KitLog pro

Powered By Kitlog Pro v2.0

Patrick Kelley (Flion)
Work Logs Found: 97
Category Work Time: 294 Hours
 Date
Hours
Work Log Summary

Details

 08-12-2015
2.00
Close rear of HS and VS fairings
Details
       

 08-11-2015
4.70
Finish fairing
Details
       

 08-10-2015
5.30
More fairing work
Details
       

 08-09-2015
2.00
More fiberglass work
Details
       

 08-09-2015
1.20
Bond trim tab ribs
Details
       

 08-08-2015
4.00
Fit empennage fairing
Details
       

 08-05-2015
4.00
More empennage fairing work
Details
       

 08-05-2015
0.50
Created capture for rudder trim hinge
Details
       

 08-04-2015
4.00
Empennage fairing work
Details
       

 12-24-2013
0.30
Test fit rudder to fuselage
Details
       

 12-23-2013
0.50
Install tail strobe
Details
       

 12-22-2013
1.00
Finish installing rudder bottom fairing
Details

 12-11-2013
1.00
Rivet rudder leading edge
Details
       

 12-06-2013
2.00
Rudder lower fairing
Details
       

 12-02-2013
2.00
Install counterbalance weight
Details
       

 11-30-2013
1.00
Roll rudder leading edge
Details
       

 11-27-2013
2.00
Rivet front spar, fit bottom fairing
Details
       

 11-09-2013
1.00
Rivet the rudder trailing edge
Details
       

 11-04-2013
1.50
Glue in rudder TE
Details
       

 10-31-2013
2.00
Rivet rudder halves together
Details
       

 10-29-2013
1.00
Install studs, trim servo, ribs
Details
       

 10-26-2013
3.30
Back rivet rudder stiffeners, etc.
Details
       

 10-21-2013
2.20
Trim Tab Hinge, countersinking
Details
       

 10-20-2013
1.50
Dimple the rudder skin
Details

 10-19-2013
2.00
Fabricated trim access panel
Details
       

 10-10-2013
0.50
Initial riveting of structure
Details
       

 10-08-2013
3.00
Dimple skins and skeleton
Details

 10-02-2013
1.50
Match-drill rudder skins
Details
       

 09-18-2013
2.00
Cleco the rudder skins in place
Details
       

 09-13-2013
2.00
Assemble rudder skeleton
Details
       

 09-10-2013
2.00
Final prep of rudder skeleton parts
Details

 09-09-2013
4.00
Prepare parts for rudder skeleton
Details
       

 11-01-2011
5.00
Empennage attach, elev. trim adjust
Details
       

 10-12-2011
4.00
More rudder trim fabrication
Details
       

 10-01-2011
6.00
Fabricating rudder trim tab, part 1
Details
       

 09-20-2011
2.00
Remove empennage surfaces
Details
       

 09-07-2011
5.00
Empennage, controls attach
Details
       

 09-05-2011
1.00
Attach HS to tailcone
Details
       

 08-18-2011
5.00
Assembled Elevator Trim mount
Details
       

 08-09-2011
4.00
Install elevators on HS
Details
       

 05-28-2010
6.00
Attach trim tabs to elevators
Details
       

 05-24-2010
3.50
Finish riveting right elevator
Details
       

 05-23-2010
3.00
Elevator counter-weight and trim tabs
Details
       

 05-22-2010
7.00
Fabricate and pre-assemble elevator trim tabs
Details
       

 05-18-2010
3.00
Prosealed second elevator, A/C fab
Details
       

 05-14-2010
2.00
Empennage trailing and leading edge
Details
       

 01-01-2010
2.00
More right elevator riveting
Details
       

 12-31-2009
4.00
Riveting the top skin and the skins together
Details
       

 12-29-2009
2.50
Dimpled, riveted right bottom elevator skin
Details
       

 12-23-2009
2.00
Prosealed TE ribs and wedge
Details
       

 12-22-2009
5.00
Continue left elevator riveting
Details
       

 12-21-2009
4.50
Continue riveting left elevator
Details
       

 12-19-2009
1.00
Began riveting left elevator
Details
       

 12-14-2009
3.00
Begin riveting right elevator
Details
       

 12-12-2009
1.50
Tailcone miscellaney and dimpling the right elevat
Details
       

 11-11-2009
4.00
Assembly of bulkheads, stringers.
Details
       

 11-07-2009
3.00
More Elevator riveting prep
Details
       

 11-06-2009
1.80
Deburr and dimple elevator parts
Details
     

 11-05-2009
0.80
Disassembly for debur and dimpling prep
Details
     

 11-02-2009
3.30
Final assembly, match drilling elevator
Details
       

 10-28-2009
3.50
Finish assembly, begin match-drilling skins
Details
       

 10-27-2009
3.20
More elevator assembly
Details
       

 10-26-2009
3.00
Elevator assembly
Details
       

 10-24-2009
3.50
Finished riveting the HS (again!)
Details
       

 10-22-2009
4.00
More riveting
Details

 10-21-2009
3.50
Riveting skeleton into HS skins
Details
       

 10-17-2009
5.00
finished disassembly, prepped the new skins
Details
       

 10-16-2009
3.20
Drilling the skins off the skeleton, continued
Details
       

 10-14-2009
4.00
Drilling off the HS skins
Details
       

 10-10-2009
5.00
Finished HS, began making up elevator ribs
Details
       

 10-09-2009
2.50
Installed rear spar and riveted ribs
Details
       

 10-08-2009
4.00
Riveted skins to HS skeleton
Details
       

 10-07-2009
4.10
Positioned skeleton in skins, riveted front HS spa
Details
       

 10-06-2009
5.30
finished dimpling and riveting HS skeleton
Details
       

 10-03-2009
2.50
Finished dimpling skins, installed nose ribs
Details
       

 09-26-2009
4.00
Finished match drilling, began dimpling
Details
       

 09-25-2009
3.00
Match drilling HS
Details
     

 09-19-2009
2.00
Clecoed skin to HS skeleton
Details
       

 09-17-2009
7.00
Assemble HS skeleton and begin skinning
Details
       

 09-16-2009
3.00
Rebuilt HS forward spar
Details
       

 09-08-2009
3.00
Assembling HS front spar
Details
       

 09-05-2009
1.00
Deburred spar cap strips
Details
     

 09-02-2009
6.00
Riveted rudder TE, rolled LE, installed counterwei
Details
       

 09-01-2009
2.00
Riveted rudder spar
Details
       

 08-31-2009
0.20
Phil Cobbin milled stringers
Details
     

 08-28-2009
4.20
Riveted rudder skins, prosealed trailing edge
Details
       

 08-27-2009
3.50
Rivet rear spar and hinge brackets, fab forward br
Details
       

 08-26-2009
3.00
Assemble VS rear spar
Details
       

 08-21-2009
3.00
Dimple skins, prime, begin skeleton riveting
Details
       

 08-20-2009
3.00
Final drill skins, diaassemble, debur, and dimple
Details
       

 08-19-2009
6.00
Assemble rudder skeleton and skins
Details
       

 08-17-2009
5.00
Riveted VS skin
Details
       

 08-16-2009
7.00
Riveting prep and VS skeleton riveting
Details
       

 03-21-2009
3.00
Cleco and drill VS skin to skeleton
Details
       

 03-18-2009
4.00
Assemble VS skeleton
Details
       

 03-17-2009
2.00
Assembled rear spar caps to HS rear spar
Details
       

 03-14-2009
1.00
Trimmed rear VS spar caps
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.