Powered By Kitlog Pro v2.0
Kens Web Site
S-7S Courier
Wings
Work Logs Found:
26
Category Work Time:
186 Hours
Date
Hours
Work Log Summary
Details
09-06-2010
3.50
Mass ballance ailerons/paint door levers
Details
03-22-2010
5.00
Miscillaneous jobs wing finalization
Details
03-18-2010
7.00
Aileron covering
Details
03-13-2010
6.00
Jury strut components
Details
03-12-2010
4.00
Set up wings in paint booth
Details
01-28-2010
6.00
Installation of wing tips and nav /strobe lights
Details
12-09-2009
9.00
R/H wing covering..cont
Details
12-07-2009
9.00
R/H wing covering..cont
Details
12-05-2009
7.00
R/H wing covering
Details
12-03-2009
5.00
L/H wing final taping and fitting of exit fairings
Details
11-25-2009
6.00
Reinforcing tapes
Details
11-24-2009
12.00
Shrink fabric,Poly Brush,Rib stitch,access rings
Details
11-23-2009
7.00
Cover lower surface of left hand wing
Details
10-05-2009
8.00
R/H Wing,sheetmetasl and systems build up
10-03-2009
8.00
R/H Wing build up
10-02-2009
8.00
R/H wing build up
10-01-2009
6.00
R/H wing build up.....
Details
09-30-2009
8.00
Sheetmetal work L/H wing
Details
09-28-2009
4.00
Tip wrap,strobe wiring,flap teleflex cable
Details
09-28-2009
4.00
Miscillaneous wing systems build up
Details
09-27-2009
7.00
Fuel tank installation/leak check and vent plumbin
Details
09-26-2009
6.00
Installation of wing ribs
Details
08-31-2009
1.00
Wing rib construction part two
Details
08-30-2009
25.00
Wing rib construction/Part one
Details
08-19-2009
6.00
Aileron bellcranks / Install in wing
Details
08-17-2009
8.00
Build up Fwd and rear spars / Assy R/H wing
Details
SITE NAVIGATION
Contact Builder
S-7S Courier Home
Category
# Logs
# Hours
All
159
1129
Airframe,Firewall fw
5
24
Auxillary fuel syst.
2
10
Avionics
2
18
Electrical / Instrum
4
38
Empennage
5
69
Engine
9
72
facility
1
50
Fuselage
48
348
Miscellaneous
27
164
None
1
1
Paint
15
74
propeller Inst..
2
13
Test flying
2
4
The End
1
1
Weight and ballance
1
9
Wings
26
186
Wings
8
48
Copyright © 2001-2024 Matronics. All Rights Reserved.