KitLog pro

Powered By Kitlog Pro v2.0

Marks Rans Courier Project
Work Logs Found: 10
Category Work Time: 35 Hours
 Date
Hours
Work Log Summary

Details

 07-08-2009
2.00
Install doors

 07-07-2009
3.00
Rivet trim, install top trim etc
Details

 07-05-2009
2.00
Door latch hardware on right door, other misc
Details

 07-04-2009
5.00
Paint, install door latch hardware etc
Details
       

 07-03-2009
5.00
Trim painting, assemble second door, stripe layout
Details

 07-02-2009
5.00
Paint trim, fit left door lexan, install lexan & t
Details
       

 07-01-2009
3.00
Paint trim pieces
Details

 06-30-2009
2.50
Fitting right door lexan, start left door trim sti

 06-28-2009
6.00
Assembly of the right door
Details
       

 06-26-2009
1.50
Assembly of door components
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.