KitLog pro

Powered By Kitlog Pro v2.0

Patrick Kelley (Flion)
Work Logs Found: 20
Category Work Time: 128 Hours
 Date
Hours
Work Log Summary

Details

 07-24-2017
45.00
Troubleshoot/repair left ignition
Details

 09-26-2009
0.50
Replaced backup altimeter, switch lamp
Details
     

 08-12-2008
6.00
Prop spinner fabrication, IFR pitot/static check
Details
       

 07-21-2008
5.00
Fuel sender calibration
Details

 07-13-2008
4.00
Fuel Pump cover, pitot static check
Details
     

 07-12-2008
6.00
relocated gps antenna to wing, oil filler door
Details
       

 06-30-2008
6.00
Finished main power connections and engine pod cab
Details
       

 06-29-2008
6.00
Fabricated P1 installation
Details
       

 06-28-2008
4.00
Cleaned up wiring runs behind panel
Details
     

 06-27-2008
5.00
Wiring of Lightspeed ignition boxes
Details
       

 06-23-2008
4.00
NAV troubleshooting, fuel sender wiring
Details

 06-21-2008
4.00
CHT sensors installed
Details
       

 06-20-2008
3.00
More NAV troubleshooting
Details

 06-18-2008
2.00
Pitot hookup
Details

 06-17-2008
6.00
Wiring from wing spar forward/manifold pressure ta
Details
       

 06-11-2008
3.00
Ignition and solenoid wiring
Details
       

 06-10-2008
3.00
Firewall penetrations for ignition and fuel
Details
       

 06-06-2008
5.00
Routing of Lightspeed ignition wiring
Details
       

 06-04-2008
7.00
Fabricated main battery cables
Details
       

 04-28-2008
3.00
ELT Battery and wiring
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.