Powered By Kitlog Pro v2.0
Don's Web Site
RV7a
Empennage
Work Logs Found:
36
Category Work Time:
172 Hours
Date
Hours
Work Log Summary
Details
05-30-2010
4.00
Assembly
Details
04-29-2010
8.00
Closing the Elevators
Details
04-22-2010
2.00
Closing Rudder Leading Edge
Details
04-06-2010
1.00
Finishing the Elevators
Details
04-04-2010
6.00
Fitting Trim Tab
Details
03-20-2010
2.00
Preparation of Rudder
Details
03-17-2010
6.00
Rudder
Details
03-10-2010
2.00
Left Elevator
Details
03-03-2010
2.00
Assembly of Elevators
Details
03-02-2010
3.00
Damping Vibrations
Details
02-23-2010
3.00
Trim Tab
Details
02-17-2010
2.00
Dimpling Rudder
Details
01-04-2010
5.00
More riveting
Details
12-28-2009
6.00
Riveting
Details
12-17-2009
6.00
Priming
Details
12-14-2009
7.00
Alodining
Details
12-03-2009
9.00
CLeaning
Details
10-31-2009
8.00
Elevators
Details
09-30-2009
2.00
Aligning the seam
Details
09-29-2009
1.00
Rudder
Details
09-01-2009
12.00
Rudder
Details
08-26-2009
12.00
Riveting HS
Details
08-02-2009
4.00
Riveting HS
Details
07-19-2009
6.00
Priming skins
Details
07-09-2009
4.00
Riveting Spar
Details
07-01-2009
4.00
Priming the ribs and spars
Details
06-28-2009
4.00
Alodine skins
Details
06-27-2009
5.00
Alodining Skins
Details
06-11-2009
0.00
Results of alodine treatment
Details
06-11-2009
6.00
Alodine treatment
Details
04-21-2009
3.00
Vertical Stabilizer
Details
04-14-2009
6.00
Vertical Stabilizer
Details
03-30-2009
1.00
Horizol Stabilizert
Details
03-16-2009
4.00
Horizontal Stabilizer
Details
03-15-2009
4.00
Horizontal Stabiliser
03-02-2009
12.00
Horizontal Stabiliser
Details
SITE NAVIGATION
Contact Builder
RV7a Home
Category
# Logs
# Hours
All
60
300
Empennage
36
172
Miscellaneous
5
40
Wings
19
88
Copyright © 2001-2024 Matronics. All Rights Reserved.