Powered By Kitlog Pro v2.0
Michaels Web Site
RV8
Wings
Work Logs Found:
27
Category Work Time:
88 Hours
Date
Hours
Work Log Summary
Details
07-11-2009
1.00
Wrapped Wings and put in storage
07-09-2009
2.00
Completed Wings
07-08-2009
4.00
Installed Rivet nut plates inspection plate
11-30-2008
1.00
Installed2-414 & W413 Aileron Bracket
11-09-2008
6.50
completed riviting top skins
11-02-2008
3.00
Debured,Dimpled bottom skins
10-27-2008
1.00
Aleron Brackets
10-26-2008
4.00
Riveted inboard top skin
10-18-2008
5.00
Completed Leading Edge to Spar
10-15-2008
6.00
Riveted Leading edge to spar
10-13-2008
3.00
Riveted Ribs to Main Spar
03-25-2006
1.00
Drilled Leading edge skins
03-18-2006
5.00
Leading edge clecoed and istalled on spar
03-16-2006
2.00
Drilled skins on left wing
02-27-2006
2.00
Fabricated doubler skin for wing walk
Details
02-26-2006
4.00
Constructed wing jig and hug spar
02-18-2006
5.50
Installed Tie down brackets and hinge
02-09-2006
7.00
Riveted doublers to rear spar
02-04-2006
4.00
Rear Spar construction
Details
01-28-2006
0.50
Tie down brackets measured and fabricate spacer
01-28-2006
0.50
Primed counter sink holes and inspection plate
01-26-2006
1.00
nut plates installed forward wing
01-22-2006
2.00
Installed nut plates lower wing inspection plates
01-21-2006
8.00
counter sunk spar fuel tank
Details
01-20-2006
2.00
Wing inventory inspected spar
01-17-2006
1.00
Received wing kit
02-12-2005
6.00
Completed Vertical Stabilzer
Details
SITE NAVIGATION
RV8 Home
Category
# Logs
# Hours
All
127
395
Empennage
3
5
Fiberglass tips
2
7
Fuselage
2
5
Fuselage
2
11
Horizontial Stab
15
58
left aileron
3
10
left elevator
8
14
Left Flap
11
32
Left Fuel tank
10
34
Ribs
4
11
Right elevator
4
12
Right Flap
1
2
Right Fuel Tank
7
32
Right Wing
13
44
Rudder
8
15
Shop Supplies
2
2
Trim Tab
1
2
Vertical Stablizer
4
11
Wings
27
88
Copyright © 2001-2024 Matronics. All Rights Reserved.