Powered By Kitlog Pro v2.0
Ivans RV 10
RV10
Horizontal Stabilize
Work Logs Found:
23
Category Work Time:
56 Hours
Date
Hours
Work Log Summary
Details
04-23-2007
1.80
riveting rear spar assembly
Details
04-22-2007
4.00
Finishing riveting
Details
04-20-2007
3.00
Rivet skins to inspar ribs
Details
04-16-2007
2.00
Rivet Skins
Details
04-14-2007
1.00
Last 2 Inspar Ribs Riveted.
Details
04-12-2007
1.00
Front Spar/ Rib Assembly
Details
04-11-2007
2.00
Nose Rib Assembly
Details
04-10-2007
2.50
Riveting the Inspar Ribs to the Front Spar
Details
04-09-2007
1.00
Rivet Inspar Ribs to Stringers
Details
04-09-2007
2.00
Countersinking Front and Rear Spar Flanges.
Details
04-08-2007
1.00
Dimpling
Details
04-04-2007
1.00
Dimpling
Details
04-03-2007
2.00
Dimpling HS
Details
04-01-2007
4.00
Deburring HS assembly
Details
03-31-2007
2.00
Final drilling Horizontal Stabilizer assembly.
Details
03-16-2007
3.00
Stringer Assembly and Rear Spar
Details
03-12-2007
1.50
Nose Ribs to Skins
Details
03-11-2007
6.00
Preparing Inspar Ribs and Nose Ribs
Details
03-09-2007
2.00
Riveting Front Spar Doubler and Trimming Ribs
Details
03-08-2007
4.00
Front Spar and Doubler
Details
03-07-2007
2.50
Front Spar Caps and Stringers
Details
03-05-2007
2.50
Front Spar Attachment Brackets
Details
03-04-2007
4.30
Rear Spar Assembly
Details
SITE NAVIGATION
RV10 Home
Category
# Logs
# Hours
All
273
519
Aileron Actuation
5
12
Ailerons
1
2
Auto Pilot
3
5
Baggage Area
1
1
Baggage Door
2
4
Elevator
32
79
Empennage Attach
17
24
Fairings
11
16
Flaps
2
0
Fuselage
46
69
Horizontal Stabilize
23
56
Inventory
1
3
Miscellaneous
3
3
Rudder
13
28
Rudder and Brake Ped
4
9
Tailcone
44
79
Tailcone Attach
4
14
Vertical Stabilizer
12
22
Wing Tips
7
19
Wings
29
56
Wiring
13
18
Copyright © 2001-2024 Matronics. All Rights Reserved.