Powered By Kitlog Pro v2.0
Tims Web Site
RV8A
Fuselage
Work Logs Found:
26
Category Work Time:
26 Hours
Date
Hours
Work Log Summary
Details
07-11-2009
1.00
final torque elevator control horn bolts elevator
07-06-2009
1.00
Right seat floor
07-06-2009
1.00
Nutplates to fwd seat floor
07-06-2009
1.00
Left seat floor
07-06-2009
1.00
floor stiffners
07-06-2009
1.00
aft baggage floor
07-03-2009
1.00
baggage door lock
06-14-2009
1.00
Baggage door assembly
05-28-2009
1.00
install windscreen support base
05-28-2009
1.00
Forward upper fuselage assembly
05-26-2009
1.00
elevator trim contrl cable
05-25-2009
1.00
Shoulder harness anchors, canopy rail receptacle
05-25-2009
1.00
make boards for work in tail cone
05-08-2009
1.00
assemble pushrod assembly to control sitcks
05-04-2009
1.00
shape control stick bushing
05-04-2009
1.00
file tubes that sleeve control stick bushings
05-04-2009
1.00
assemble control sticks
04-26-2009
1.00
leveling fuselage
04-19-2009
1.00
Throttle quadrant cover and cable anchor
04-18-2009
1.00
assemble F841 pushrod
04-18-2009
1.00
assemble F840 pushrod assembly
04-18-2009
1.00
assemble elevator bellcrank
04-16-2009
1.00
Fuel Valve
04-16-2009
1.00
Console Side ribs
04-15-2009
1.00
Consoles and Seat Ramp
02-24-2009
1.00
Install vents
SITE NAVIGATION
Contact Builder
RV8A Home
Category
# Logs
# Hours
All
150
248
Brakes
3
3
canopy
7
7
Empennage
8
8
Flaps
1
1
Fuel system
7
7
Fuel Tanks
26
42
Fuselage
26
26
Horizontal Stabilize
21
33
Rudder
4
4
Shop Supplies
9
54
Taxi & landing Light
4
11
Wings
34
52
Zodiac CH 601 XL Home
Copyright © 2001-2024 Matronics. All Rights Reserved.