Date
|
Hours
|
Work Log Summary

|
Details

|
12-09-2019
|
0.00
|
split cowling install cont'd
|
|
|
|
12-09-2019
|
1.00
|
install new split cowling
|
Details
|
|
|
12-09-2019
|
0.50
|
finish up split cowl install
|
|
|
|
12-08-2019
|
0.50
|
fill pinholes and prime
|
Details
|
|
|
12-04-2019
|
0.00
|
begin lower cowling nose repair 4
|
|
|
|
12-04-2019
|
0.00
|
begin lower cowling nose repair 3
|
|
|
|
12-04-2019
|
0.00
|
begin lower cowling nose repair 2
|
Details
|
|
|
12-04-2019
|
2.00
|
begin lower cowling nose repair 1
|
Details
|
|
|
11-24-2019
|
1.50
|
cowl split mod - split and install receptacles
|
|
|
|
11-24-2019
|
0.00
|
cowl split
|
|
|
|
11-18-2019
|
2.50
|
split bottom cowl mod
|
Details
|
|
|
11-18-2019
|
0.00
|
cowl mod layup
|
Details
|
|
|
09-25-2017
|
0.50
|
partial fix of mount rub
|
Details
|
|
|
10-07-2013
|
1.00
|
add capacitor to try to quiet ALT noise
|
Details
|
|
|
02-10-2013
|
1.00
|
reconnect fuel drain hose...what a bear.
|
Details
|
|
|
02-09-2013
|
4.25
|
ready for ground run tomorrow
|
|
|
|
08-27-2012
|
2.25
|
begin work to modify cowl inlets
|
Details
|
|
|
06-04-2012
|
0.25
|
dampener hose to oil filter
|
Details
|
|
|
05-21-2012
|
0.25
|
trim exhaust pipes to natural body line
|
Details
|
|
|
05-21-2012
|
0.75
|
gascolator
|
|
|
|
04-17-2012
|
1.25
|
install nose fairing and cowling
|
Details
|
|
|
03-25-2012
|
0.00
|
COWLING INSTALL PROCEDURE
|
Details
|
  |
|
03-25-2012
|
2.00
|
cowling back on; check gap; record install procedu
|
Details
|
|
|
02-25-2012
|
0.50
|
note some epoxy "melting"
|
Details
|
|
|
02-25-2012
|
1.00
|
mark lower cowling rub; check engine bolts
|
Details
|
|
|
02-25-2012
|
0.75
|
grind & sand lower cowling for spinner rub
|
|
|
|
01-28-2012
|
1.50
|
finish up Reiff preheater system install
|
Details
|
|
|
11-13-2011
|
1.75
|
trim top cowl; cut flange off
|
Details
|
|
|
11-13-2011
|
2.75
|
fit cowlng, trim seals, mark for cowl adjustment
|
Details
|
|
|
10-17-2011
|
1.25
|
work off Duncan's squawks
|
Details
|
  |
|
08-29-2011
|
0.50
|
run spark plug wires RS
|
|
|
|
08-29-2011
|
0.50
|
LS spark plug wires
|
|
|
|
08-28-2011
|
0.50
|
PLUG VACUUM HOLE COOLING HOLE
|
Details
|
|
|
08-28-2011
|
0.25
|
add silicone spacer to oil filter
|
Details
|
 |
|
08-27-2011
|
0.50
|
installed SS tie straps in place of safety wire
|
Details
|
  |
|
08-27-2011
|
1.50
|
install 72" prop cable and secure
|
|
|
|
08-27-2011
|
0.00
|
add'l prop cable pics
|
|
|
|
08-15-2011
|
1.00
|
prep and epoxy top cowling
|
Details
|
|
|
08-15-2011
|
1.50
|
prep and epoxy inside of lower cowling
|
Details
|
 |
|
08-14-2011
|
3.00
|
install baffle seal
|
Details
|
|
|
08-14-2011
|
1.00
|
FWF...virtually done... a few punch list items
|
Details
|
|
|
08-14-2011
|
1.00
|
FWF continued
|
Details
|
|
|
08-14-2011
|
1.75
|
firewall forward continued
|
Details
|
|
|
08-08-2011
|
3.00
|
prop cable;gascolator, exhaust; drain lines; heate
|
|
|
|
08-08-2011
|
3.00
|
continue on FW connections
|
Details
|
|
|
08-01-2011
|
5.50
|
exhaust work and more wiring, hoses, etc.
|
Details
|
|
|
07-31-2011
|
1.50
|
work on rear hoses,cables, wires and left side
|
|
|
|
07-31-2011
|
0.00
|
ram air....adjust and modify spacer
|
Details
|
|
|
07-31-2011
|
1.50
|
ram air
|
|
|
|
07-31-2011
|
1.50
|
left side wiring
|
|
|
|
07-31-2011
|
1.00
|
finish connecting throttle cable clamp
|
Details
|
|
|
07-30-2011
|
3.25
|
work on wiring, hoses, etc.; moslty right side
|
Details
|
|
|
07-30-2011
|
1.75
|
the fun continues...throttle cable
|
Details
|
  |
|
07-30-2011
|
1.25
|
fool with prop cable
|
Details
|
|
|
07-30-2011
|
0.50
|
connect oil filter hoses; safety wire
|
Details
|
|
|
07-30-2011
|
0.00
|
add'l prop cable pics
|
|
|
|
07-28-2011
|
0.25
|
began work on controls and wiring in engine compar
|
Details
|
  |
|
07-24-2011
|
5.50
|
rehang engine
|
Details
|
|
|
06-13-2011
|
1.00
|
research and figure sniffle valve install; misc sh
|
|
  |
|
02-07-2011
|
0.00
|
underside view of install skybolts
|
|
 |
|
02-07-2011
|
2.25
|
oil drain door - skybolts
|
Details
|
|
|
02-07-2011
|
0.75
|
2nd 4 BID to oil drain door
|
|
 |
|
02-05-2011
|
2.00
|
replan oil drain door
|
Details
|
|
|
02-05-2011
|
0.75
|
cut oil drain door
|
Details
|
|
|
02-04-2011
|
0.75
|
plan out oil drain access door ala Bill H
|
Details
|
|
|
01-30-2011
|
1.75
|
micro vertical hat rack
|
Details
|
 |
|
08-15-2010
|
0.00
|
remote oil hoses
|
Details
|
|
|
08-15-2010
|
0.00
|
re-locate alt air cable- too short the way it was
|
|
|
|
08-15-2010
|
0.00
|
install parking break cable to panel
|
Details
|
|
|
08-15-2010
|
2.00
|
fabricate & install remote oil hoses
|
Details
|
|
|
08-15-2010
|
5.00
|
Alt air, heat and oil cooler cables installed
|
|
|
|
06-14-2010
|
1.25
|
fabricate phenolic pad for voltage regulators
|
Details
|
 |
|
06-13-2010
|
0.50
|
remove 37 pin double connector-room for voltage re
|
|
|
|
04-25-2010
|
1.00
|
study and research firewall fwd.; pressure sensors
|
|
  |
|
09-20-2009
|
2.00
|
make template; figure out oil hose routing - measu
|
Details
|
  |
|
09-07-2009
|
1.00
|
intalled remote oil filter on firewall
|
Details
|
|
|
09-07-2009
|
1.50
|
decore and add phenolic for remote oil filter
|
|
|