Powered By Kitlog Pro v2.0
My RV-12 Build Log
RV-12
Miscellaneous
Work Logs Found:
26
Category Work Time:
90 Hours
Date
Hours
Work Log Summary
Details
07-21-2018
1.00
Replaced Transponder Antenna
Details
03-25-2018
2.00
Replaced brake pads
Details
03-13-2018
1.50
Installed left wheel assembly
Details
03-11-2018
5.00
Installed fairing bracket
Details
03-10-2018
4.00
Rotated tires
Details
03-18-2017
1.00
Squeezed left Flaperon
Details
02-25-2017
5.00
Checked for fuel leak
Details
01-22-2017
3.00
Adjusted K ratio, purged brake lines
Details
06-02-2012
4.00
Built a shelving unit and cleaned hangar
Details
05-28-2012
5.00
Worked on spar opening, cart assembly, shop organi
Details
01-22-2012
24.00
Assembled workbench, unpacked tools and parts
Details
12-26-2011
5.00
Loaded aircraft in UHaul truck
Details
12-24-2010
5.00
Made workbench smaller
Details
10-16-2010
1.50
Put Wings in Stand & modified cradle to hold parts
Details
10-15-2010
1.00
Completed Wing Stand
Details
10-14-2010
1.50
Work on the Wing Stand
Details
10-13-2010
1.50
Clean up garage
Details
10-12-2010
1.00
Work on Wing Stand
Details
10-11-2010
2.00
Wing stand construction
Details
07-14-2010
0.50
Right wing checked by A&P
Details
06-04-2010
0.50
Fuselage Kit arrives
Details
05-14-2010
2.00
Built a wing cradle
Details
02-27-2010
2.00
Wing Kit Inventory
Details
02-17-2010
2.00
Repositioned H-Stab
Details
12-30-2009
4.00
Repositioned Tailcone
Details
05-16-2009
5.00
Built a workbench.
Details
SITE NAVIGATION
Contact Builder
RV-12 Home
Category
# Logs
# Hours
All
899
2532
Avionics
38
109
Empennage
93
236
Engine
25
88
Finishing
288
838
Firewall Forward
54
189
Fuselage
156
372
Inspection
5
18
Miscellaneous
26
90
Modifications
38
96
None
54
189
Pre-Flight Checks
7
11
Prop
2
9
Shop Supplies
3
8
Tools
1
3
Wings
109
276
Copyright © 2001-2024 Matronics. All Rights Reserved.