Powered By Kitlog Pro v2.0
Ivans RV 10
RV10
Aileron Actuation
Work Logs Found:
5
Category Work Time:
12 Hours
Date
Hours
Work Log Summary
Details
05-29-2008
2.10
BC to Ail Pushrod Install. R
Details
05-28-2008
2.00
TT to BC Installation, BC to Ail. pushrod Install.
Details
05-26-2008
2.50
Torque Tube Installation
Details
05-25-2008
2.50
Torque tubes and bellcrank assembly
Details
05-24-2008
2.50
Torque Tube to BellCrank Pushrod
Details
SITE NAVIGATION
RV10 Home
Category
# Logs
# Hours
All
273
519
Aileron Actuation
5
12
Ailerons
1
2
Auto Pilot
3
5
Baggage Area
1
1
Baggage Door
2
4
Elevator
32
79
Empennage Attach
17
24
Fairings
11
16
Flaps
2
0
Fuselage
46
69
Horizontal Stabilize
23
56
Inventory
1
3
Miscellaneous
3
3
Rudder
13
28
Rudder and Brake Ped
4
9
Tailcone
44
79
Tailcone Attach
4
14
Vertical Stabilizer
12
22
Wing Tips
7
19
Wings
29
56
Wiring
13
18
Copyright © 2001-2024 Matronics. All Rights Reserved.