Powered By Kitlog Pro v2.0
Scotts Kitfox Sport project
Kitfox Sport
Miscellaneous
Work Logs Found:
38
Category Work Time:
82 Hours
Date
Hours
Work Log Summary
Details
06-27-2009
2.60
AOA flap position micro switch installation.
Details
04-04-2009
1.50
Pitch trim assist installation
Details
03-29-2009
2.00
Autopilot pitch servo pushrod installation.
Details
03-24-2009
1.40
Static port installation.
Details
03-22-2009
1.70
Cabin lighting installation
Details
03-21-2009
3.30
Control stick wiring
Details
03-08-2009
3.50
Seat support strap installation.
Details
01-25-2009
4.00
Altrak autopilot installation.
Details
01-03-2009
2.60
R/H landing light installation.
Details
01-01-2009
3.00
Final graphics installation.
Details
12-29-2008
2.00
Wingtip light installation.
Details
12-25-2008
0.80
Nose wheel pant installation plus graphics applica
Details
11-30-2008
0.70
Autopilot roll servo pushrod installation.
Details
11-25-2008
2.50
Altrak VS autopilot servo installation.
Details
11-23-2008
3.20
Graphics installation on tail.
Details
11-15-2008
1.20
main gear wheel pant installation.
Details
06-08-2008
1.80
Cabin soundproofing.
Details
03-02-2008
2.00
Map box latch fabrication.
Details
02-12-2008
1.70
TruTrak autopilot roll servo installation.
Details
02-12-2008
2.20
Cockpit throttle mount fab and install.
Details
12-27-2007
0.40
Firewall soundproofing.
Details
06-11-2007
0.80
NACA cabin air intake duct.
Details
05-26-2007
0.80
NACA cabin air inlets.
Details
05-26-2007
0.50
Instrument panel storage compartment.
Details
05-20-2007
3.00
Instrument panel storage.
Details
05-19-2007
2.50
Instrument panel storage compartment.
Details
03-31-2007
0.80
Instrument panel fabrication.
Details
10-21-2006
4.80
Disassembly of fuselage for paint.
Details
06-07-2006
0.40
Nose wheel pant installation.
Details
06-07-2006
0.80
L./E wing rood fairing fabrication.
Details
04-22-2006
2.50
Turtledeck wing root fairings.
Details
09-10-2005
1.20
Magnetometer mount installation.
Details
09-08-2005
3.40
Magnetometer wing mount installation.
Details
12-12-2004
2.00
Main gear wheel pant installation.
Details
12-11-2004
2.50
Wheel pant installation.
Details
08-22-2004
1.60
Upholstery installation.
Details
08-09-2003
3.50
Epoxy prime small parts.
Details
07-02-2003
6.50
Epoxy varnish wooden parts.
Details
SITE NAVIGATION
Contact Builder
Kitfox Sport Home
Category
# Logs
# Hours
All
429
1145
Avionics
14
31
Engine
29
33
Engine installation
4
7
Fabric covering
74
295
Final assembly
38
88
Fuselage
88
185
Horizontail Stabiliz
17
42
Landing gear
12
18
Miscellaneous
38
82
Paint
26
124
Prop
2
1
Strut Fairings
12
13
Wings
64
192
Wingtip
11
34
Copyright © 2001-2024 Matronics. All Rights Reserved.