Powered By Kitlog Pro v2.0
Patrick Kelley (Flion)
RV-6A
Avionics
Work Logs Found:
20
Category Work Time:
128 Hours
Date
Hours
Work Log Summary
Details
07-24-2017
45.00
Troubleshoot/repair left ignition
Details
09-26-2009
0.50
Replaced backup altimeter, switch lamp
Details
08-12-2008
6.00
Prop spinner fabrication, IFR pitot/static check
Details
07-21-2008
5.00
Fuel sender calibration
Details
07-13-2008
4.00
Fuel Pump cover, pitot static check
Details
07-12-2008
6.00
relocated gps antenna to wing, oil filler door
Details
06-30-2008
6.00
Finished main power connections and engine pod cab
Details
06-29-2008
6.00
Fabricated P1 installation
Details
06-28-2008
4.00
Cleaned up wiring runs behind panel
Details
06-27-2008
5.00
Wiring of Lightspeed ignition boxes
Details
06-23-2008
4.00
NAV troubleshooting, fuel sender wiring
Details
06-21-2008
4.00
CHT sensors installed
Details
06-20-2008
3.00
More NAV troubleshooting
Details
06-18-2008
2.00
Pitot hookup
Details
06-17-2008
6.00
Wiring from wing spar forward/manifold pressure ta
Details
06-11-2008
3.00
Ignition and solenoid wiring
Details
06-10-2008
3.00
Firewall penetrations for ignition and fuel
Details
06-06-2008
5.00
Routing of Lightspeed ignition wiring
Details
06-04-2008
7.00
Fabricated main battery cables
Details
04-28-2008
3.00
ELT Battery and wiring
Details
SITE NAVIGATION
Contact Builder
RV-10 Home
RV-6A Home
Category
# Logs
# Hours
All
105
1595
Avionics
20
368
Engine
31
142
Fuselage
35
776
Miscellaneous
15
96
None
1
8
Wings
3
205
Copyright © 2001-2024 Matronics. All Rights Reserved.