KitLog pro

Powered By Kitlog Pro v2.0

Patrick Kelley (Flion)
Work Logs Found: 31
Category Work Time: 128 Hours
 Date
Hours
Work Log Summary

Details

 10-24-2008
1.00
Adjust tachometer, set idle speed
Details
     

 10-21-2008
2.00
Runup to fine tune and check RPM reading
Details

 10-19-2008
2.00
fixed oil leak, other troubleshooting
Details

 10-18-2008
1.00
First engine start
Details

 10-17-2008
5.00
Center baffle seal, prepare for engine start
Details

 10-12-2008
4.00
baffle seal, weight and balance
Details

 10-10-2008
2.00
Baffle seal
Details

 10-08-2008
3.00
Baffle seal
Details
       

 08-22-2008
6.00
Baffle construction, safety prop
Details
       

 08-21-2008
6.00
Trim baffling, cowl fit adjustment
Details
       

 08-20-2008
6.00
forward baffle construction
Details
       

 08-19-2008
4.00
Breather and fuel vent lines, saftey alternator
Details
       

 08-18-2008
6.00
Connect engine sensors, fiberglass work
Details
       

 08-17-2008
5.00
More FWF cleanup, FAB construction
Details
       

 08-16-2008
4.00
FWF routings, FAB/cowl scoop connection
Details
       

 08-15-2008
5.00
FAB construction, cowling fabrication
Details
       

 08-14-2008
3.00
FAB construction
Details
       

 07-29-2008
10.00
Ignition work, spinner, prop install, miscellaneou
Details
       

 07-11-2008
6.00
Removed broken bolt, completed spark wires
Details
       

 07-10-2008
4.00
Spark plug wiring, re-route left CHT sensors
Details
       

 06-26-2008
6.00
Manifold pressure plumbing, wiring tidy, prep for
Details
       

 06-24-2008
6.00
Fabbed center column, cabin heat controls.
Details
       

 06-16-2008
3.00
Cabin heat box and breather seperator install
Details
       

 06-12-2008
6.00
Fuel pump plumbing
Details
       

 05-30-2008
3.00
Installed oil cooler, fuel lines
Details

 05-26-2008
3.00
Fuel Pump plumbing and first battery box
Details
       

 05-23-2008
3.00
Engine baffling and throttle/mixture cable bracket
Details
       

 05-22-2008
5.00
Fuel pump installation and cable bracket fabricati
Details
       

 05-20-2008
2.00
baffling construction
Details

 05-07-2008
3.50
baffling construction
Details
       

 05-04-2008
2.00
baffling construction
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.