KitLog pro

Powered By Kitlog Pro v2.0

Patrick Kelley (Flion)
Work Logs Found: 77
Category Work Time: 241 Hours
 Date
Hours
Work Log Summary

Details

 10-14-2017
4.00
Fabricate VP-X power cables, panel start
Details
       

 09-18-2017
1.00
Replaced fuel line, pinned copilot cable
Details
       

 09-16-2017
2.00
Misc panel and an oops!
Details
     

 09-12-2017
4.00
Connect panel grounds and firewall plug 1
Details
       

 09-09-2017
2.00
Installed panel in airframe
Details
       

 09-07-2017
2.00
Built mount and installed VP-X #2
Details

 09-01-2017
5.00
Built new mount for VP-X #1
Details
       

 09-19-2015
3.50
Remove panel from airframe
Details
       

 07-29-2015
3.00
LSE to firewall and some fiberglass
Details
       

 07-25-2015
2.60
Finish wiring the overhead console
Details
       

 07-24-2015
2.00
Overhead wiring
Details
       

 07-18-2015
1.20
Overhead lighting
Details
       

 07-09-2015
3.00
Wire overhead lighting
Details
       

 07-08-2015
4.00
Install overhead access covers
Details
       

 07-07-2015
3.00
Plumb overhead oxygen lines
Details
       

 07-01-2015
3.50
Install components into overhead
Details
       

 06-30-2015
3.00
Routed A/C hoses
Details
       

 06-29-2015
3.00
Fabricate hoses from A/C to compressor
Details
     

 06-23-2015
1.00
Remove VP DU, finish firewall plug 2
Details
       

 07-13-2014
4.00
Miscellaneous, Oxy system
Details
       

 07-12-2014
5.00
Install pitch servo, battery, Oxy bottle
Details
       

 07-09-2014
6.00
A/C plumbing
Details
       

 07-05-2014
6.00
Route wiring through tail cone
Details
       

 06-05-2014
6.00
Cut rudder trim, add control linkage.
Details
       

 06-03-2014
5.00
Overhead console O2, speaker install
Details
       

 11-20-2013
3.00
Wire leads for trim tab servo
Details
       

 08-23-2013
2.00
Attempt to attach a speaker
Details
       

 08-21-2013
1.00
GPS test
Details
       

 08-14-2013
3.00
Firewall Plug #1 and overhead
Details
       

 08-10-2013
2.00
Firewall coax pass through
Details
       

 08-10-2013
4.00
Build LSE CU mounts
Details
       

 08-09-2013
5.00
Firewall Plug FP-2
Details
       

 08-02-2013
3.00
Overhead Console planning
Details
       

 07-30-2013
8.50
Connected headest jacks
Details
       

 07-21-2013
2.00
Center console stuff
Details
       

 06-30-2013
2.00
Finalize the power circuit
Details
       

 06-26-2013
5.00
Make up control sticks
Details
       

 06-22-2013
4.00
Finished power circuits
Details
       

 06-17-2013
7.00
Antenna cabling
Details
       

 06-15-2013
6.00
More contactor wiring
Details
       

 06-13-2013
6.00
Misc. Panel Stuff
Details
       

 06-12-2013
4.00
Prepare for panel installation
Details
       

 06-12-2013
0.50
Install panel
Details
       

 06-11-2013
4.50
Began wiring power circuit
Details
       

 09-18-2012
2.00
Test fit subpanel components
Details
       

 09-15-2012
1.00
Set up panel for subpanel assembly
Details
       

 09-14-2012
2.00
Recieved Panel from Aerotronics
Details
       

 05-31-2012
3.00
Miscellaneous, including O2 fill
Details
       

 01-31-2012
1.20
Finalize left LSE module rack
Details
       

 01-16-2012
1.00
Continuing LSE mount fabrication
Details
       

 01-13-2012
2.00
Fab mounts for LSE boxes
Details
       

 01-11-2012
3.00
Build VP-200 mounts
Details
       

 11-26-2011
2.00
Started installing A/C hoses
Details
       

 11-26-2011
2.00
Install AHRS mount
Details
       

 11-23-2011
5.00
Fab AHRS mount, run NAV coduit
Details
       

 09-28-2011
2.00
Install rudder trim servo
Details
       

 09-24-2011
3.50
Cut out rudder for trim and servo
Details
       

 09-23-2011
3.00
Finished VOR antenna, laid out rudder trim
Details
       

 09-21-2011
3.00
Prepare mount for VOR antenna
Details
       

 09-03-2011
2.00
Static System Plumbing
Details
       

 09-03-2011
2.00
Fabricated doubler for ELT antenna
Details
       

 08-24-2011
2.00
Added systems mountings to tailcone
Details
       

 08-11-2011
2.00
Installed Marker Beacon antenna
Details
       

 07-23-2011
4.00
Prepare tail cone for riveting
Details
       

 07-21-2011
2.00
Install AOA tubing in right wing
Details
       

 07-18-2011
1.00
Install AOA ports in right leading edge
Details
       

 07-08-2011
5.80
More planning and running the condiut
Details
       

 07-07-2011
4.00
Match-drill engine mount, avionics routing
Details
     

 06-13-2011
4.50
Installed Pitot mount and plumbing
Details
       

 06-03-2011
3.00
Install left wing wiring harness
Details
       

 05-29-2011
1.00
Built the aileron trim mount
Details
       

 05-29-2011
2.00
Assembled pitot heat control mount.
Details
       

 05-28-2011
3.00
Miscellaneous avionics tasks (mostly left wing)
Details
       

 05-26-2011
2.00
ELT Mounting
Details
       

 05-25-2011
2.00
Fabricated Transpoder Antenna mount
Details
       

 05-10-2011
2.30
Installed nutplates on COMM antenna doublers
Details
       

 02-18-2011
3.00
Fabricated COMM antenna doublers
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.