KitLog pro

Powered By Kitlog Pro v2.0

My RV-12 Build Log
Work Logs Found: 93
Category Work Time: 236 Hours
 Date
Hours
Work Log Summary

Details

 05-09-2015
2.00
Installed Trim Tab
Details
       

 07-04-2013
3.00
Replaced Servo and Trim Wire pins
Details
       

 08-12-2012
3.00
TC Fairing work and installed Brake Reservoir
Details
       

 08-11-2012
5.00
Installed nutplates to TC and installed Servo
Details
       

 07-29-2012
4.50
Work on Tail Cone Fairings
Details
       

 07-08-2012
6.00
More work on the Tailcone Fairings
Details
       

 07-04-2012
6.00
Work on Tailcone Fairings
Details
       

 07-02-2012
1.50
Filed the edges of the Tailcone Fairings
Details
     

 07-01-2012
3.00
Worked on the Tailcone Fairings.
Details
       

 06-17-2012
3.00
Attached the AST assemblies to the Stabilator
Details
       

 12-26-2009
2.00
Drilling and Riveting of Fairings
Details
       

 11-12-2009
1.50
Work on V-Stab Fairing
Details
       

 11-11-2009
3.00
Work on Rudder Tip Fairing
Details
       

 11-10-2009
1.00
Riveting of Pushrod Assembly
Details
       

 11-09-2009
2.00
Pushrod Assembly
Details
       

 11-02-2009
1.00
Spade connectors installation.
Details
       

 11-01-2009
5.00
Servo Tray Preparation
Details
       

 10-31-2009
1.50
V-Stab Installation
Details
       

 10-30-2009
0.50
Completed Riveting Tailcone
Details
     

 10-29-2009
1.50
Riveting of Tail Cone
Details
       

 10-28-2009
2.50
Riveting of Top and Side Skins.
Details
       

 10-27-2009
1.00
Servo Tray Preparation and visit by Tech Counselor
Details
       

 10-11-2009
6.00
Riveting of Side and Upper Skins.
Details
       

 10-10-2009
8.00
Work on Pitot tubing, Brackets & Fwd Skin Rib.
Details
       

 10-09-2009
1.50
Temporary Attachment ofUpper Skins.
Details

 10-08-2009
1.50
Attachment of BulkHead and Side Skins.
Details
       

 10-07-2009
2.00
Riveted Lower Skins to the Bottom Skins.
Details
       

 10-06-2009
2.00
Riveting Bottom Skins
Details
       

 10-05-2009
2.50
Attachment of the Lower Skins.
Details
       

 10-04-2009
2.50
Tailcone Bottom Skin Assembly
Details
       

 09-27-2009
3.00
Priming of Tailcone Skins.
Details
       

 09-25-2009
2.00
Temporary installation of Bulkhead Assy to H-Stab.
Details

 09-24-2009
1.00
Re-install Hinge Brackets.
Details
       

 09-19-2009
2.50
Removal of Hinge Brackets.
Details
       

 09-15-2009
1.00
Hinge Brackets attached to Bulkhead Assembly.
Details
       

 09-14-2009
2.00
Work on Bulkhead Assembly.
Details
       

 09-13-2009
2.00
Riveting of F-1211 bulkhead assembly.
Details
       

 09-06-2009
4.00
Tail Skid Bracket Work and Bulkhead Assembly.
Details
       

 09-05-2009
4.00
Tail Skid and Bulkhead Work.
Details
       

 09-04-2009
2.00
Fuselage Frames Assembly
Details
       

 09-03-2009
1.00
Primed Tail Cone Parts.
Details

 09-01-2009
5.00
Started work on Tail Cone
Details
       

 08-20-2009
1.00
Installation of Counterbalance Weights.
Details
       

 08-19-2009
2.50
Enlarged holes of Counterbalance Brackets.
Details
       

 08-18-2009
4.00
Installation of the Upper and Lower Horns.
Details
       

 08-17-2009
2.50
Preparation and installation of Aft Skins.
Details
       

 08-13-2009
2.50
Riveting of Main Skin and Hinges.
Details
       

 08-11-2009
1.50
Hinge preparation.
Details

 08-09-2009
3.00
Riveting of bottom skin.
Details
       

 08-08-2009
4.00
Priming and preparation of Skins.
Details
       

 08-07-2009
2.50
Skin Splice Plate and Aft Skin Preparation.
Details

 08-06-2009
2.00
Main Skin Attached to Skeleton.
Details
       

 08-05-2009
2.00
Hinge and Mainskin Preparation.
Details
       

 08-03-2009
3.00
Completion of Stabilator Skeleton Assembly.
Details
       

 08-02-2009
1.00
Riveting Rib Clips and Ribs.
Details

 08-01-2009
1.00
Rib Preparation.
Details

 07-31-2009
1.50
Preparation of Ribs.
Details
       

 07-30-2009
1.00
Riveting Spar Box Assembly.
Details
       

 07-29-2009
1.00
Riveted CB bracket to Fwd Spar.
Details
       

 07-28-2009
2.00
Riveting of CB Bracket and making Hinge Stops.
Details
       

 07-27-2009
2.00
Attachment of Doublers and Nutplates.
Details
       

 07-26-2009
4.00
Drilling of nutplate attach rivet holes.
Details

 07-25-2009
5.00
Spar Box assembly.
Details
       

 07-24-2009
2.00
HS Spar Box assembly
Details
       

 07-13-2009
1.50
Countersinking and Final drilling stabilator parts
Details
       

 07-12-2009
2.00
Started work on stabilator.
Details

 07-06-2009
1.50
Completed riveting of AST.
Details
       

 07-05-2009
4.00
Riveted AST assembly, match drilled hinges.
Details
       

 07-04-2009
5.00
Work on anti-servo tabs.
Details
     

 07-03-2009
5.00
Primed and riveted rudder skin to skeleton.
Details
       

 07-01-2009
3.00
Riveting of rudder hinge brackets and ribs.
Details
       

 06-30-2009
2.50
Riveted rudder parts.
Details
       

 06-29-2009
1.00
Riveting Main Rib to Spar and Spar Caps.
Details

 06-28-2009
3.00
Completed riveting skin to V-Stab assembly.
Details
       

 06-27-2009
1.00
Riveting of V-Stab main skin.
Details
       

 06-26-2009
4.00
Primed rudder parts, Replaced rivets, Inspection.
Details
     

 06-23-2009
1.00
Work on Rudder Ribs.
Details

 06-22-2009
2.00
Work on rudder horn and ribs.
Details

 06-21-2009
1.50
Drilling of Spar Caps and Hinge Brackets.
Details

 06-20-2009
1.00
Separated Spar Caps and Hinge Brackets.
Details

 06-19-2009
2.50
Assembly of V-Stab main skin to skeleton.
Details
       

 06-18-2009
3.00
Dimpling of nutplates and holes.
Details

 06-16-2009
1.50
Final drilling and dimpling of V-stab skins.
Details
       

 06-15-2009
4.00
V-Stab skeleton assembly.
Details
       

 06-14-2009
4.00
Riveted V-stab parts.
Details
       

 06-13-2009
2.00
Priming V-Stab parts.
Details

 06-10-2009
1.00
Countersinking of V stab skeleton parts.
Details

 06-09-2009
2.00
Left spar cap work. Completed hinge assemblies.
Details
       

 06-07-2009
1.00
Continuing work on left spar caps
Details

 06-02-2009
1.00
Worked on Left spar caps.
Details

 05-31-2009
5.00
Upper and lower spar caps. Priming issues.
Details
       

 05-25-2009
2.00
Upper and lower spar caps work.
Details

 05-24-2009
2.00
V-stab upper and lower hinge assemblies.
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.