Electrical
Work Logs Found:
129
Category Work Time:
414 Hours
Date
Hours
Work Log Summary
Details
03-07-2012
2.25
Wired F804 Cap lights
Details
03-04-2012
2.25
Re-installed CB and Inst Panels
Details
03-03-2012
1.50
Battery hold down strap
Details
02-08-2012
0.75
Part 2 Wrapped some wire bundles
Details
02-07-2012
1.25
Part 2 Wire bundle tying
Details
02-02-2012
1.75
2. More wire tying
Details
02-01-2012
1.50
1. Secured rear stick cable
Details
07-16-2011
3.75
1. Fwd Baggage conduit
Details
04-22-2011
4.00
Installed shunt and ANL
Details
04-18-2011
1.00
Lace tied wires
Details
04-14-2011
1.75
Hooked up fuel boost pump wires
Details
03-27-2011
1.00
Part 2: Front power outlet
Details
03-19-2011
4.50
E-bus feed diode and relay
Details
03-18-2011
3.00
Hot Battery Bus items
Details
01-09-2011
4.00
Start Arm decal and tested circuits
Details
01-08-2011
2.50
Terminated more CB wires
Details
01-07-2011
3.00
Terminated CB wires
Details
01-05-2011
3.00
Organized wires behind CB panel
Details
01-04-2011
4.25
Completed (R) console connections
Details
01-02-2011
5.50
Molex connection to right console
Details
01-01-2011
1.75
Front LED side lights
Details
12-31-2010
2.25
Soldered wire to LED lights
Details
12-30-2010
2.50
Pulled wires for Alt Field and IGN
Details
12-29-2010
1.25
Finished label plate
Details
12-28-2010
3.25
Re-painted CB panel
Details
12-27-2010
2.50
Made Bracket for standoffs
Details
12-22-2010
3.75
CB panel fit
Details
12-19-2010
6.25
Right Console Molex connnections
Details
12-18-2010
5.50
Re-layed out CBs
Details
12-17-2010
3.25
Continued to wire (R) Console
Details
12-16-2010
1.50
Molex connection on (R) console
Details
12-15-2010
2.75
Connected Main Bus Feed
Details
12-14-2010
1.50
Part 2: Wire organization
Details
12-13-2010
4.50
Spliced NAV/STRB, LAND and TAXI wires
Details
12-12-2010
6.75
Hooked up remianing wires under seat
Details
12-11-2010
2.50
Solder wires to switch
Details
12-06-2010
4.25
Installed standoff
Details
12-05-2010
1.75
Made stand off
Details
12-04-2010
3.00
Tested Aileron Trim
Details
11-30-2010
3.00
Tested Smart Start
Details
11-29-2010
1.25
Drilled battery tray to floor
Details
11-28-2010
6.25
WIre supports for E&E bay
Details
11-27-2010
5.25
E&E Bay wires
Details
11-26-2010
5.00
Connected Aileron Trim
Details
11-24-2010
1.25
Installed Smart Start Arm button
Details
11-22-2010
4.25
Wired sticks to terminal and tested
Details
11-21-2010
3.50
Stick wire arrangement
Details
11-20-2010
4.00
Wired servos to terminal
Details
11-18-2010
4.50
Terminal for A/P servo wires
Details
11-17-2010
3.00
Secured stick wires
Details
11-15-2010
5.00
Terminal/relay tray under front seat
Details
11-14-2010
7.25
Rear stick connector
Details
11-11-2010
1.00
Rear stick connector
Details
10-29-2010
1.25
Pitch servo wires
Details
10-28-2010
4.00
Pitch Servo
Details
10-27-2010
2.75
Made support for rear of radio stack
Details
10-26-2010
1.75
Panel fitting
Details
10-12-2010
2.25
Strobe sync wire
Details
10-08-2010
3.50
EMS harness fit and wire organization
Details
10-07-2010
2.50
Rear power outlet and seat heat
Details
10-06-2010
3.00
Left wire bundle Pitot AOA line route
Details
09-30-2010
2.50
Front cockpit LED lights
Details
07-15-2010
2.25
Riveted on Map light mount
Details
07-13-2010
1.25
Painted mount for Map Light
Details
07-12-2010
3.25
Part II - Map light mount
Details
07-02-2010
4.50
RCP LED ligths
Details
07-01-2010
4.00
Light in the rear baggage area
Details
06-29-2010
0.50
Installed LED stirps
Details
06-28-2010
3.75
Part II - Rear cockpit lighting
Details
05-30-2010
1.25
Cockpit lighting and Trim
Details
05-28-2010
3.50
Heated seat wires
Details
05-27-2010
1.50
Flap motor wire
Details
05-26-2010
5.00
Part 1-Connectors on antenna cables & A/P wires
Details
05-25-2010
0.75
Test fit new Dynon 10A EFIS
Details
05-24-2010
3.25
Left side wire bundle
Details
05-23-2010
4.00
More wire work!!!
Details
05-22-2010
7.25
Electrical - More wires, and redos
Details
05-21-2010
1.50
More Left side wire bundle
Details
05-20-2010
4.50
Left side wire bundle standoff
Details
04-27-2010
3.25
1. Wire route for instrument panel harness
Details
04-20-2010
1.25
Made bezel to hold ELT Control
Details
04-07-2010
3.50
Electical wires continued
Details
04-01-2010
4.00
Tested LED strip lights
Details
03-31-2010
2.25
Wired CBs to Molex
Details
03-31-2010
3.50
Touched up CB panel chips
Details
03-30-2010
4.50
New wires to console swtiches
Details
03-29-2010
3.25
Made bracket to hold Molex connector
Details
03-28-2010
3.00
Wired console switches to CBs
Details
03-27-2010
6.00
(R) console labels
Details
03-26-2010
5.00
(R) Console Switches
Details
03-25-2010
5.75
Wired Batt to Master Switch
Details
03-23-2010
3.00
Installed firewall pass thru
Details
11-30-2009
1.75
2. Safety Trim module
Details
11-28-2009
2.00
More wiring ideas
Details
11-27-2009
2.00
2. Instrument panel harness
Details
11-25-2009
3.75
1. Panel switches
Details
11-23-2009
1.00
Pitch Servo wire
Details
11-21-2009
3.75
Finished up wires to tail section
Details
11-20-2009
2.25
More switch layouts
Details
11-10-2009
2.75
Installed Batt Bus & Stby Reg
Details
11-01-2009
1.00
New connection between ANL and Relay
Details
10-29-2009
1.75
Painted first coat on instrument panel
Details
10-28-2009
1.75
Installed ANL holder, cut battery bolts
Details
10-26-2009
2.75
P-Mag push buttons
Details
10-26-2009
0.00
Lighted Pitot Heat Toggle
Details
10-25-2009
3.00
Moved ANL, set battery tray
Details
10-24-2009
2.75
Ammeter shunt and ANL
Details
10-23-2009
3.50
Diode to E-bus jumper
Details
10-22-2009
6.00
Caution lights
Details
10-21-2009
3.75
Connected big cables
Details
10-20-2009
5.25
Big wire to circuit breaker
Details
10-19-2009
4.25
Installed CBs and Bus bar
Details
10-18-2009
5.00
CB labels done
Details
10-17-2009
6.00
Made some CB Labels
Details
10-16-2009
4.00
CB Labels
Details
09-30-2009
2.50
Switch Template - (R) Console
Details
09-30-2009
3.00
Drilled CB Holes
Details
09-29-2009
9.50
Circuit breakers and doide
Details
09-25-2009
5.75
Mounted Relays
Details
09-23-2009
2.75
Worked on CB Layout - Installed ELT BNC connectors
Details
08-30-2009
2.00
More tail wires
Details
07-11-2009
5.50
Pitot connection & Securing wires
Details
07-10-2009
4.25
ELT antenna & more aft wiring
Details
07-08-2009
2.25
Removed aft battery cable
Details
07-04-2009
2.25
Wire Pitot Heat
Details
07-03-2009
4.50
Safety Trim system
Details
06-30-2009
5.00
Battery cable to the firewall
Details
06-27-2009
1.25
More battery cable analysis
Details
06-26-2009
2.00
Route battery cable to firewall NOT!
Details
SITE NAVIGATION
Contact Builder
RV8A Home
Category
# Logs
# Hours
All
953
2965
Avionics
57
153
Builder tips
7
3
Canopy
49
102
Cowl
37
104
Dynon Autopilot
6
5
Education Classes
7
10
Education/Practice
7
10
Electrical
129
414
Empennage
90
291
Engine
102
339
Final assembly
60
319
First Flight
2
Fuselage
255
764
Interior
1
2
Kit Components
9
29
Miscellaneous
5
6
None
5
Painting
7
34
Painting/Polishing
7
34
Windscreen
24
64
Wings
83
268
Workshop
4
14