KitLog pro

Powered By Kitlog Pro v2.0

N144GP Lancair Super ES
Work Logs Found: 42
Category Work Time: 66 Hours
 Date
Hours
Work Log Summary

Details

 07-13-2015
2.00
FW pass thru grommet for UL ECU harness
Details
       

 06-15-2015
1.50
re-do fuel hose FW bulkhead to gascolator; +3"
       

 06-08-2015
1.00
move supply bulkhead fitting #2
       

 05-12-2015
1.50
fuel system continued - bulkhead fittings
       

 05-12-2015
1.00
fuel lines cont'd - wing sump drains
Details
       

 05-12-2015
3.50
fab SS fuel hoses
Details
       

 05-12-2015
1.50
begin running final fuel lines
Details
       

 05-04-2015
4.00
plan, engineer fuel system; res parts and place AC
Details
       

 03-30-2015
1.75
inside view after mounting engine
       

 03-30-2015
2.00
hang engine-torque mount AN4 bolts to 120 #/in.
       

 03-30-2015
2.00
hang engine
       

 03-30-2015
4.75
finalize FW and attach to fuselage
       

 07-14-2014
2.50
Cowl off, remove eninge & FW; tape I/S misc.
Details
       

 04-14-2014
0.25
test fit R bafffles beofre getting too far ahead o
       

 04-14-2014
0.25
pull off hose from fuel pump to add firesleeve & c
     

 04-14-2014
1.50
move air/oil sep. and R coil
Details
       

 04-14-2014
1.25
drill rest of firewall holes - from insode & outsi
Details
       

 04-13-2014
1.00
install both coils on engine mount with adels
       

 04-13-2014
1.00
firesleeve fuel lines
       

 04-13-2014
1.25
fab bracket, standoffs, install air/oil seporator
     

 04-06-2014
1.00
install adels for loom and fuel hose
Details
       

 04-06-2014
1.00
fuel relay spec and rough install
       

 04-06-2014
1.00
fab and install mounting plates for coils
Details
       

 03-31-2014
0.00
install air box
Details
       

 03-31-2014
1.50
batt box; hole for loom; mount ECU inside FW
Details
       

 03-30-2014
1.50
mount fuel pump, filters; fabbed hoses
       

 03-30-2014
2.50
figure out & fabbed battery box
Details
       

 03-30-2014
2.00
ECU loom hole through FW
Details
       

 03-30-2014
1.00
drill 1/4" mounting holes for 2 coils
       

 03-30-2014
0.00
coil and ECU parts
       

 03-24-2014
1.50
begin placing FWF equipment
       

 12-24-2013
2.00
4 BID layup for cowl extension - top
Details
       

 12-22-2013
2.00
trial & error fitting and cutting of cowling
Details
       

 12-22-2013
2.00
continuing fitting cowl
Details
       

 12-08-2013
1.50
temp. install firewall and engine mount
Details
       

 12-08-2013
3.75
final fit and bolt mount on (temp for cowl fitting
Details
       

 11-25-2013
0.75
begin FW layout plan
Details
       

 11-24-2013
2.50
map out & begin work on fuel system
       

 11-24-2013
0.00
fuel selector cont'd
Details
       

 11-24-2013
0.00
assemble fuel pumps/filters/etc
Details
       

 08-05-2013
1.25
clean up SS firewall; fit and cleco to fusleage -
Details
     

 01-27-2013
2.00
install mid elev bell crank
       










Copyright © 2001-2024 Matronics. All Rights Reserved.