|
|
|
|
Patrick Kelley (Flion)
Work
Logs
Found:
31
|
Category Work Time: 128 Hours
|
Date
|
Hours
|
Work Log Summary
|
Details
|
10-24-2008
|
1.00
|
Adjust tachometer, set idle speed
|
Details
|
|
|
10-21-2008
|
2.00
|
Runup to fine tune and check RPM reading
|
Details
|
|
|
10-19-2008
|
2.00
|
fixed oil leak, other troubleshooting
|
Details
|
|
|
10-18-2008
|
1.00
|
First engine start
|
Details
|
|
|
10-17-2008
|
5.00
|
Center baffle seal, prepare for engine start
|
Details
|
|
|
10-12-2008
|
4.00
|
baffle seal, weight and balance
|
Details
|
|
|
10-10-2008
|
2.00
|
Baffle seal
|
Details
|
|
|
10-08-2008
|
3.00
|
Baffle seal
|
Details
|
|
|
08-22-2008
|
6.00
|
Baffle construction, safety prop
|
Details
|
|
|
08-21-2008
|
6.00
|
Trim baffling, cowl fit adjustment
|
Details
|
|
|
08-20-2008
|
6.00
|
forward baffle construction
|
Details
|
|
|
08-19-2008
|
4.00
|
Breather and fuel vent lines, saftey alternator
|
Details
|
|
|
08-18-2008
|
6.00
|
Connect engine sensors, fiberglass work
|
Details
|
|
|
08-17-2008
|
5.00
|
More FWF cleanup, FAB construction
|
Details
|
|
|
08-16-2008
|
4.00
|
FWF routings, FAB/cowl scoop connection
|
Details
|
|
|
08-15-2008
|
5.00
|
FAB construction, cowling fabrication
|
Details
|
|
|
08-14-2008
|
3.00
|
FAB construction
|
Details
|
|
|
07-29-2008
|
10.00
|
Ignition work, spinner, prop install, miscellaneou
|
Details
|
|
|
07-11-2008
|
6.00
|
Removed broken bolt, completed spark wires
|
Details
|
|
|
07-10-2008
|
4.00
|
Spark plug wiring, re-route left CHT sensors
|
Details
|
|
|
06-26-2008
|
6.00
|
Manifold pressure plumbing, wiring tidy, prep for
|
Details
|
|
|
06-24-2008
|
6.00
|
Fabbed center column, cabin heat controls.
|
Details
|
|
|
06-16-2008
|
3.00
|
Cabin heat box and breather seperator install
|
Details
|
|
|
06-12-2008
|
6.00
|
Fuel pump plumbing
|
Details
|
|
|
05-30-2008
|
3.00
|
Installed oil cooler, fuel lines
|
Details
|
|
|
05-26-2008
|
3.00
|
Fuel Pump plumbing and first battery box
|
Details
|
|
|
05-23-2008
|
3.00
|
Engine baffling and throttle/mixture cable bracket
|
Details
|
|
|
05-22-2008
|
5.00
|
Fuel pump installation and cable bracket fabricati
|
Details
|
|
|
05-20-2008
|
2.00
|
baffling construction
|
Details
|
|
|
05-07-2008
|
3.50
|
baffling construction
|
Details
|
|
|
05-04-2008
|
2.00
|
baffling construction
|
Details
|
|
|
|
|
|
|
|
|
Copyright © 2001-2024 Matronics. All Rights Reserved. |