KitLog pro

Powered By Kitlog Pro v2.0

Scotts Kitfox Sport project
Work Logs Found: 64
Category Work Time: 192 Hours
 Date
Hours
Work Log Summary

Details

 11-29-2008
2.90
Flaperon installation.
Details

 10-01-2008
3.00
L/H wing installation.
Details

 09-30-2008
3.50
Final installation of R/H wing.
Details

 02-03-2008
0.90
L/H wing vortex generator installation.
Details
       

 11-18-2007
1.00
Flaperon end caps.
Details
       

 11-07-2007
1.10
R/H wing VG installation.
Details
       

 06-18-2006
1.00
Remove wings
Details

 09-27-2005
1.30
Pitot tube instllation
Details
       

 08-23-2003
0.80
AOA wing port installation.
Details

 08-10-2003
2.30
Removal of wings.
Details
       

 08-10-2003
4.40
AOA wing pressure port installation.
Details
       

 08-07-2003
1.70
Butt rib installation.
Details
     

 08-03-2003
2.60
Fuel tank installation.
Details

 08-03-2003
2.40
Fuel tank installation.
Details

 08-03-2003
2.70
Fuel tank installation R/H.
Details

 08-02-2003
1.80
Trailing edge installation.
Details

 07-27-2003
2.90
Fuel tank installation.
Details
       

 07-27-2003
1.70
Fuel tank installation.
Details

 07-27-2003
2.50
Fuel tank installation L/H.
Details

 07-26-2003
2.50
Fuel tank installation.
Details
       

 07-26-2003
4.20
Fuel tank installation.
Details
       

 07-25-2003
4.50
Leading edge installation.
Details

 07-25-2003
3.50
Fuel tank pressure test.
Details

 07-24-2003
4.50
Wing leading edge installation.
Details

 07-24-2003
3.00
Flaperon bracket installaition.
Details
       

 07-23-2003
1.00
Flaperon tip installation.
Details

 07-23-2003
3.20
Flaperon mass balance installation.
Details
       

 07-23-2003
3.50
Flaperon conrol horn assembly,
Details
       

 07-22-2003
2.50
Flaperon tip installation.
Details
     

 07-21-2003
3.50
Wing strut fairing installation.
Details

 07-21-2003
5.80
Butt rib installation.
Details
     

 07-20-2003
1.50
Leading edge installation.
Details
     

 07-20-2003
3.00
Flaperon installation.
Details
     

 07-20-2003
3.00
Flaperon end rib and tip installation.
Details
       

 07-20-2003
3.20
Flaperon clamping fixture.
Details
     

 07-06-2003
2.50
False rib installation.
Details

 07-06-2003
1.20
Butt rib installation.
Details
     

 07-05-2003
8.20
Leading edge installation
Details
       

 07-05-2003
5.50
Epoxy varnish.
Details

 07-04-2003
8.50
Flaperon bracket installation
Details
       

 07-04-2003
9.50
False rib installation.
Details
       

 07-02-2003
3.50
Epoxy varnish.
Details

 06-22-2003
3.10
Wing rib installation,
Details

 06-22-2003
6.40
Wing epoxy varnishing.
Details

 06-21-2003
3.20
Varnish wing ribs,
Details

 06-20-2003
2.50
False rib installation.
Details

 06-19-2003
0.70
Butt rib installation
Details
       

 06-18-2003
3.20
Butt rib installation.
Details
       

 06-16-2003
1.60
#1 rib installation.
Details
       

 05-26-2003
2.80
Wing dihedral and twist adjustment.
Details

 05-26-2003
3.80
Jury strut installation.
Details
       

 05-25-2003
1.10
Wing rib #1 installation.
Details
       

 05-25-2003
0.50
Stringer and false rib installation.
Details
     

 05-25-2003
7.00
Sand wing ribs.
Details
       

 05-25-2003
3.20
Initial wing installation.
Details
       

 05-24-2003
2.80
Spar attach reinforcement fitting installation.
Details

 05-24-2003
1.50
Lift strut attach bracket installation.
Details
     

 05-24-2003
1.40
Lift strut attach bracket installation
Details

 05-24-2003
0.30
Lift strut / bracket installation
Details

 05-23-2003
3.10
Spar attach reinforcement fitting installation.
Details
       

 05-23-2003
1.50
Lift strut attach bracket installation.
Details
       

 05-18-2003
3.30
Spar attach reinforcement fitting installation.
Details
       

 05-18-2003
5.80
Lift strut bracket installation.
Details
       

 05-18-2003
1.50
Lift strut attach bracket installation.
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.