My RV-12 Build Log
Work Logs Found: 54
Category Work Time: 189 Hours
 Date
Hours
Work Log Summary

Details

 08-29-2015
3.50
Applied firewall sealant to firewall penetrations
Details
       

 08-23-2015
2.00
Firewall forward work
Details
       

 08-22-2015
5.00
Connected Throttle and Choke cable to Carbs
Details
       

 08-21-2015
2.00
Replaced carburetor floats
Details
       

 06-13-2015
4.00
Work on cooling system, empennage & glare shield
Details
       

 06-11-2015
1.50
Installed shroud hose, repositioned oil cooler
Details
     

 05-31-2015
1.50
Fitting the Bottom Cowl and Oil Cooler
Details
       

 05-30-2015
5.00
Placed heat shield on cow, installed oil hoses
Details
       

 05-23-2015
7.00
Installed heat shield and Trim Tab. AP knob work
Details
       

 05-21-2015
1.00
Made templates for Cowl Bottom heat shields
Details
       

 05-19-2015
1.50
Attached Cowl Duct Seal
Details
     

 05-17-2015
3.50
Work on Cooling Duct and Throttle & Choke cables
Details
       

 05-16-2015
4.00
Work on cooling system, throttle and choke cables
Details
       

 05-10-2015
4.00
Epoxied the Cooling Duct and Interface to the Cowl
Details
       

 04-26-2015
1.50
More work on the cooling duct and interface
Details
       

 04-19-2015
4.00
Work on the Cooling Duct and Cowl Interface
Details
       

 04-12-2015
5.00
Work on cooling system
Details
       

 01-11-2015
2.00
Trimmed Drain Hose and Vent Tube, checked SV
Details
       

 01-10-2015
4.00
Pitot Interconnect, Cooler Cable & Prop Spacer wor
Details
       

 01-04-2015
4.00
Relocated Regulator, Redo of Cable to Cooler Door
Details
       

 01-03-2015
6.50
Cooling system work, rectifier reposition
Details
       

 12-23-2014
3.00
Work on Cooler Box cable & Secured brake lines
Details
       

 12-22-2014
3.00
Installed Radiator and Seal Face
Details
       

 12-21-2014
5.00
Installed Oil Tank Assembly and Overflow Bottle
Details
       

 12-20-2014
3.50
Installed Cowl Oil Door and new throttle springs
Details
       

 12-14-2014
3.00
Work on the Cowl Cooling Duct & Oil Cooler
Details
       

 12-13-2014
1.00
Trimmed Cowl Cooling Duct
Details
     

 11-30-2014
1.50
Work on Radiator positioning
Details
     

 11-29-2014
8.00
Work on Cooling System
Details
       

 11-23-2014
1.50
Painted Cooling System parts
Details
       

 11-22-2014
6.00
Work on Cooling System
Details
       

 11-21-2014
1.50
Work on Cooler Box Assembly
Details
       

 11-16-2014
3.00
Work on Bottom Cowl Close-Out
Details
       

 11-15-2014
6.00
Cowling and Cooling System work
Details
       

 11-09-2014
1.50
Riveted the Upper Cowl Hinges
Details
       

 11-08-2014
5.50
Work on Cowling
Details
       

 11-02-2014
3.00
Cowling work
Details
       

 11-01-2014
8.00
Work on Spinner and Cowling
Details
       

 10-31-2014
0.50
Primed spinner plates
Details
     

 10-14-2014
5.50
Work on Exhaust System
Details
       

 10-13-2014
6.50
Riveted nutplates to spinner parts
Details
       

 10-11-2014
5.00
Positioned spinner and drilled holes into plates
Details
       

 09-28-2014
2.50
Installed Exhaust System, trimmed gap fillers
Details
       

 08-16-2014
4.00
Torqued engine mt. bolts, FWF wiring & plumbing
Details
       

 07-27-2014
4.00
FWF wiring and plumbing
Details
       

 07-26-2014
5.50
Hung Rotax 912 ULS
Details
       

 07-04-2014
5.50
Installed ADAHRS stiffener, drilled holes for engi
Details
       

 06-22-2014
3.00
Wiring for canopy latch. Drilled hole for engine m
Details
       

 04-05-2014
2.00
FWF wiring, EAA Tech Counselor visit
Details
       

 04-03-2014
4.00
Firewall forward wiring
Details
       

 04-02-2014
1.00
Work on EGT, FWF and Power wiring
Details
       

 03-16-2014
1.50
Installed battery and other electrical parts
Details
       

 05-10-2009
2.00
Parts inventory.
Details
       

 05-07-2009
0.00
Empennage/Tail cone kit arrives.
Details
       