Powered By Kitlog Pro v2.0
My RV-10
RV-7A
Elevators
Work Logs Found:
21
Category Work Time:
42 Hours
Date
Hours
Work Log Summary
Details
09-18-2009
1.00
Electric Trim
Details
09-16-2009
1.50
Trim Tab Clearance
Details
09-15-2009
1.50
Fitted Left Elevator
Details
09-14-2009
1.50
Fitted Right Elevator
Details
09-12-2009
1.00
Leading Edge of Left Elevator
Details
09-09-2009
1.50
Rolled the leading Edge
Details
09-07-2009
2.00
Riveted the Left Elevator
Details
09-05-2009
8.00
Worked long and hard on Trim Tab
Details
09-04-2009
1.00
Drilled Left Elevator
Details
08-31-2009
0.75
From the leading egde of right Elevator
Details
08-30-2009
4.00
Riveted Right Elevator
Details
08-29-2009
6.00
Final Fitting of Right Elevator
Details
08-28-2009
1.00
Elevator Trailing Edges
Details
08-27-2009
1.50
Riveted Left Elevator Stiffeners
Details
08-25-2009
2.00
Priming the Left Elevator Skin and Parts
Details
08-23-2009
1.00
Riveted Stiffeners to Right Skin
Details
08-22-2009
1.00
Primed the Right Skin and Stiffeners
Details
08-21-2009
1.50
Electric Trim Mounting Bracket.
Details
08-20-2009
2.00
Elevator Stiffeners
Details
08-19-2009
1.50
Stiffeners for Left and Right Elevators
Details
08-18-2009
1.00
Started the Elevators
Details
SITE NAVIGATION
Contact Builder
RV-10 Home
RV-7A Home
Category
# Logs
# Hours
All
1042
2191
Avionics
58
98
Cockpit
15
28
Electrical
62
130
Elevators
21
106
Empennage
13
95
Engine
123
199
Firewall Forward
36
79
Flight
7
3
Fuel Tanks
68
126
Fuselage
333
734
Hanger
10
Horizontal Stab
27
82
Interior
2
8
Introduction
4
Miscellaneous
13
6
Mistakes
3
2
None
1
Paint Schemes
3
50
Practice Kit
3
3
Prop
4
2
Rudder
20
60
Shop
4
1
Shop Supplies
1
Tools
9
2
Vertical Stab
6
38
Wings
196
339
Copyright © 2001-2024 Matronics. All Rights Reserved.