Conrads X-10 Build Log
Work Logs Found: 7
Category Work Time: 22 Hours
 Date
Hours
Work Log Summary

Details

 11-06-2011
8.00
Empennage Gap Cover on the tail of the aircraft
Details
       

 09-26-2008
1.00
EMPENNAGE / TAILCONE is COMPLETE !!!!!
Details
     

 09-25-2008
2.00
Empennage Fairing 12-4, VS-1009 Vertical Stabilize
Details

 09-22-2008
4.00
Empennage Attachment 12-3. Steps 5 to 12
Details

 09-21-2008
0.50
-1001 Rudder Bottom Fairing to the bottom of the R
Details

 09-20-2008
2.00
Section 12-3.Step 4 to 9
Details
       

 09-18-2008
4.00
I attached the E-912 Elevator Tip Fairings to the
Details
       