KitLog pro

Powered By Kitlog Pro v2.0

Vans RV-8 G-JBTR
Work Logs Found: 32
Category Work Time: 280 Hours
 Date
Hours
Work Log Summary

Details

 05-26-2012
280.00
Oil Breather
Details
     

 05-05-2012
0.00
P-Mags for Lycomings
Details
       

 04-27-2012
0.00
Temperature Labels
Details
       

 09-16-2011
0.00
Inverted Oil 3 - Oil Filter Chafe
Details
       

 09-14-2011
0.00
FAB 4 - Complete
Details
       

 09-09-2011
0.00
Oil Cooler 3 - Shutter cable routing
Details
       

 09-09-2011
0.00
Oil Cooler 2 - Shutter Binding and Brace
Details
       

 09-09-2011
0.00
Oil Cooler 1 - Shutter
Details
       

 09-09-2011
0.00
FAB 3 - Alternate Air
Details
       

 08-16-2011
0.00
Baffles 6 - Rubber Seals 2
Details
       

 08-15-2011
0.00
Baffles 5 - Rubber Seals 1
Details
       

 08-03-2011
0.00
Baffles 4 - Trimming to Top Cowl
Details
       

 07-28-2011
0.00
FAB 2 - Alternator Interference
Details
       

 07-27-2011
0.00
Filtered Air Box (FAB) 1 - Mounting Holes
Details
       

 07-22-2011
0.00
Baffles 3 - Lower Cowl/Forward Baffle Fit
Details

 07-20-2011
0.00
Baffles 2 - Aft Centre Support Bracket CB-707D
Details
       

 07-18-2011
0.00
Baffles 1 - Prep and Plans
Details

 02-17-2011
0.00
Fuel Flow Sender 2
Details
       

 02-16-2011
0.00
Fuel Flow Sender 1
Details
       

 01-23-2011
0.00
Heat Muff 3
Details
       

 01-23-2011
0.00
Heat Muff 2
Details
       

 01-23-2011
0.00
Heat Muff 1
Details
       

 01-03-2011
0.00
Throttle Bracket
Details
       

 12-06-2010
0.00
Mixture Bracket 2
Details
       

 12-03-2010
0.00
Mixture Bracket 1
Details
       

 12-02-2010
0.00
Engine Fitting Sequence
Details
     

 12-01-2010
0.00
Engine Mounting
Details
       

 11-26-2010
0.00
Inverted Oil 2
Details
       

 11-26-2010
0.00
Inverted Oil 1
Details
       

 11-25-2010
0.00
Firewall Layout and Prep for Engine Mount
Details
       

 11-23-2010
0.00
Battery Tray
Details
       

 06-22-2009
0.00
Fuel System
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.