Powered By Kitlog Pro v2.0
Ivans RV 10
RV10
Fuselage
Work Logs Found:
46
Category Work Time:
69 Hours
Date
Hours
Work Log Summary
Details
01-29-2009
4.00
Rear seat back Completion
Details
01-14-2009
1.50
Finished fitting Tunnel covers.
Details
01-05-2009
2.00
finish baggage door
Details
12-30-2008
2.50
Baggage door install
Details
12-27-2008
3.10
Finish baggage corrugation prep.
Details
12-24-2008
0.70
rivet baggage cover
Details
12-23-2008
0.30
tailcone top skin
Details
12-23-2008
0.50
rivet nutplates to baggage floors
Details
12-23-2008
0.50
rivet baggage bulkhead
Details
12-23-2008
2.20
baggage corrugations
Details
12-21-2008
0.60
Upper baggage door Channel
Details
12-21-2008
0.70
Re position static source tubing
Details
12-21-2008
0.20
cleco baggage covers
Details
12-21-2008
0.30
baggage door seal channel
Details
12-19-2008
1.30
seat and baggage floors
Details
12-19-2008
0.70
baggage floors
Details
12-19-2008
0.30
baggage floors
Details
12-16-2008
2.00
seat and baggage floors
Details
11-18-2008
1.00
changed FPS system
Details
10-21-2008
1.50
finish control column adjustment.
Details
10-20-2008
1.50
control column adjustment
Details
10-19-2008
0.50
Test flap operation
Details
10-19-2008
2.00
control column install
Details
10-18-2008
4.00
finish flap tube install
Details
10-16-2008
1.50
flap tube install
Details
10-14-2008
2.00
Flap control tubes
Details
10-11-2008
3.30
Elevator and control systems
Details
10-09-2008
1.50
make and prime elevator pushrods
Details
10-07-2008
0.50
Seat back closeout
Details
10-07-2008
0.70
Elevator Idler brackets
Details
09-13-2008
1.50
stall buzzer
Details
08-28-2008
3.20
Rear Floor Pans (Passenger)
Details
08-15-2008
0.70
Fuel lines
Details
08-09-2008
1.00
Fuel Lines
Details
08-07-2008
2.50
Fuel Lines
Details
07-29-2008
1.00
Fuel Lines
Details
07-09-2008
3.00
Brake lines
Details
07-08-2008
0.30
Upper FWD Fuselage Assembly
Details
07-07-2008
0.75
Step Installation.
Details
07-06-2008
4.50
Fuselage Side Skins
Details
07-04-2008
0.50
Mid Seat Rail Support Rivet.
Details
07-03-2008
2.30
FWD Ribs, Bulkheads and Bottom Skins
Details
07-02-2008
0.50
Mid Fuselage Ribs and Bottom Skins
Details
07-02-2008
0.50
Mid Fuselage Bulkheads
Details
07-02-2008
0.50
Firewall
Details
01-08-2008
3.00
Seat Floors and Tunnel covers
Details
SITE NAVIGATION
RV10 Home
Category
# Logs
# Hours
All
273
519
Aileron Actuation
5
12
Ailerons
1
2
Auto Pilot
3
5
Baggage Area
1
1
Baggage Door
2
4
Elevator
32
79
Empennage Attach
17
24
Fairings
11
16
Flaps
2
0
Fuselage
46
69
Horizontal Stabilize
23
56
Inventory
1
3
Miscellaneous
3
3
Rudder
13
28
Rudder and Brake Ped
4
9
Tailcone
44
79
Tailcone Attach
4
14
Vertical Stabilizer
12
22
Wing Tips
7
19
Wings
29
56
Wiring
13
18
Copyright © 2001-2024 Matronics. All Rights Reserved.