: Make Angles
Details
       

 02-26-2010
0.20
Front Deck (Tip Up) 7: Make Angles
Details
       

 02-26-2010
0.50
Front Deck (Tip Up) 6: Make Angles
Details
       

 02-26-2010
0.50
Front Deck (Tip Up) 5: Make Angles
Details
       

 02-26-2010
0.20
Front Deck (Tip Up) 4: Make Angles
Details
       

 02-26-2010
0.50
Front Deck (Tip Up) 3: Make Angles
Details
       

 02-26-2010
1.00
Front Deck (Tip Up) 2: Make Angles
Details
       

 02-26-2010
1.00
Front Deck (Tip Up) 1: Make Angles
Details
       

 02-24-2010
0.20
Cabin Frame Roll Bar 41: Paint channel parts
Details
       

 02-24-2010
0.50
Cabin Frame Roll Bar 40: Paint channel parts
Details
       

 02-24-2010
0.50
Cabin Frame Roll Bar 39: Paint channel parts
Details
       

 02-22-2010
0.50
Cabin Frame Roll Bar 38: Prime channel parts
Details
       

 02-22-2010
1.00
Cabin Frame Roll Bar 37: Cover for channel
Details
       

 02-22-2010
0.30
Cabin Frame Roll Bar 36: Smooth & Paint Frame
Details
     

 02-22-2010
1.00
Cabin Frame Roll Bar 35: Pop rivet Frame
Details
       

 02-22-2010
0.30
Cabin Frame Roll Bar 34: Riveted Angles
Details
       

 02-22-2010
0.10
Cabin Frame Roll Bar 33: Prime scratches
Details
       

 02-22-2010
0.30
Cabin Frame Roll Bar 32: Drill inboard holes
Details
       

 02-22-2010
1.00
Cabin Frame Roll Bar 31a: Platenutes
Details
       

 02-22-2010
0.30
Cabin Frame Roll Bar 31: Drill aft holes
Details
       

 02-20-2010
0.20
Cabin Frame Roll Bar 30: Drill Frame to angles
Details
       

 02-18-2010
0.20
Cabin Frame Roll Bar 29: Check position of frame
Details
       

 02-18-2010
0.10
Cabin Frame Roll Bar 28: Overhead Channel
Details
       

 02-18-2010
0.20
Cabin Frame Roll Bar 27: Overhead Channel
Details
       

 02-18-2010
0.30
Cabin Frame Roll Bar 26: Sand off angle edge
Details
       

 02-18-2010
0.25
Cabin Frame Roll Bar 25: Drill the angles
Details
       

 02-18-2010
0.50
Cabin Frame Roll Bar 24: Position the angle
Details
       

 02-18-2010
0.50
Cabin Frame Roll Bar 23: Position the angle
Details
       

 02-18-2010
0.20
Cabin Frame Roll Bar 22: Trim for radius of angle
Details
       

 02-18-2010
0.50
Cabin Frame Roll Bar 21: Rivet together angles
Details
       

 02-18-2010
1.00
Cabin Frame Roll Bar 20: Assemble Frame
Details
       

 02-16-2010
1.00
Cabin Frame Roll Bar 19: Rivet plates to channels
Details
       

 02-16-2010
0.50
Cabin Frame Roll Bar 18: Measuring height
Details
       

 02-16-2010
0.10
Cabin Frame Roll Bar 17: Drill overhead angle
Details
       

 02-16-2010
0.30
Cabin Frame Roll Bar 16: Rear Angle Squeeze
Details
       

 02-16-2010
1.00
Cabin Frame Roll Bar 15: Countersinking
Details
       

 02-16-2010
0.10
Cabin Frame Roll Bar 14: Closing the gap
Details
       

 02-16-2010
0.50
Cabin Frame Roll Bar 13: Drill the forward straps
Details
       

 02-16-2010
0.50
Cabin Frame Roll Bar 12: Drill the straps
Details
       

 02-16-2010
1.00
Cabin Frame Roll Bar 11: Drill the straps
Details
       

 02-16-2010
1.00
Cabin Frame Roll Bar 10: Drill 3 more channels
Details
       

 02-14-2010
0.10
Cabin Frame Roll Bar 9: Drill Channel Holes
Details
       

 02-14-2010
1.00
Cabin Frame Roll Bar 8: Drill Channel Holes
Details
       

 02-14-2010
1.00
Cabin Frame Roll Bar 7: Make Mounting Angles
Details
       

 02-14-2010
0.20
Cabin Frame Roll Bar 6: Drill the plate
Details
       

 02-14-2010
0.20
Cabin Frame Roll Bar 5: Gaps fixed
Details
       

 02-14-2010
0.10
Cabin Frame Roll Bar 4: Gaps
Details
       

 02-14-2010
0.50
Cabin Frame Roll Bar 3: Clamp it
Details
       

 02-14-2010
0.50
Cabin Frame Roll Bar 2: Drill the hole
Details
       

 02-14-2010
0.10
Cabin Frame Roll Bar 1: The parts
Details
       

 02-12-2010
1.00
Rivet Aft Cargo Side Walls
Details
       

 02-11-2010
0.50
Remove Empennage and push rod
Details
       

 02-10-2010
0.30
Rivet attach plate to vertical stabilizer
Details
       

 02-09-2010
0.25
Tie Down is on. Fairing Thoughts. 7A cut away
Details
       

 02-09-2010
1.00
Mount Rudder 6: Rivet on tie down bracket
Details
       

 02-07-2010
0.50
Mount Rudder 5: Drill wire hole
Details
       

 02-07-2010
0.50
Mount Rudder 4: Final Stop Fit
Details

 02-07-2010
0.50
Mount Rudder 3: Adjusting Rudder Stop
Details
       

 02-07-2010
0.50
Mount Rudder 2: Hang rudder
Details
       

 02-07-2010
0.50
Mount Rudder 1: Make Rudder Stop
Details
       

 02-05-2010
1.00
Mount Vertical Stabilizer (Fin) 6
Details
       

 02-05-2010
1.00
Mount Vertical Stabilizer (Fin) 5
Details
       

 02-05-2010
0.25
Mount Vertical Stabilizer (Fin) 4
Details
       

 02-05-2010
0.50
Mount Vertical Stabilizer (Fin) 3
Details
       

 02-05-2010
0.50
Mount Vertical Stabilizer (Fin) 2
       

 02-05-2010
0.50
Mount Vertical Stabilizer (Fin) 1
Details
       

 02-03-2010
1.00
Elevator Trim 2: Assemble and Install
Details
       

 02-03-2010
1.00
Elevator Trim 1: Bought used Kit
Details
       

 01-25-2010
0.20
Push Rod for Elevators 6
Details
       

 01-25-2010
0.20
Push Rod for Elevators 5
Details
       

 01-25-2010
0.40
Push Rod for Elevators 4
Details
       

 01-25-2010
0.50
Push Rod for Elevators 3
Details
       

 01-25-2010
1.00
Push Rod for Elevators 2
Details
       

 01-25-2010
0.10
Push Rod for Elevators 1
Details
       

 01-23-2010
1.00
Attach HS to Fuselage 12: Rear Spar
Details
       

 01-21-2010
1.00
Attach HS to Fuselage 11: The fix
Details
       

 01-21-2010
1.00
Attach HS to Fuselage 10: The fix
Details
       

 01-20-2010
1.00
Attach HS to Fuselage 9: The fix
Details
       

 01-20-2010
1.00
Attach HS to Fuselage 8: Quality check on holes
Details
       

 01-20-2010
1.00
Attach HS to Fuselage 7: Drill Holes
Details
       

 01-20-2010
1.00
Attach HS to Fuselage 6: Measure and square up
Details
       

 01-18-2010
0.50
Attach HS to Fuselage 5: Set HS in place
Details
       

 01-18-2010
0.50
Attach HS to Fuselage 4: Change trim tab horn
Details
       

 01-18-2010
0.50
Attach HS to Fuselage 3: Change trim tab horn
Details
       

 01-18-2010
1.00
Attach HS to Fuselage 2: Drill horn hole
Details
       

 01-18-2010
0.50
Attach HS to Fuselage 1: Drill horn hole
Details
       

 01-13-2010
1.00
Fwd Covers Cont: Finished Off Forward Covers
Details
     

 01-12-2010
0.50
Andair Fuel Pump Kit 11
Details
       

 01-12-2010
0.50
Andair Fuel Pump Kit 10
Details
       

 01-11-2010
0.50
Andair Fuel Pump Kit 9
Details
       

 01-10-2010
0.50
Andair Fuel Pump Kit 8
Details
       

 01-10-2010
0.50
Andair Fuel Pump Kit 7
Details
       

 01-10-2010
0.50
Andair Fuel Pump Kit 6
Details
       

 01-10-2010
0.50
Andair Fuel Pump Kit 5
Details
       

 01-10-2010
0.50
Andair Fuel Pump Kit 4
Details
       

 01-10-2010
1.00
Andair Fuel Pump Kit 3
Details
       

 01-10-2010
1.00
Andair Fuel Pump Kit 2
Details
       

 01-10-2010
0.50
Andair Fuel Pump Kit 1
Details
       

 01-06-2010
0.20
Tubing: Brake Lines 6: High Pressure Lines
Details
       

 01-06-2010
0.50
Tubing: Brake Lines 5: More tube routing
Details
       

 01-06-2010
0.50
Tubing: Brake Lines 4: Left tube routing
Details
       

 01-05-2010
1.00
Tubing: Brake Lines 3: More fittings
Details
       

 01-03-2010
1.00
Tubing: Finish the Vent Lines (Final Install)
Details
       

 01-02-2010
1.00
Use Proseal on some gaps
Details
       

 01-01-2010
1.00
Remove Wing 11: Finish Flap Mechanicsm
Details
       

 01-01-2010
1.00
Remove Wing 10: Finish Control Stick
Details
       

 12-29-2009
1.00
Remove Wing 9: Trim Spar Webs
Details
       

 12-29-2009
1.00
Remove Wing 8: Re-route pitot and AOA lines
Details
       

 12-29-2009
1.00
Remove Wing 7: Wing nose platenuts
Details
       

 12-29-2009
1.00
Remove Wing 6: Platenuts on top and bottom
Details
       

 12-29-2009
1.00
Remove Wing 5: Platenuts on wing rib
Details
       

 12-29-2009
0.20
Remove Wing 4: Prepare bottom Wing Skins
Details
       

 12-29-2009
0.10
Remove Wing 3: Summary of what I did cont.
Details
       

 12-29-2009
0.20
Remove Wing 2: Summary of what I did
Details
       

 12-29-2009
1.00
Remove Wing 1: Remove
Details
       

 12-27-2009
0.50
Tubing: Brake Lines 2: Resevoir
Details
       

 12-27-2009
0.10
Tubing: Brake Lines 1: Outside fitting & Resevoir
Details
       

 12-26-2009
0.50
Tubing: Fuel Line 6
Details
       

 12-26-2009
0.50
Tubing: Fuel Line 5 (Kinks)
Details
       

 12-26-2009
0.50
Tubing: Fuel Line 4
Details
       

 12-26-2009
0.50
Tubing: Fuel Line 3
Details
       

 12-26-2009
0.50
Tubing: Fuel Line 2
Details
       

 12-26-2009
0.50
Tubing: Fuel Line 1
Details
       

 12-25-2009
0.50
Tubing: Vent Line to tank
Details
       

 12-24-2009
0.10
Tubing: Vent Line 6: Add screens to fittings
Details
       

 12-24-2009
0.50
Tubing: Vent Line 5
Details
       

 12-24-2009
0.50
Tubing: Vent Line 4
Details
       

 12-24-2009
0.50
Tubing: Vent Line 3
Details
       

 12-24-2009
0.50
Tubing: Vent Line 2
Details
       

 12-24-2009
0.50
Tubing: Vent Line 1
Details
       

 12-22-2009
0.50
Aileron Rigging 3: Adjusting and tightening
Details
     

 12-22-2009
0.50
Aileron Rigging 2: Measuring level and parallel
Details
       

 12-22-2009
0.50
Aileron Rigging 1: Set bell crank neutral
Details
       

 12-19-2009
0.20
Wing Root Fairing 5: Snip off excess
Details
       

 12-19-2009
0.20
Wing Root Fairing 4: Mark 3/16 clearance
Details
       

 12-19-2009
0.20
Wing Root Fairing 3: Drill & enlarge holes
Details
       

 12-19-2009
0.20
Wing Root Fairing 2: Mark holes and drill
Details
       

 12-19-2009
0.50
Wing Root Fairing 1: Prep and cleco
Details
       

 12-17-2009
1.00
Flap Push Rod Hole 6: Adjust until it works
Details
       

 12-17-2009
1.00
Flap Push Rod Hole 5: Flap / Fuselage Fit
Details
       

 12-16-2009
0.50
Flap Push Rod Hole 4: Trim inboard edge
Details
       

 12-16-2009
0.50
Flap Push Rod Hole 3: Iterate
Details
       

 12-16-2009
1.00
Flap Push Rod Hole 2: Enlarge w/ sanding drum
Details
       

 12-16-2009
0.50
Flap Push Rod Hole 1: Initial cut
Details
       

 12-15-2009
0.50
Wing Forward Mounting Bracket 3
Details
       

 12-15-2009
0.50
Wing Forward Mounting Bracket 2
Details
       

 12-15-2009
0.50
Wing Forward Mounting Bracket 1
Details
       

 12-13-2009
1.00
Wing Alignment 6: Drilling Wing to Fuselage skin
Details
       

 12-13-2009
0.50
Wing Alignment 5: Drilling Aft Spar
Details
       

 12-12-2009
1.00
Wing Alignment 4: Measuring angle of attack
Details
       

 12-12-2009
1.00
Wing Alignment 3: Removing sweep
Details
       

 12-12-2009
1.00
Wing Alignment 2: Equal distance
Details
       

 12-12-2009
1.00
Wing Alignment 1: Leveling
Details
       

 12-11-2009
1.00
Wing Mounting 10: Removing bolts
Details
       

 12-10-2009
1.00
Wing Mounting 9: Rear spar issue
Details
       

 12-10-2009
1.00
Wing Mounting 8: Got the 2 bolts in per wing
Details
       

 12-10-2009
1.00
Wing Mounting 7: Sliding it in a litlle
Details
       

 12-10-2009
1.00
Wing Mounting 6: Initial Wing Mounting
Details
       

 12-10-2009
0.50
Wing Mounting 5: Penetration Alignments
Details
       

 12-09-2009
0.10
Wing Mounting 4: Issue Fairing screw placement
Details
       

 12-09-2009
0.50
Wing Mounting 3: Centering bolts
Details
       

 12-09-2009
1.00
Wing Mounting 2: Prepare Ailerons and Sticks
Details
       

 12-09-2009
1.00
Wing Mounting 1: Prepare
Details
       

 12-06-2009
0.50
Landing Gear Weldmount Installation 8
Details
       

 12-05-2009
0.50
Landing Gear Weldmount Installation 7
Details
       

 12-05-2009
0.50
Landing Gear Weldmount Installation 6
Details
       

 12-05-2009
0.50
Landing Gear Weldmount Installation 5
Details
       

 12-05-2009
0.50
Landing Gear Weldmount Installation 4
Details
       

 12-05-2009
0.20
Landing Gear Weldmount Installation 3
Details
       

 12-05-2009
0.50
Landing Gear Weldmount Installation 2
Details
       

 12-04-2009
1.00
Landing Gear Weldmount Installation 1
Details
       

 12-03-2009
0.20
Flap Mechanism 17 Install back into fuselage
Details
       

 12-03-2009
0.20
Flap Mechanism 16 Rivet on doubler
Details
       

 12-03-2009
0.20
Flap Mechanism 15 More platenuts
Details
       

 12-03-2009
0.50
Flap Mechanism 14 Rivet platenuts, notch cover
Details
       

 12-03-2009
0.50
Flap Mechanism 13 Rivet Together
Details
       

 12-02-2009
0.10
Flap Mechanism 12 Install Side Covers and Drill
Details
       

 12-02-2009
0.20
Flap Mechanism 11 Installing Braces into Fuselage
Details
       

 12-02-2009
0.50
Flap Mechanism 10 Match drilling angles/ braces
Details
       

 12-01-2009
0.10
Flap Mechanism 9 Match drilling the doubler
Details
       

 12-01-2009
0.10
Flap Mechanism 8 Bracket and Attach angles
Details
       

 12-01-2009
0.10
Flap Mechanism 7 Spacer and Attach Bracket
Details
       

 12-01-2009
1.00
Flap Mechanism 6 Details Doubler, Angle, Angle
Details
       

 12-01-2009
0.20
Flap Mechanism 5 Drilling Block Holes in floor
Details
       

 12-01-2009
0.10
Flap Mechanism 4 Trim Center Cargo Floor Cover
Details
       

 12-01-2009
0.10
Flap Mechanism 3 Drilling Hole in Actuator End
Details
       

 12-01-2009
0.20
Flap Mechanism 2 Cut and Drill Bearing Block
Details
       

 12-01-2009
0.20
Flap Mechanism 1 Ream holes to 1/4
Details
       

 11-30-2009
0.50
Forward Covers 13 Stick Boot Rings
Details
       

 11-30-2009
0.50
Forward Covers 12 Stick Boot Rings
Details
       

 11-29-2009
0.50
Forward Covers 11 Stick Boot Rings
Details
       

 11-29-2009
0.50
Forward Covers 10 Stick Boot Rings
Details
       

 11-27-2009
0.50
Forward Covers 9 Box holding selector valve
Details
       

 11-27-2009
0.50
Forward Covers 8 Valve Plate Trim Off
Details
       

 11-27-2009
0.50
Forward Covers 7 Andair Fuel Selector Valve
Details
       

 11-27-2009
1.00
Forward Covers 6 Fuel Pump Brackets
Details
       

 11-26-2009
0.50
Forward Covers 5 Riveting Platenuts
Details
       

 11-26-2009
0.50
Forward Covers 4 Bending Louvers
Details
       

 11-26-2009
0.50
Forward Covers 3 Drilling Center Cover Holes
Details
       

 11-26-2009
0.50
Forward Covers 2 Installing Center Cover for Fit
Details
       

 11-26-2009
0.50
Forward Covers 1 Laying out Parts
Details
       

 11-25-2009
1.00
Rotisserie 5 It works, finally
Details
       

 11-25-2009
0.50
Rotisserie 4 Bolt on Brackets & Saw Horse
Details
       

 11-25-2009
1.00
Rotisserie 3 Bushing for bolting on brackets
Details
       

 11-25-2009
0.50
Rotisserie 2 Drilling Firewall & Bushings
Details
       

 11-25-2009
1.00
Rotisserie 1 Starting up after 2 week break
Details
       

 11-11-2009
0.10
Covers 1
Details
     

 11-10-2009
0.50
Remove top skin and fasten down floors
Details
       

 11-09-2009
0.10
Tunnel Cover 4
Details
       

 11-09-2009
0.25
Tunnel Cover 3
Details
       

 11-09-2009
0.50
Tunnel Cover 2
Details
       

 11-09-2009
0.50
Tunnel Cover 1
Details
       

 11-07-2009
0.10
Seat Backs 12
Details
       

 11-07-2009
0.50
Seat Backs 11
Details
       

 11-07-2009
0.50
Seat Backs 10
Details
       

 11-06-2009
0.50
Seat Backs 9
Details
       

 11-06-2009
0.50
Seat Backs 8
Details
       

 11-06-2009
0.50
Seat Backs 7
Details
       

 11-05-2009
0.25
Seat Backs 6
Details
       

 11-05-2009
0.50
Seat Backs 5
Details
       

 11-05-2009
0.50
Seat Backs 4
Details
       

 11-04-2009
0.50
Seat Backs 3
Details
       

 11-04-2009
0.50
Seat Backs 2
Details
       

 11-04-2009
0.50
Seat Backs 1
Details
       

 11-02-2009
0.50
Aft Seat Floors 2
Details
       

 11-02-2009
0.50
Aft Seat Floors 1
Details
       

 10-30-2009
1.00
Cargo Bulkhead 3: Tap, Prime & Paint
Details
       

 10-30-2009
1.00
Cargo Bulkhead 2: Drill Platenut Holes
Details
       

 10-30-2009
1.00
Cargo Bulkhead 1: Trim Corners, Drill Holes
Details
       

 10-23-2009
0.50
Cargo Fwd Side Walls
Details
       

 10-22-2009
1.00
Cargo Aft Side Walls
Details
       

 10-20-2009
1.00
Install Step 5: Rivet and Bolt it on
Details
       

 10-20-2009
0.50
Install Step 4: Drill Plastic Block holes and Prim
Details
       

 10-20-2009
1.00
Install Step 3: Drill Plastic Block & Enlarge hole
Details
       

 10-20-2009
1.00
Install Step 2: Match drill, Trim and Bend
Details
       

 10-20-2009
1.00
Install Step 1: Position and drill
Details
       

 10-18-2009
1.00
Aft Deck Rivet it on
Details
       

 10-16-2009
0.50
Rudder Cable Fairing 3
Details
       

 10-16-2009
0.50
Rudder Cable Fairing 2
Details
       

 10-16-2009
1.00
Rudder Cable Fairing 1
Details
       

 10-15-2009
0.20
Cable Covers on Shoulder Harness Cables
Details
     

 10-08-2009
0.50
Wiring Runs to Tail Light & Elevator Trim
Details
       

 10-07-2009
0.20
Rudder Cable Runs and Static Line stored
Details
       

 10-06-2009
1.00
Static Tube Run from Safe Air
Details
       

 10-04-2009
0.50
F-787 Stiffener Drill two holes in angle
Details
       

 10-04-2009
1.00
F-656 Corner Brackets Drill & Rivet in place
Details
       

 10-04-2009
2.00
Aft Top Skins Cleco and Drill
Details
       

 10-03-2009
1.00
F-656 corner brackets position and prep
Details
       

 10-02-2009
0.10
Elevator Bell Crank
Details
       

 10-01-2009
0.10
Vertical F-728 Vertical Rib
Details
       

 09-30-2009
1.00
More plate nuts and seat shoulder harnes brackets
Details
       

 09-28-2009
0.50
F-695 Fwd Fuselage Gusset 3
Details
       

 09-28-2009
1.00
F-695 Fwd Fuselage Gusset 2
Details
       

 09-28-2009
0.50
F-695 Fwd Fuselage Gusset 1
Details
       

 09-26-2009
1.00
Canopy Decks: Static Line Clips
Details
       

 09-26-2009
1.00
Canopy Decks: Prime and Cleco in Place
Details
       

 09-26-2009
1.00
Canopy Decks: Position and Drill
Details
       

 09-26-2009
0.20
Canopy Decks: F-757 Plate
Details
       

 09-24-2009
1.00
Aft Deck: Rudder Cable Fairing
Details
       

 09-24-2009
0.50
Aft Deck: Add elevator stop and bulkhead
Details
       

 09-24-2009
0.10
Aft Deck: Tie Down and Rudder Cable
Details
       

 09-22-2009
0.10
Aft Deck: Spacers Check Edge Distance
Details
       

 09-22-2009
0.50
Aft Deck: Level it and drill it.
Details
       

 09-21-2009
1.00
Aft Deck: Make some spacers
Details
       

 09-19-2009
0.50
Pick Ups: Wing rear spar bolt and Cherry Max rivet
Details
       

 09-19-2009
0.50
Pick Ups: Pop rivet, #10 Screw, Rivet aft end
Details
       

 09-18-2009
0.10
Photos after flipping
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.