KitLog pro

Powered By Kitlog Pro v2.0

Kens Web Site
Work Logs Found: 26
Category Work Time: 186 Hours
 Date
Hours
Work Log Summary

Details

 09-06-2010
3.50
Mass ballance ailerons/paint door levers
Details
       

 03-22-2010
5.00
Miscillaneous jobs wing finalization
Details
       

 03-18-2010
7.00
Aileron covering
Details

 03-13-2010
6.00
Jury strut components
Details
       

 03-12-2010
4.00
Set up wings in paint booth
Details
       

 01-28-2010
6.00
Installation of wing tips and nav /strobe lights
Details
       

 12-09-2009
9.00
R/H wing covering..cont
Details

 12-07-2009
9.00
R/H wing covering..cont
Details

 12-05-2009
7.00
R/H wing covering
Details

 12-03-2009
5.00
L/H wing final taping and fitting of exit fairings
Details
       

 11-25-2009
6.00
Reinforcing tapes
Details
       

 11-24-2009
12.00
Shrink fabric,Poly Brush,Rib stitch,access rings
Details
       

 11-23-2009
7.00
Cover lower surface of left hand wing
Details
       

 10-05-2009
8.00
R/H Wing,sheetmetasl and systems build up

 10-03-2009
8.00
R/H Wing build up

 10-02-2009
8.00
R/H wing build up

 10-01-2009
6.00
R/H wing build up.....
Details
       

 09-30-2009
8.00
Sheetmetal work L/H wing
Details
       

 09-28-2009
4.00
Tip wrap,strobe wiring,flap teleflex cable
Details
       

 09-28-2009
4.00
Miscillaneous wing systems build up
Details
       

 09-27-2009
7.00
Fuel tank installation/leak check and vent plumbin
Details
       

 09-26-2009
6.00
Installation of wing ribs
Details
       

 08-31-2009
1.00
Wing rib construction part two
Details
       

 08-30-2009
25.00
Wing rib construction/Part one
Details
       

 08-19-2009
6.00
Aileron bellcranks / Install in wing
Details
       

 08-17-2009
8.00
Build up Fwd and rear spars / Assy R/H wing
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.