Date
|
Hours
|
Work Log Summary

|
Details

|
06-06-2016
|
2.00
|
Driving and installing remaining wing attachment b
|
Details
|
|
|
06-05-2016
|
1.00
|
Leveling and dropping plumb lines to square wings
|
Details
|
  |
|
05-20-2016
|
3.00
|
Attached Wings to Fuselage
|
|
|
|
05-13-2016
|
2.00
|
Transported Fuselage from Garage to Hanger
|
|
|
|
03-27-2016
|
3.00
|
Soldering finished on Pilot control stick
|
|
|
|
08-30-2014
|
1.00
|
Primer Paint Battery Box Angles, and other parts.
|
Details
|
|
|
08-24-2014
|
3.00
|
Front Spar Attach Angles
|
Details
|
|
|
05-24-2012
|
0.00
|
AIRPLANE PACKED IN UHAUL FOR ALASKA TRIP
|
Details
|
  |
|
02-16-2012
|
2.00
|
Tie wrap Electical, Battery, control Rod
|
Details
|
 |
|
02-04-2012
|
1.00
|
Finished Riveting top Aft Skin
|
|
  |
|
09-17-2011
|
3.00
|
Construct Plywood floor, Aft Fuselage
|
Details
|
 |
|
09-12-2011
|
1.00
|
Rivet Rudder Stops
|
|
 |
|
09-10-2011
|
1.00
|
Clecoed and started riveting Aft Top Skin
|
Details
|
|
|
08-12-2011
|
1.50
|
Painted interior Grey parts.
|
Details
|
|
|
08-07-2011
|
1.50
|
Mounted Vinyl "N" numbers on Fuselage
|
|
 |
|
06-07-2011
|
2.00
|
Landing gear mounted
|
Details
|
 |
|
06-02-2011
|
0.50
|
Rivet Vertical Stabilizer Front Spar/Bracket /Spac
|
|
 |
|
05-29-2011
|
2.00
|
Rivet Platenuts on Instrument Sub-Panels
|
|
 |
|
05-28-2011
|
1.00
|
Fabricate Brackets for ELT/Strobe Mounting platfor
|
Details
|
|
|
05-26-2011
|
2.00
|
Installed SV Vent in Fuselage
|
|
|
|
05-24-2011
|
1.00
|
Finished Baggage Door Lock Installation
|
|
|
|
05-23-2011
|
3.00
|
Rivet Baggage Door/ Begin Lock Install
|
|
|
|
05-22-2011
|
2.00
|
Prime Painted Baggage Door and Structures
|
Details
|
|
|
05-11-2011
|
1.50
|
Deburred and Dimpled Baggage Door
|
|
 |
|
05-09-2011
|
2.00
|
Deburred Front Top Skins/Structures
|
Details
|
 |
|
05-08-2011
|
2.00
|
Baggage Door Started, drilled out, Hinge work.
|
|
|
|
05-05-2011
|
3.00
|
Fabricate/Adjust Forward Elevator Horn Stop
|
Details
|
|
|
05-04-2011
|
4.00
|
Intrument Sub Panels/Windscreen Support
|
Details
|
|
|
05-03-2011
|
2.00
|
Drilled Out Windscreen Support/Rudder Stops
|
Details
|
 |
|
05-01-2011
|
1.00
|
Fabricated Static Line Fittings (6)
|
|
  |
|
05-01-2011
|
1.00
|
Fabricate Rear Seat Belt Anchors
|
|
  |
|
04-30-2011
|
1.00
|
Checked Elevator Travel
|
|
  |
|
04-27-2011
|
2.00
|
Drilled Elevator Horns and Connected Control Rods
|
|
  |
|
04-25-2011
|
4.00
|
Horizontal and Vertical Stabilizer Work
|
|
|
|
04-24-2011
|
3.00
|
Empennage Attachment Started
|
|
|
|
04-22-2011
|
1.00
|
Static Port and Line Installed
|
|
 |
|
04-20-2011
|
1.00
|
Grey Painted Interior Console
|
|
 |
|
04-17-2011
|
1.00
|
Prime Paint Miscelllaneous Parts
|
|
 |
|
04-16-2011
|
2.00
|
Installed Aileron Electric Trim Servo and Rod
|
|
  |
|
04-12-2011
|
0.50
|
Flap Motor Started
|
|
  |
|
04-10-2011
|
3.00
|
Fuel Line fabricated and installed
|
|
  |
|
04-08-2011
|
2.00
|
Fuel Vent lines fabricated and installed
|
|
  |
|
04-07-2011
|
1.00
|
Rivet Aft Rudder Cable Fairings Anchor
|
|
|
|
04-06-2011
|
1.50
|
Intalled Brake Reservoir and Initial Elbow Fitting
|
|
 |
|
04-05-2011
|
1.00
|
Rudder Cables Installed
|
|
  |
|
04-04-2011
|
2.00
|
Connect Bellcrank Assembly to Control Rods/Sticks
|
|
|
|
04-03-2011
|
2.00
|
Rivet Bottom Forward/Cooling Ramp
|
|
|
|
03-24-2011
|
2.00
|
Cooling Ramp Installed/Forward Bottom Skin Riveted
|
|
|
|
03-14-2011
|
2.00
|
Rivet Rudder Support Floor Angles/ Front Bottom Pa
|
|
|
|
03-12-2011
|
1.00
|
Assemble Rudder/Brake Pedals
|
|
 |
|
03-10-2011
|
2.00
|
Paint Interior Grey/ Seats, and redo console
|
Details
|
|
|
03-07-2011
|
2.00
|
Paint Interior Grey/ floors, consoles
|
|
  |
|
03-06-2011
|
3.00
|
Miscellaneous, Bracket Work, Deburring, Dimpling
|
Details
|
|
|
03-05-2011
|
1.00
|
Prime Paint Control Tubes/ Rivet and Console
|
Details
|
 |
|
03-04-2011
|
2.00
|
Cut Fuel Gauge Holes/ Paint Booth Work
|
|
 |
|
02-26-2011
|
5.00
|
Elevator Control System Started
|
|
|
|
02-24-2011
|
2.00
|
Fuel Gauge Cover Started/ Finish Seat Ramps
|
|
|
|
02-21-2011
|
2.00
|
Finish Rear Baggage Anchor
|
|
 |
|
02-20-2011
|
2.00
|
Start Rear Baggage Anchor
|
|
  |
|
02-19-2011
|
2.00
|
Finish Seat Ramps and Aux. Longeron Platenuts
|
|
  |
|
02-16-2011
|
3.00
|
Finish Rear Seat Riveting and Seat Ramps
|
|
 |
|
02-15-2011
|
3.00
|
Rivet Seats Front and Back
|
|
 |
|
02-13-2011
|
2.00
|
Rivet Foot Wells
|
|
|
|
02-12-2011
|
2.00
|
Back Rivet Floor Stiffeners and Hinges
|
|
|
|
02-11-2011
|
3.00
|
Prime Painted Seates and Floor
|
|
|
|
01-09-2011
|
2.00
|
Prime paint seat floors/rear baggage/misc parts
|
|
|
|
01-08-2011
|
3.00
|
Deburred floor/rear baggage skin edges
|
|
  |
|
01-02-2011
|
1.50
|
Dimpled seat floors
|
|
  |
|
12-29-2010
|
3.00
|
Drillled out seat floor stiffeners/rear seat hinge
|
|
|
|
12-21-2010
|
2.50
|
Right/Left Gear Weldment Scews
|
Details
|
 |
|
12-19-2010
|
1.00
|
Rivet Right Gear weldment to forward side skin
|
|
 |
|
12-18-2010
|
1.00
|
Riveting Left Gear Weldment to forward side skin
|
|
 |
|
11-13-2010
|
3.00
|
Flap bearings/foot wells
|
Details
|
|
|
11-02-2010
|
3.00
|
Drill out seat floors/Aft baggage
|
|
|
|
10-25-2010
|
1.00
|
Start seat floors/wells
|
|
|
|
10-24-2010
|
2.00
|
Pulled Wing spar blocks and riveted AN470 rivets
|
|
 |
|
10-23-2010
|
5.00
|
Rivet bottom skin center/forward side skins
|
|
|
|
10-14-2010
|
1.00
|
Prime paint gear box interior/rivet center forward
|
|
|
|
10-09-2010
|
0.50
|
Drilled with unibit AN4 Gear access holes
|
Details
|
 |
|
10-04-2010
|
1.00
|
Continue belly 3/32 flush riveting
|
|
  |
|
10-01-2010
|
1.00
|
Belly Riveting, and forward mid-longerons (3/32)
|
|
|
|
09-14-2010
|
1.00
|
Deburred Holes Front and Rear Seat Backs
|
Details
|
|
|
09-13-2010
|
2.00
|
Deburred and Dimpled Forward Bottom Skins
|
|
|
|
09-12-2010
|
2.00
|
Drilling Gear
|
Details
|
 |
|
09-12-2010
|
3.00
|
Drilled Out Main Landing Gear/Deburred Holes
|
Details
|
|
|
09-11-2010
|
3.00
|
Set-Up for Main Landing Gear Drilling
|
Details
|
|
|
09-10-2010
|
0.50
|
Started Bottom Forward Skins
|
|
  |
|
09-08-2010
|
1.00
|
Finished Drilling Out Front and Back Seat Backs
|
|
  |
|
09-07-2010
|
3.00
|
Started Front Seat Back/Rear Seat Back
|
|
  |
|
09-05-2010
|
3.00
|
Landing Gear Started (Drilling Blocks out)
|
|
  |
|
08-28-2010
|
4.00
|
Installed/Riveted Cockpit Rails/Seat Back Weldment
|
|
|
|
08-25-2010
|
2.00
|
Rivet Forward and Mid-Skins
|
|
|
|
08-15-2010
|
3.00
|
Rivet Forward and Mid-Skins
|
Details
|
|
|
08-14-2010
|
4.00
|
Rivet Aft Deck/ Start Fuel Lines
|
Details
|
|
|
08-08-2010
|
4.00
|
Rivet Aft Skin/Lower Longerons
|
Details
|
|
|
08-07-2010
|
5.00
|
Rivet Aft Skin and Finish Mid-Skins
|
|
 |
|
08-06-2010
|
1.50
|
Rivet Rt. Mid-Skin/Longerons/and arm rests
|
|
  |
|
08-05-2010
|
1.50
|
Rivet Mid-Skin/Top Longerons
|
Details
|
  |
|
08-04-2010
|
1.00
|
Rivet F818 to F808, F806A/F Gussets/F805B R/L
|
|
  |
|
07-31-2010
|
1.00
|
Riveted aft belly skin to baggage substructure
|
|
|
|
07-29-2010
|
2.00
|
Rivet right aft skin at bulkheads/longeron keepers
|
|
  |
|
07-28-2010
|
2.00
|
Rivet left aft skin at bulkheads/longeron keepers
|
|
  |
|
07-27-2010
|
4.00
|
Clecoed aft skins/belly skins/mid & lower longeron
|
|
|
|
07-26-2010
|
2.00
|
Clecoed bulkheads/rivet midskin to longerons
|
|
|
|
07-25-2010
|
1.50
|
Grey painted interior parts/battery tray/brackets
|
|
  |
|
07-24-2010
|
2.00
|
Prime painting misc. parts pump/filter brackets
|
Details
|
  |
|
07-23-2010
|
1.50
|
Battery tray drilling/deburring
|
|
|
|
07-22-2010
|
1.00
|
Started Fuel pump/filter brackets
|
|
  |
|
07-19-2010
|
1.00
|
Cover plate aft side skins platenuts/battery tray
|
|
  |
|
07-17-2010
|
3.00
|
Riveted seat rib angles/baggage ribs/F807
|
|
|
|
07-16-2010
|
1.00
|
Riveted upper right longeron
|
|
  |
|
07-15-2010
|
1.00
|
Riveted Left upper longerons
|
|
 |
|
07-14-2010
|
2.00
|
Riveted right midskin to arm rest supports
|
|
 |
|
07-13-2010
|
1.00
|
Clecoed left mid skin onto fuselage/upper longeron
|
|
 |
|
07-12-2010
|
2.00
|
Rivet mid skins to left arm rest substructure
|
|
|
|
07-11-2010
|
3.00
|
Grey Interior Painting on fuselage/longeron parts
|
|
|
|
07-08-2010
|
2.00
|
Prime painting longerons/fuselage substructure
|
|
  |
|
07-06-2010
|
2.00
|
Alumi-Prep/alodine longerons and remaining substru
|
|
  |
|
07-05-2010
|
2.00
|
Finished dimpling skins
|
|
  |
|
07-04-2010
|
5.00
|
Dimple and edge rolling skins
|
|
  |
|
07-03-2010
|
3.00
|
Finished seat rib assembly riveting
|
|
  |
|
07-02-2010
|
3.00
|
Rivet seat rib assembly to under skin
|
|
  |
|
06-30-2010
|
3.00
|
Rivet forward lower longerons/tail cone/attach cen
|
|
  |
|
06-29-2010
|
2.00
|
Finished substructure/bolted forward bottom longer
|
|
|
|
06-28-2010
|
3.00
|
Clecoed and Riveted Aft tail section
|
Details
|
|
|
06-27-2010
|
3.00
|
AKCO Prime painted Substructure and bulkheads
|
|
|
|
06-24-2010
|
3.00
|
Alumi prep/Alodine structural and bulkheads
|
|
|
|
06-22-2010
|
2.00
|
Dimpled aft side skins
|
|
  |
|
04-28-2010
|
30.50
|
Deburring structures and skins /Finished June 21st
|
Details
|
  |
|
04-27-2010
|
2.00
|
Countersinking continued
|
|
  |
|
04-25-2010
|
2.00
|
Countersinking and deburring continued
|
|
  |
|
04-21-2010
|
3.00
|
Countersinking longerons and structure started
|
|
 |
|
04-18-2010
|
2.50
|
Finished disassembly of skins/substructure
|
|
  |
|
04-04-2010
|
1.00
|
Drilled out (countersunk) skin under center sectio
|
|
  |
|
04-01-2010
|
3.00
|
Uncleco bulkheads, longerons
|
Details
|
  |
|
03-29-2010
|
3.00
|
Continued drilling out caps,upper aft skin, bulkhe
|
Details
|
|
|
03-28-2010
|
2.00
|
Drilled seatback support
|
|
 |
|
03-27-2010
|
6.00
|
Drilled out Upper aft skin, tower webs, rail caps
|
Details
|
|
|
03-26-2010
|
2.00
|
Drilled bottom skin to center section
|
Details
|
  |
|
03-24-2010
|
2.00
|
Drilled out right upper longerons
|
Details
|
  |
|
03-18-2010
|
2.00
|
Drilled out forward right side skin
|
|
 |
|
03-17-2010
|
2.00
|
Drilled out forward left skin
|
|
  |
|
03-16-2010
|
0.50
|
Drilled out left upper longerons
|
Details
|
 |
|
03-15-2010
|
2.00
|
Drilled out Upper Rt. Longerons
|
Details
|
|
|
03-11-2010
|
1.00
|
Drilled out Right lower & auxillary longerons
|
|
 |
|
03-10-2010
|
3.00
|
Drilled out Left lower & auxillary longerons
|
|
  |
|
03-07-2010
|
2.00
|
Upper Longerons
|
Details
|
 |
|
03-06-2010
|
2.00
|
Started skin assembly of mid to tail skins.
|
|
 |
|
03-04-2010
|
3.00
|
Tail skin assembly
|
Details
|
 |
|
03-03-2010
|
2.00
|
Finish deburring and assembly
|
Details
|
|
|
03-01-2010
|
1.00
|
Drilling out landing tail gear
|
Details
|
|
|
02-28-2010
|
3.00
|
Tailcone and bulkheads started
|
Details
|
|
|
02-27-2010
|
3.00
|
Mid-Fuselage arm rests
|
Details
|
|
|
02-26-2010
|
4.00
|
Mid-Fuselage Riveting and Assembly
|
Details
|
|
|
02-25-2010
|
2.00
|
Skin Riveting Seat Rib Sub-Assembly
|
Details
|
|
|
02-20-2010
|
2.00
|
Continued Riveting Seat Rib Sub-Assembly
|
Details
|
|
|
02-16-2010
|
2.00
|
Begin Riveting Seat Rib Sub-Assembly
|
|
 |
|
02-13-2010
|
2.00
|
Prime Painted Seat Rib Sub-Assembly
|
Details
|
|
|
02-06-2010
|
3.00
|
Alumi-Prep/Alodine Seat Rib Sub-assembly
|
|
 |
|
01-19-2010
|
2.00
|
Mid-Fuselage F-823-1 Skins
|
Details
|
|
|
01-14-2010
|
2.50
|
Mid-Fuselage Started
|
Details
|
 |
|
01-01-2010
|
6.00
|
Finished Right and Left Lower/Mid Longerons
|
|
|
|
12-31-2009
|
2.50
|
Drilled Out Right & Left Lower Forward Longerons
|
|
|
|
12-30-2009
|
1.00
|
Finished Bending Lower Longeron Bending
|
Details
|
|
|
12-28-2009
|
1.50
|
Lower Longeron Bending
|
Details
|
|
|
12-27-2009
|
2.50
|
Remove Blue Plastic/Solder Gun/Dimple Countersink
|
|
  |
|
12-26-2009
|
1.00
|
Finished Deburring Seat Rib Assembly
|
|
 |
|
12-17-2009
|
0.50
|
Continued Deburring Seat Rib Assembly
|
|
  |
|
12-14-2009
|
1.00
|
Deburr Seat Rib Assembly
|
|
  |
|
12-09-2009
|
0.50
|
Roll Skin Edges below seat assembly
|
|
|
|
12-08-2009
|
2.00
|
Seat Rib Assembly/floor skin drilled
|
|
  |
|
11-29-2009
|
1.50
|
Seat Rib Assembly Started.
|
Details
|
|
|
11-28-2009
|
4.00
|
Riveted Bottom Firewall/Center Section Work
|
Details
|
|
|
11-25-2009
|
2.00
|
Center Seciton Continues
|
Details
|
|
|
11-24-2009
|
2.00
|
Center Section Continues
|
Details
|
|
|
11-23-2009
|
0.50
|
Center Section work
|
Details
|
|
|
11-22-2009
|
1.00
|
Firewall Machine Dimpled/Proseal Applied
|
Details
|
|
|
11-21-2009
|
1.50
|
Gear Tower Fore and Aft Braces Attached
|
|
|
|
11-20-2009
|
2.00
|
Landing Gear Tower Riveted and Finished
|
|
|
|
11-18-2009
|
1.50
|
Landing Gear Tower Weldments Riveted
|
|
|
|
11-16-2009
|
2.00
|
Landing Gear Weldments Bolted
|
|
 |
|
11-12-2009
|
3.00
|
Finished Riveting Gear Tower Braces/Panels
|
|
 |
|
11-11-2009
|
2.00
|
Started Riveting Gear Tower braces
|
|
  |
|
11-08-2009
|
2.00
|
Finished Riveting Access Door Modification
|
|
|
|
11-07-2009
|
4.00
|
Riveting Access Door Mod. platenuts
|
|
  |
|
11-03-2009
|
2.00
|
Painted Acryglow (Sherm/Williams) on Interior Part
|
Details
|
  |
|
11-01-2009
|
3.00
|
Prime Painted all current prepared parts
|
|
  |
|
10-31-2009
|
3.00
|
Alumi-Prep/Alodine
|
Details
|
  |
|
10-25-2009
|
2.00
|
Center Section Preparation Finished
|
Details
|
|
|
10-24-2009
|
4.00
|
Redo-F849 and continue Center Section work
|
Details
|
 |
|
10-20-2009
|
1.50
|
Center Section work continues
|
Details
|
 |
|
10-19-2009
|
0.25
|
Center Section Work Begins
|
Details
|
 |
|
10-17-2009
|
2.00
|
Forward Fuselage Subfloor
|
Details
|
|
|
10-16-2009
|
2.00
|
Finished Instrument Panel Access Door
|
Details
|
 |
|
10-14-2009
|
0.25
|
Compressor Hose
|
Details
|
 |
|
10-12-2009
|
2.00
|
Continue Instrument Panel Access Door Mod.
|
Details
|
|
|
10-11-2009
|
2.00
|
Continue Instrument Panel Access Door Mod.
|
Details
|
 |
|
10-10-2009
|
2.00
|
Instrument Panel Access Door Mod.
|
Details
|
 |
|
10-04-2009
|
2.00
|
Finished deburring Landing Gear Boxes
|
|
 |
|
10-01-2009
|
1.00
|
Deburring Landing Gear Boxes continues
|
|
  |
|
09-30-2009
|
1.00
|
Deburring edges and drilled holes
|
Details
|
  |
|
09-29-2009
|
2.00
|
Drilled out Landing Gear Towers
|
Details
|
|
|
09-24-2009
|
2.00
|
Prime subfloor and rivet and Finished Firewall riv
|
|
|
|
09-15-2009
|
1.50
|
Continue Riveting Firewall, and Riveted Cool Air
|
|
|
|
09-14-2009
|
1.00
|
Prime Paint Firewall parts, and Cool Air Ramp angl
|
|
|
|
09-04-2009
|
1.50
|
Dimple subfloor/Alodine parts
|
|
 |
|
09-01-2009
|
3.00
|
Final Drilled Fuselage Forward Subfloor & Cooling
|
|
|
|
08-31-2009
|
2.00
|
Finished Firewall Angle work/ Began Forward Floor
|
Details
|
 |
|
08-29-2009
|
1.00
|
Firewall Angle Parts Drill Countersunk
|
|
|
|
08-27-2009
|
3.00
|
Dimple Firewall, and Finished deburring
|
|
|
|
08-25-2009
|
2.00
|
Final Drilled Firewall
|
|
 |
|
08-24-2009
|
3.00
|
Firewall Started
|
Details
|
 |
|
08-20-2009
|
4.00
|
Fuselage Unpacked, and Inventory
|
Details
|
|
|
08-19-2009
|
0.25
|
Fuselage Kit Arrives
|
Details
|
|