Powered By Kitlog Pro v2.0
Scotts Kitfox Sport project
Kitfox Sport
Fuselage
Work Logs Found:
88
Category Work Time:
185 Hours
Date
Hours
Work Log Summary
Details
04-05-2009
1.20
Seat pan installation.
Details
04-04-2009
0.70
Cargo bay installation.
Details
01-18-2009
2.30
Pitch trim installation
Details
12-30-2008
0.50
Rudder cable installation.
Details
11-15-2008
0.60
Rudder final installation.
Details
09-29-2008
1.20
Cabin door installation.
Details
02-24-2008
0.50
Instrument panel fabrication.
Details
04-11-2006
2.60
Nose wheel fairing installation.
Details
09-08-2005
1.80
R/H wing root gap cover.
Details
09-07-2005
2.10
L/H wing root close out panel.
Details
03-12-2005
2.80
Door gas strut installation.
Details
03-12-2005
1.00
Cabin door window installation.
Details
08-22-2004
3.50
Master cylinder installation.
Details
08-22-2004
3.00
Center console side panel installation.
Details
05-31-2004
0.80
Cabin door installation.
Details
05-30-2004
4.00
Cabin heater installation.
Details
05-30-2004
0.60
Cabin door installation.
Details
05-29-2004
0.30
Sholder harness attachment holes.
Details
05-20-2004
2.70
Door frame shimming.
Details
05-19-2004
2.40
R/H cabin door installation.
Details
05-18-2004
3.00
L/H cabin door shimming.
Details
05-16-2004
0.40
Door gas spring strut bracket,
Details
05-12-2004
0.40
Rudder fairing installation.
Details
05-12-2004
1.00
Pitch trim bracket and cable installation.
Details
05-12-2004
0.50
Door frame installation.
Details
05-05-2004
2.00
Quarter window installation.
Details
05-03-2004
2.80
Tail access cover mounting provisions.
Details
05-02-2004
1.50
Tail access cover mounting provisions.
Details
05-02-2004
0.50
Rudder fairing installation.
Details
04-29-2004
1.40
Rudder cable installation.
Details
04-25-2004
0.50
Rudder fairing installation.
Details
04-24-2004
1.00
Tail access bulkhead installation.
Details
08-10-2003
2.20
Center console installation.
Details
08-10-2003
1.60
Center console bracket installation.
Details
08-08-2003
0.80
Tip fairing installation.
Details
07-27-2003
1.80
Belly stringer installation.
Details
07-26-2003
2.00
Cargo bay installation.
Details
07-24-2003
1.20
Rudder fairing installation.
Details
07-02-2003
1.20
Vertical stabilizer and rudder tip fairings.
Details
07-01-2003
0.90
Vertical stabilizer tib fabrication.
Details
07-01-2003
1.70
Trim lever installation.
Details
07-01-2003
1.20
Center console installation.
Details
07-01-2003
7.00
Airfoiled vertical tail installation.
Details
06-21-2003
0.40
Rudder rib installation.
Details
06-20-2003
5.10
Rudder pedal installation.
Details
06-20-2003
2.50
Rudder pedal installation
Details
06-19-2003
1.80
Rudder pedal pully installation.
Details
06-19-2003
1.70
Rudder pedal installation.
Details
06-19-2003
1.30
Rudder pedal ajustment lever installation.
Details
06-19-2003
1.90
Rudder cable installation.
Details
06-19-2003
2.80
Center console installation
Details
06-18-2003
3.00
Varnish wood ribs in vertical stab and rudder.
Details
06-18-2003
1.00
Center consol installation.
Details
06-18-2003
1.70
Adjustable rudder pedal installation.
Details
06-17-2003
8.70
Rudder rib installation.
Details
06-16-2003
9.20
Vertical Stab rib installation.
Details
05-18-2003
0.40
Insturment panel installation.
Details
05-17-2003
2.30
Door parts fabrication.
Details
05-17-2003
1.10
Door frame installation.
Details
05-04-2003
2.90
Door frame installation.
Details
05-04-2003
4.90
Door frame installation.
Details
05-04-2003
3.80
Door frame installation
Details
05-03-2003
2.30
Door frame installation.
Details
05-03-2003
4.30
Door frame installation
Details
04-20-2003
1.90
Door frame installation.
Details
04-20-2003
5.70
Door frame installation.
Details
04-20-2003
1.90
Door frame installation.
Details
04-20-2003
1.40
Door frame installation.
Details
04-19-2003
6.20
Door frame installation.
Details
04-18-2003
3.50
Door latch Installation.
Details
04-18-2003
5.60
Door frame installation.
Details
03-23-2003
5.20
Side stringer installation
Details
03-23-2003
1.50
Seat pan installation.
Details
03-23-2003
0.60
Rudder installation.
Details
03-23-2003
0.40
Rudder cable pulley installation.
Details
03-23-2003
1.60
Mixer and push-pull tube installation.
Details
03-23-2003
1.40
Floorboard installation.
Details
03-23-2003
1.70
Flap handle installation
Details
03-23-2003
2.60
Elevator push-pull tube installation
Details
02-23-2003
0.70
Fuselage preparation.
Details
02-23-2003
1.80
Flaperon mixer assembly
Details
02-23-2003
0.70
Elevator bellcrank installation.
Details
02-23-2003
1.50
Control stick pivots installation.
Details
02-23-2003
2.10
Control column installation.
Details
02-23-2003
1.00
Control column bracket assembly.
Details
02-23-2003
1.00
Control column assembly.
Details
02-23-2003
0.60
Aileron bellcrank installation.
Details
02-22-2003
0.50
Flight control installation.
Details
SITE NAVIGATION
Contact Builder
Kitfox Sport Home
Category
# Logs
# Hours
All
429
1145
Avionics
14
31
Engine
29
33
Engine installation
4
7
Fabric covering
74
295
Final assembly
38
88
Fuselage
88
185
Horizontail Stabiliz
17
42
Landing gear
12
18
Miscellaneous
38
82
Paint
26
124
Prop
2
1
Strut Fairings
12
13
Wings
64
192
Wingtip
11
34
Copyright © 2001-2024 Matronics. All Rights Reserved.