Powered By Kitlog Pro v2.0
RVGator
RV8A
Engine
Work Logs Found:
102
Category Work Time:
339 Hours
Date
Hours
Work Log Summary
Details
11-27-2012
5.75
Trouble shoot fuel system
Details
11-27-2012
2.25
Set Alt Belt Tension
Details
10-31-2012
2.75
Baffle seal fitting
Details
10-28-2012
2.50
Installed oil cooler
Details
10-27-2012
10.00
Install exhasut and sensor wires
Details
10-26-2012
6.50
Baffle threaded rods
Details
10-25-2012
3.75
GPS Shelf
Details
10-24-2012
6.50
Secure engine wires
Details
10-23-2012
6.25
Right side plug wires
Details
10-22-2012
4.50
Spark Plug wires/Sump heater
Details
10-21-2012
4.50
Purge valve cable
Details
10-20-2012
2.50
Drilled EGT hole in exhaust
Details
10-16-2012
5.75
Finished FAB
Details
10-11-2012
4.25
Cut and glassed inlet scoop hole
Details
10-10-2012
4.75
Riveted FAB, prepared for some glass work
Details
10-09-2012
2.00
Paint FAB
Details
10-08-2012
3.75
Baffle clips and other stuff
Details
10-06-2012
6.00
Riveted front baffle
Details
10-05-2012
6.75
Front Baffle / Alt Air Door
Details
10-04-2012
8.00
Riveted L/R aft baffle
Details
10-03-2012
4.50
Baffle and FAB work
Details
10-02-2012
4.50
Primed baffle
Details
10-01-2012
5.00
Baffle prep for primer
Details
09-30-2012
2.75
FAB bottom fit
Details
09-29-2012
5.50
FAB fitting
Details
09-28-2012
5.50
Began FAB
Details
09-27-2012
6.25
Starter wire, Fuel Flow sensor
Details
09-26-2012
5.50
Alternator/Starter wires at firewall.
Details
09-25-2012
7.00
More engine connections
Details
09-24-2012
3.75
Wired P-Mag connections
Details
09-23-2012
3.00
Hooked up Man Pressure wires
Details
09-22-2012
6.75
Hooked up Fuel Press, Oil Press and Oil Temp
Details
09-21-2012
2.00
Purge return and cooling tube
Details
09-20-2012
5.00
Baffle Brace
Details
09-19-2012
7.50
Oil cooler corner brace
Details
09-18-2012
7.00
EAA Inpection, Oil cooler doubler
Details
09-17-2012
6.50
Cut upper baffle for gap
Details
09-16-2012
5.00
Marking the contour with upper cowl.
Details
09-15-2012
6.75
Corner gusset, trim top
Details
09-14-2012
7.00
Front center baffle
Details
09-13-2012
5.25
Baffle behind spinner
Details
09-12-2012
5.25
Front baffle work
Details
06-06-2012
2.50
Baffle 6 - Trim Rt aft baffle
Details
06-01-2012
1.25
Baffle 5 -Riveted Doubler
Details
05-29-2012
1.75
Baffle 4- Fit Rt-Aft
Details
05-28-2012
1.50
Baffle 3 - Rivted plates fit 707D bracket
Details
05-25-2012
0.75
Baffle 2 - Cyl 1,2,3 prep
Details
05-24-2012
2.00
Baffle 1 - Cly 4 Prep
Details
03-01-2012
1.75
Part 2. Fuel Flow sensor and line
Details
02-09-2012
3.75
Part 2 Hose and wire route test
Details
02-08-2012
0.50
Part 3 Power wires
Details
02-07-2012
1.50
Part 4 Starter wire route
Details
02-01-2012
1.00
2. Marked EGT probe positions
Details
07-17-2011
3.25
Fuel pump fittings
Details
07-16-2011
0.75
2. Engine sesnors
Details
07-14-2011
0.50
2, Tested purge valve cable
Details
07-10-2011
4.00
Cabin heat Cable
Details
07-09-2011
2.25
1. Purge valve cable anchor bracket
Details
07-08-2011
0.00
2. Oil filler tube move.
Details
07-08-2011
6.75
1. Heat valve cable support
Details
07-07-2011
0.00
2. Rear throttle and cable eyeballs
Details
07-07-2011
8.25
1. Mixture cable
Details
07-05-2011
2.50
Throttle cable hook-up
Details
07-02-2011
0.75
Fuel control bracket install
Details
07-01-2011
0.50
Throttle/Mixture brackets
Details
06-24-2011
1.50
Alternator
Details
06-23-2011
3.00
2. Exhaust hangers
Details
06-23-2011
1.25
1. Prop Cable
Details
06-22-2011
1.75
Cable lengths
Details
06-21-2011
1.75
Mixture pass thru
Details
06-20-2011
4.75
Throt/Mix brackets done
Details
06-13-2011
3.25
More mixture bracket work
Details
06-09-2011
3.00
Cut out mixture bracket
Details
06-08-2011
0.50
Took off prototype mixture bracket
Details
06-07-2011
2.25
Prototype mixture bracket
Details
06-03-2011
2.50
Settled on tail pipe position
Details
06-02-2011
1.25
Exhaust
Details
05-24-2011
0.75
Test fit Exhaust
Details
05-23-2011
3.00
2. Throttle cable anchor
Details
05-23-2011
4.00
1. Hung Engine Solo!
Details
05-22-2011
2.50
Engine hanging day NOT!
Details
05-21-2011
0.00
2. Prop Governor
Details
05-21-2011
5.25
1. Fuel Pump fitting / SD20 install
Details
05-20-2011
2.75
Made bracket for Manifold Pressure fitting
Details
05-19-2011
1.00
2. Engine mount bolts
Details
05-19-2011
2.00
1. Restrictor fitting
Details
05-18-2011
2.00
Upper wire pass through
Details
05-17-2011
3.00
Firewall items
Details
05-16-2011
3.50
Finding where things go.
Details
05-15-2011
2.25
More test fitting
Details
05-09-2011
0.75
Removed govenor to ship back!
Details
05-08-2011
2.75
Re-installed OFA
Details
05-08-2011
2.00
Prop Governor Bracket
Details
05-02-2011
1.00
Removed OFA spacer
Details
04-30-2011
0.00
Set up for engine install work
Details
11-12-2010
0.00
Put engine on stand
Details
11-11-2010
2.75
Part 1: Installed Prop Gov. and Oil Temp Sensor
Details
03-24-2010
4.00
Install Engine Mount
Details
11-24-2009
0.00
1. Propeller Delivered
Details
10-01-2009
1.25
Installed Dehydrator plugs
Details
07-01-2009
1.50
Engine has arrived
Details
06-23-2009
0.00
Engine is shipping
Details
SITE NAVIGATION
Contact Builder
RV8A Home
Category
# Logs
# Hours
All
953
2965
Avionics
57
153
Builder tips
7
3
Canopy
49
102
Cowl
37
104
Dynon Autopilot
6
5
Education Classes
7
10
Education/Practice
7
10
Electrical
129
414
Empennage
90
291
Engine
102
339
Final assembly
60
319
First Flight
2
Fuselage
255
764
Interior
1
2
Kit Components
9
29
Miscellaneous
5
6
None
5
Painting
7
34
Painting/Polishing
7
34
Windscreen
24
64
Wings
83
268
Workshop
4
14
Copyright © 2001-2024 Matronics. All Rights Reserved.