Date
|
Hours
|
Work Log Summary
|
Details
|
10-14-2017
|
4.00
|
Fabricate VP-X power cables, panel start
|
Details
|
|
|
09-18-2017
|
1.00
|
Replaced fuel line, pinned copilot cable
|
Details
|
|
|
09-16-2017
|
2.00
|
Misc panel and an oops!
|
Details
|
|
|
09-12-2017
|
4.00
|
Connect panel grounds and firewall plug 1
|
Details
|
|
|
09-09-2017
|
2.00
|
Installed panel in airframe
|
Details
|
|
|
09-07-2017
|
2.00
|
Built mount and installed VP-X #2
|
Details
|
|
|
09-01-2017
|
5.00
|
Built new mount for VP-X #1
|
Details
|
|
|
09-19-2015
|
3.50
|
Remove panel from airframe
|
Details
|
|
|
07-29-2015
|
3.00
|
LSE to firewall and some fiberglass
|
Details
|
|
|
07-25-2015
|
2.60
|
Finish wiring the overhead console
|
Details
|
|
|
07-24-2015
|
2.00
|
Overhead wiring
|
Details
|
|
|
07-18-2015
|
1.20
|
Overhead lighting
|
Details
|
|
|
07-09-2015
|
3.00
|
Wire overhead lighting
|
Details
|
|
|
07-08-2015
|
4.00
|
Install overhead access covers
|
Details
|
|
|
07-07-2015
|
3.00
|
Plumb overhead oxygen lines
|
Details
|
|
|
07-01-2015
|
3.50
|
Install components into overhead
|
Details
|
|
|
06-30-2015
|
3.00
|
Routed A/C hoses
|
Details
|
|
|
06-29-2015
|
3.00
|
Fabricate hoses from A/C to compressor
|
Details
|
|
|
06-23-2015
|
1.00
|
Remove VP DU, finish firewall plug 2
|
Details
|
|
|
07-13-2014
|
4.00
|
Miscellaneous, Oxy system
|
Details
|
|
|
07-12-2014
|
5.00
|
Install pitch servo, battery, Oxy bottle
|
Details
|
|
|
07-09-2014
|
6.00
|
A/C plumbing
|
Details
|
|
|
07-05-2014
|
6.00
|
Route wiring through tail cone
|
Details
|
|
|
06-05-2014
|
6.00
|
Cut rudder trim, add control linkage.
|
Details
|
|
|
06-03-2014
|
5.00
|
Overhead console O2, speaker install
|
Details
|
|
|
11-20-2013
|
3.00
|
Wire leads for trim tab servo
|
Details
|
|
|
08-23-2013
|
2.00
|
Attempt to attach a speaker
|
Details
|
|
|
08-21-2013
|
1.00
|
GPS test
|
Details
|
|
|
08-14-2013
|
3.00
|
Firewall Plug #1 and overhead
|
Details
|
|
|
08-10-2013
|
2.00
|
Firewall coax pass through
|
Details
|
|
|
08-10-2013
|
4.00
|
Build LSE CU mounts
|
Details
|
|
|
08-09-2013
|
5.00
|
Firewall Plug FP-2
|
Details
|
|
|
08-02-2013
|
3.00
|
Overhead Console planning
|
Details
|
|
|
07-30-2013
|
8.50
|
Connected headest jacks
|
Details
|
|
|
07-21-2013
|
2.00
|
Center console stuff
|
Details
|
|
|
06-30-2013
|
2.00
|
Finalize the power circuit
|
Details
|
|
|
06-26-2013
|
5.00
|
Make up control sticks
|
Details
|
|
|
06-22-2013
|
4.00
|
Finished power circuits
|
Details
|
|
|
06-17-2013
|
7.00
|
Antenna cabling
|
Details
|
|
|
06-15-2013
|
6.00
|
More contactor wiring
|
Details
|
|
|
06-13-2013
|
6.00
|
Misc. Panel Stuff
|
Details
|
|
|
06-12-2013
|
4.00
|
Prepare for panel installation
|
Details
|
|
|
06-12-2013
|
0.50
|
Install panel
|
Details
|
|
|
06-11-2013
|
4.50
|
Began wiring power circuit
|
Details
|
|
|
09-18-2012
|
2.00
|
Test fit subpanel components
|
Details
|
|
|
09-15-2012
|
1.00
|
Set up panel for subpanel assembly
|
Details
|
|
|
09-14-2012
|
2.00
|
Recieved Panel from Aerotronics
|
Details
|
|
|
05-31-2012
|
3.00
|
Miscellaneous, including O2 fill
|
Details
|
|
|
01-31-2012
|
1.20
|
Finalize left LSE module rack
|
Details
|
|
|
01-16-2012
|
1.00
|
Continuing LSE mount fabrication
|
Details
|
|
|
01-13-2012
|
2.00
|
Fab mounts for LSE boxes
|
Details
|
|
|
01-11-2012
|
3.00
|
Build VP-200 mounts
|
Details
|
|
|
11-26-2011
|
2.00
|
Started installing A/C hoses
|
Details
|
|
|
11-26-2011
|
2.00
|
Install AHRS mount
|
Details
|
|
|
11-23-2011
|
5.00
|
Fab AHRS mount, run NAV coduit
|
Details
|
|
|
09-28-2011
|
2.00
|
Install rudder trim servo
|
Details
|
|
|
09-24-2011
|
3.50
|
Cut out rudder for trim and servo
|
Details
|
|
|
09-23-2011
|
3.00
|
Finished VOR antenna, laid out rudder trim
|
Details
|
|
|
09-21-2011
|
3.00
|
Prepare mount for VOR antenna
|
Details
|
|
|
09-03-2011
|
2.00
|
Static System Plumbing
|
Details
|
|
|
09-03-2011
|
2.00
|
Fabricated doubler for ELT antenna
|
Details
|
|
|
08-24-2011
|
2.00
|
Added systems mountings to tailcone
|
Details
|
|
|
08-11-2011
|
2.00
|
Installed Marker Beacon antenna
|
Details
|
|
|
07-23-2011
|
4.00
|
Prepare tail cone for riveting
|
Details
|
|
|
07-21-2011
|
2.00
|
Install AOA tubing in right wing
|
Details
|
|
|
07-18-2011
|
1.00
|
Install AOA ports in right leading edge
|
Details
|
|
|
07-08-2011
|
5.80
|
More planning and running the condiut
|
Details
|
|
|
07-07-2011
|
4.00
|
Match-drill engine mount, avionics routing
|
Details
|
|
|
06-13-2011
|
4.50
|
Installed Pitot mount and plumbing
|
Details
|
|
|
06-03-2011
|
3.00
|
Install left wing wiring harness
|
Details
|
|
|
05-29-2011
|
1.00
|
Built the aileron trim mount
|
Details
|
|
|
05-29-2011
|
2.00
|
Assembled pitot heat control mount.
|
Details
|
|
|
05-28-2011
|
3.00
|
Miscellaneous avionics tasks (mostly left wing)
|
Details
|
|
|
05-26-2011
|
2.00
|
ELT Mounting
|
Details
|
|
|
05-25-2011
|
2.00
|
Fabricated Transpoder Antenna mount
|
Details
|
|
|
05-10-2011
|
2.30
|
Installed nutplates on COMM antenna doublers
|
Details
|
|
|
02-18-2011
|
3.00
|
Fabricated COMM antenna doublers
|
Details
|
|