KitLog pro

Powered By Kitlog Pro v2.0

Patrick Kelley (Flion)
Work Logs Found: 48
Category Work Time: 193 Hours
 Date
Hours
Work Log Summary

Details

 12-26-2011
4.00
Close up the left tank
Details
       

 12-25-2011
2.00
Left tank vent line, level sender, end rib
Details
       

 12-24-2011
7.00
Riveting left tank
Details
       

 12-23-2011
2.00
Prosealed interior ribs in left tank
Details
       

 12-23-2011
2.50
Prosealed and riveted stiffeners
Details
       

 12-22-2011
5.00
Prepare Left Wing Tank for Proseal
Details
     

 12-19-2011
3.00
Partially reassembled left tank
Details

 08-06-2011
4.50
Riveted right top wing skins
Details
       

 07-22-2011
3.00
More riveting, pulling right wing wiring
Details
       

 07-21-2011
2.00
Started riveting the top wing skins
Details
       

 07-21-2011
5.00
Rivet right leading edge
Details
       

 07-18-2011
4.20
Prepare right leading edge for riveting
Details
       

 07-16-2011
5.00
Match drill right leading edge, AOA prep
Details
       

 07-15-2011
3.00
Assemble right leading edge
Details
       

 07-14-2011
8.00
Prepare right top wing skins for riveting
Details
       

 07-13-2011
4.00
Match drill top right wing skins
Details
       

 07-11-2011
5.00
rivet rear spar, cleco top skins on right wing
Details
       

 07-10-2011
4.50
Bolt ribs, roll servo, and fab right rear spar
Details
       

 07-09-2011
8.30
Rivet ribs together and to rigth wing spar
Details
       

 06-18-2011
5.30
Prepare Fuel Tank for riveting
Details
       

 06-15-2011
5.20
Finish riveting, more fuel tank assembly
Details
       

 06-14-2011
2.50
Yet more riveting
Details
       

 06-14-2011
5.00
Assemble and match drill the left fuel tank
Details
       

 06-13-2011
3.60
More riveting the left top wing skin
Details
       

 06-12-2011
6.50
Riveting of left outboard LE, start fuel tank
Details
       

 06-08-2011
3.00
riveting the left top wing skin
Details
       

 06-08-2011
5.50
riveted leading edge assembly
Details
       

 06-07-2011
7.20
Prepared left outboard leading edge for riveting
Details
       

 06-04-2011
5.80
Prepare and cleco left leading edge together
Details
       

 06-01-2011
4.80
Dimpling left wing skins for riveting
Details
       

 05-31-2011
3.20
Prepare left top wing skins for riveting
Details
       

 05-29-2011
2.00
Dimple and countersink wing walk area
Details
       

 05-28-2011
4.00
Match drilled left top wing skins
Details
       

 05-24-2011
3.50
Riveted rear spar together and to ribs
Details
       

 05-24-2011
0.50
Clecoed Left Top Wing Skins to structure
Details
       

 05-23-2011
5.00
Assemble left rear spar
Details
       

 05-21-2011
1.50
Pressi in aileron hinge bearings, rivet assemblies
Details
       

 05-20-2011
3.00
Bolt ribs to left spar; fabricate aileron hinge br
Details
       

 05-19-2011
7.00
Rivet ribs together and to left spar
Details
       

 05-17-2011
3.00
Finisihed left wing spar
Details
       

 05-17-2011
2.50
Fabricate wing ribs and begin left wing assembly
Details
       

 05-16-2011
3.00
Countersink the spar rivet holes and rivet nutplat
Details
       

 05-11-2011
3.50
Drilled left wing stiffeners using spar as guide
Details
     

 03-13-2011
6.00
Added nutplats and tiedown to right wing
Details
       

 03-12-2011
2.50
Countersinking right wing spar
Details
       

 03-09-2011
3.50
Drill right wing box stringers
Details
       

 03-08-2011
2.00
Riveted the spar extensions
Details
       

 02-28-2011
1.20
Drill and prepare wing spar extensions
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.