Work Logs Found: 179
Category Work Time: 542 Hours
 Date
Hours
Work Log Summary

Details

 08-13-2014
3.00
Installed nut plates for battery cage
Details

 08-02-2014
0.70
Patched old battery vent hole
Details
       

 07-26-2014
2.30
Set rudder deflection & tensioned cables
Details

 07-22-2014
3.50
Adjusted elevator deflection & cable tension
Details
       

 06-18-2013
0.10
Installed document holder
Details
     

 06-18-2013
2.10
Created interior canoy handles
Details
       

 06-15-2013
1.20
Installed shim under striker plates
Details
       

 06-15-2013
1.80
Installed canopy guides
Details
       

 06-06-2013
0.90
Installed aircraft data p[ate
Details
     

 04-16-2013
3.00
Troubleshot & repaired door latch
Details
     

 02-16-2013
10.10
Finished co-pilot seat
Details
       

 02-04-2013
7.90
Installed new canopy
Details
       

 11-13-2012
10.50
Reinstalled canopy frame
Details
       

 10-06-2012
2.90
Connected fuel line and fuel senders
Details
       

 08-21-2012
4.30
Installed rudder
Details
       

 06-25-2012
4.50
Installed new canopy
Details
       

 06-19-2012
1.90
Worked on fiberglassing cowling
Details
       

 06-11-2012
3.20
Routed fuel line and passed through firewall
Details

 05-17-2012
2.10
Began installation of seat surface.
Details
       

 05-16-2012
1.70
Installed fropnt and side panels on seat
Details
       

 05-16-2012
0.90
Attached velcro strips to canvas back and seat sli
Details
       

 05-15-2012
1.10
More interior upholstry
Details
       

 05-14-2012
2.80
Began upholstry of interior
Details
       

 05-13-2012
1.70
Fit check of upholstry parts
Details
       

 05-07-2012
1.80
Worked on finish interior
Details
       

 05-06-2012
2.10
Started cutting pattern for seat covers
Details
     

 05-03-2012
2.10
Added mount for Lightspeed control
Details

 04-20-2012
2.70
Built foam seat cushions on passenger side
Details
       

 04-17-2012
5.00
Worked on upholstry
Details
       

 04-16-2012
3.00
Began cutting foam for seat cushions
Details
       

 03-16-2012
0.50
Fit check cowling
Details
       

 02-14-2012
2.50
Updated seat drawings & cut seat backs
Details

 02-14-2012
2.50
Fabricated and installed seat back clips
Details
       

 02-09-2012
3.50
Started drawings of seat upholstry
Details
       

 09-16-2011
8.00
Shot clear coat on aircraft
Details

 09-09-2011
6.00
Painted lower cowl
Details
       

 09-02-2011
6.00
Primed and painted upper cowl
Details
       

 08-19-2011
16.00
Added oil filler access door
Details
       

 08-12-2011
80.00
Fine fit engine cowlings
Details
       

 07-15-2011
8.10
Designed and fabbed cowling attachments
Details
       

 07-09-2011
3.90
Prepared for installation of upper cowl
Details
       

 07-06-2011
8.00
Installed lower cowl attachments
Details
       

 07-02-2011
6.50
engine cowling preparation
Details
       

 07-01-2011
1.00
Installed "N" number markings
Details
       

 06-25-2011
1.00
Installed seat belts and shoulder harnesses
Details
       

 06-20-2011
0.50
Put protective strip along top of instrument panel
Details
       

 06-20-2011
0.30
Installed rubber strip on aouminum closeout
Details
       

 06-20-2011
1.00
Forced canopy to conform to side closeout
Details
       

 06-18-2011
2.50
Installed weather seal and experimental logo
Details
       

 06-17-2011
2.90
Applied more paint, secured canopy hinge
Details
     

 06-16-2011
1.50
Painted bottom; removed masking
Details
       

 06-15-2011
3.10
Primed under fuselage, painted sides white
Details
       

 06-13-2011
3.00
Cleanup, taping for primer on bottom and white on
Details

 06-11-2011
1.75
painted upper half of fuselage red
Details
       

 06-10-2011
2.50
Primed upper fuselage
Details

 06-09-2011
2.00
Touched up cockpit trim
Details

 06-08-2011
1.00
Add door handles
Details
       

 06-02-2011
0.50
Painted top of instrument panel
Details
       

 06-01-2011
0.50
Rivet outside flashing
Details
       

 06-01-2011
5.30
Install canopy
Details
       

 05-30-2011
0.50
Dimple outside flashing
Details
       

 05-28-2011
2.10
Mount canopy rail
Details
       

 05-27-2011
2.10
Corrected rear canopy frame installation
Details
       

 05-26-2011
2.50
Built replacement 6C3s
Details
       

 10-01-2010
2.50
Installed saddle 6B21-5
Details
       

 09-28-2010
1.00
Riveted fwd top skin in place
Details
       

 09-24-2010
1.10
Riveted support channel in place
Details
       

 09-15-2010
4.00
Added access to top of instrument panel.
Details
       

 09-10-2010
8.00
Installed fuel lines and tank sensor line to cente
Details
       

 09-08-2010
2.20
Painted interior canopy frame
Details
       

 09-07-2010
1.00
Installed scat between air vent and eyeball outlet
Details
       

 08-25-2010
1.20
Mounted fresh air vents in panel
Details
       

 08-20-2010
4.00
Riveted control panel in place, began integrating
Details
       

 08-04-2010
1.50
Mounted gascolator
Details
       

 07-27-2010
0.50
Installed inside canopy flashing
Details
     

 07-24-2010
1.50
Install inside angle
Details
       

 07-22-2010
1.70
Prepare outside falshing for installation
Details
     

 07-20-2010
2.80
Cut inside flashing to fit
       

 07-17-2010
1.50
Installed the rear canopy frame
Details
       

 06-22-2010
2.90
Installed nut plates to fasten bottom fuselage acc
Details
       

 06-21-2010
20.50
Fabricating the rear canopy frame
Details
       

 06-08-2010
1.30
Route canopy lock cable
Details
       

 06-08-2010
2.50
Position and install front canopy frame
Details
       

 06-08-2010
0.60
Install canopy lock
Details
       

 05-13-2010
0.80
Added engine mount
Details
       

 05-13-2010
2.50
Added canopy mount arm
Details
       

 05-05-2010
5.30
Added nutplates to mount center console
Details
       

 05-04-2010
6.10
Added front top skin
Details
       

 05-02-2010
4.20
Riveted rear top skins in place
Details
       

 04-30-2010
3.10
Clecoed middle top skin in place
Details
       

 04-29-2010
2.10
Added stiffners and provisions for ELT antenna; mo
Details
       

 04-28-2010
0.80
Clecoed tube frames in place
Details
       

 04-27-2010
2.30
Started installation of lower fuselage access door
Details
       

 04-27-2010
5.30
Installed baggage floor
Details
       

 04-26-2010
1.90
Built & installed ELT access panel
Details
       

 04-01-2010
2.50
Fit and clecoed support channel
Details
       

 03-30-2010
1.00
Trimmed, cut, fit, clecoed Center Console
Details
       

 03-30-2010
2.50
Cut, fit, & clecoed port side fairing
Details
       

 03-29-2010
4.30
Cut & clecoed stbd side fairing
Details
       

 02-20-2010
0.40
Add vent lines to battery box
Details
       

 01-30-2010
1.30
installed lower rudder fairing
Details
       

 01-29-2010
2.50
Install upper rudder bearing
Details
     

 01-03-2010
0.50
Deburr, clean, prime rear top skin
Details
       

 01-03-2010
0.80
Cut rear top skin to mate with horizontal stabiliz
Details
       

 12-31-2009
0.80
clean and prime stiffners, fwd aft skin
Details
     

 12-30-2009
1.50
Install comm and gps antenna stiffners
Details
       

 12-28-2009
1.50
Install fwd aft skin stringers
Details
 

 12-26-2009
11.50
Install aft fwd skin
Details
       

 12-25-2009
9.10
Install second tube frame
Details
       

 12-12-2009
5.30
Drilled and installed first tube frame
Details
       

 12-10-2009
2.50
Drilled and clecoed top rear to fuselage side
Details
       

 12-09-2009
1.70
installed rear top skin
Details
       

 12-09-2009
2.10
drilled upper tail section
Details
       

 11-03-2009
1.00
Riveted port fwd side skin in place
Details
       

 11-03-2009
1.40
Riveted pilot's front seat panel and seat bottom i
Details
       

 11-02-2009
6.00
Trim and hang forward side skins
Details
       

 11-02-2009
0.90
Fab & Install lower elevator fairlead
Details
       

 10-31-2009
2.20
Riveted seat back assembly in place
Details

 10-31-2009
0.50
Riveted rudder cable fair leads in place
Details
     

 10-31-2009
0.30
Reinstalled firewall assembly
Details
     

 10-30-2009
1.20
Riveted rear frame channel in place
Details
       

 10-30-2009
1.10
Riveted arm rest sides in place
Details
       

 10-30-2009
0.60
Riveted 6B19-9 to 6B16-3 and rear seat panel
Details
       

 10-30-2009
0.50
Riveted 6B16-5, 6B19-10, and 6B17-1 to rear seat p
Details
       

 10-29-2009
2.50
Riveted rudder pedals and brakes in place.
Details
       

 10-29-2009
0.60
Join front and rear floors with gear channel
Details
       

 10-29-2009
1.60
Cut fairleads 6B23-2, -3, and -4
Details
       

 10-28-2009
1.10
Riveted lower forward longerons in place
Details

 10-28-2009
0.80
Riveted floor channels in place
Details
       

 10-27-2009
19.70
Disassaembled parts in front area, deburred, clean
Details
       

 10-18-2009
3.60
installed control connection on center spar.
Details
       

 10-17-2009
0.00
Milestone
Details
       

 10-17-2009
0.70
Installed closeout/brace at lower port end of pilo
Details
       

 10-17-2009
2.50
Install upper fuselage longeron doublers
Details
       

 10-16-2009
2.40
Install flap actuator mount
Details
       

 10-15-2009
1.30
Install seat bottoms
Details
       

 10-15-2009
1.35
Install outboard seat belt attach
Details
       

 10-15-2009
0.70
Install arm rest cover
Details
       

 10-14-2009
0.90
Inboard seat belt reinforcement
Details
       

 10-13-2009
2.10
Lower engine mount
Details
       

 10-12-2009
0.90
Installed rolled gussets
Details
       

 10-12-2009
2.30
Installed gussets 6B15
Details
       

 10-11-2009
3.20
Added vertical and side stiffners to forward fusel
Details
       

 10-10-2009
2.70
Clecoed upper edges of 6B10-1 to lower edge of sid
Details
       

 10-07-2009
2.00
Prepare to attach 6B10-2 to side skins
Details
       

 10-05-2009
2.00
Install front seat panels
Details
       

 10-04-2009
3.00
Fabricate front seat panel stiffners
Details
       

 10-02-2009
2.00
Installed 6B17-6
Details
       

 10-02-2009
0.50
Install aileron control horn
Details
     

 10-01-2009
1.50
Installed 6B17-1 and 6B17-3
Details
       

 09-30-2009
0.50
Drilled holes in bulkhead for aft skin
Details
       

 09-26-2009
0.70
Secure back baggage floor to fwd bulkhead
Details
       

 09-26-2009
0.90
Opened baggage side support rivets to A4
Details
       

 09-26-2009
0.80
Make aft upper longeron splices
Details
       

 09-26-2009
1.10
Attach forward baggage floor to baggage floor sup
Details
       

 09-26-2009
0.90
Add fwd baggage floor closeouts
Details
       

 09-25-2009
2.00
Replaced upright channels and installed upper chan
Details

 09-25-2009
2.00
Attached baggage floor to upper channel
Details

 09-25-2009
1.50
Attached baggage floor to fore-aft stiffners
Details
     

 09-24-2009
2.00
Connected baggage side supports to baggage floors
Details
     

 09-21-2009
2.00
Worked on baggage floor support installation
Details
       

 09-19-2009
1.50
Preparation of baggage floor for installation
Details
       

 09-19-2009
1.10
Catching up on lost rivets, part 2
Details
     

 09-19-2009
1.20
Added fairlead to Middle bulkhead
Details
       

 09-17-2009
1.50
Installed aft fuselage bulkhead and marked locatio
Details
       

 09-17-2009
1.50
Clecoed remaining bulkheads in place
Details
       

 09-17-2009
1.50
Added stiffners to bulkhead 6B12-2.
Details
       

 09-15-2009
1.30
Catching up on lost rivets, part 1
Details
       

 09-15-2009
2.20
Added stiffner to seat back, and center seat back
Details
       

 09-14-2009
1.50
Opened holes around Gear attach, port and stbd
Details
       

 09-14-2009
1.20
Install vertical channels
Details
       

 09-14-2009
1.00
Drill 5/16" bolt holes in wing uprights
Details
       

 09-12-2009
0.50
Open upper port longeron and gear upright holes to
Details
     

 09-12-2009
1.50
install stbd wing attachment uprights
Details
       

 09-12-2009
0.50
Install port gussets
Details
       

 09-12-2009
1.00
Install lower gusset
Details
       

 09-12-2009
0.50
fabricate and install wing jig port side
Details
       

 09-12-2009
1.50
Drill additional holes in main gear mount
Details
       

 09-11-2009
0.80
installed gear uprights
Details
       