Powered By Kitlog Pro v2.0
Michaels Web Site
RV8
Left Fuel tank
Work Logs Found:
10
Category Work Time:
34 Hours
Date
Hours
Work Log Summary
Details
10-06-2008
2.00
Riveted Leading Edge Ribs to Skin
09-28-2008
8.30
Final seal of tank with baffle
09-14-2008
5.00
Sealed and rivet root inboard rib
Details
09-07-2008
4.00
4,5,6 ribs riveted and sealed
02-13-2008
2.00
Prep Ribs for sealing
01-09-2008
2.00
Riveted 2,3, Ribs fuel Tank
04-04-2007
3.00
Preped Skin
04-15-2006
1.00
Cut stiffeners
04-01-2006
5.00
Installed z brackets
03-26-2006
2.00
Installed ribs in fuel tank
SITE NAVIGATION
RV8 Home
Category
# Logs
# Hours
All
127
395
Empennage
3
5
Fiberglass tips
2
7
Fuselage
2
5
Fuselage
2
11
Horizontial Stab
15
58
left aileron
3
10
left elevator
8
14
Left Flap
11
32
Left Fuel tank
10
34
Ribs
4
11
Right elevator
4
12
Right Flap
1
2
Right Fuel Tank
7
32
Right Wing
13
44
Rudder
8
15
Shop Supplies
2
2
Trim Tab
1
2
Vertical Stablizer
4
11
Wings
27
88
Copyright © 2001-2024 Matronics. All Rights Reserved.