KitLog pro

Powered By Kitlog Pro v2.0

Jims Web Site
Work Logs Found: 170
Category Work Time: 464 Hours
 Date
Hours
Work Log Summary

Details

 03-20-2011
2.00
Mount trim motor in elevator
Details
       

 03-07-2011
2.00
Cut hole for connector
Details
       

 03-05-2011
1.50
Build pitch trim and autopilot harness
Details
     

 02-24-2011
4.00
Draw wiring diagrams
Details
       

 02-21-2011
2.00
Remove VS and drill for trim wires
Details
       

 02-05-2011
3.50
Fix VS and rudder
Details
       

 01-30-2011
1.50
Mock up VS
Details
       

 01-30-2011
3.00
Install push rods
Details
       

 01-27-2011
1.00
Mount elevators to HS
Details
       

 01-24-2011
1.50
Drill HS to fuselage.
Details
       

 01-20-2011
1.00
Set up horizontal stabilizer
Details

 01-17-2011
1.50
Fabricate fuel vent pipes.
Details
       

 01-09-2011
2.50
Install fuel lines to selector valve
Details
       

 01-06-2011
1.50
Mount fuel tank brackets
Details
       

 12-16-2010
2.50
set flap travel and ailerons
Details
       

 12-06-2010
2.50
Finish flap holes
Details
       

 11-29-2010
2.00
Instal flaps
Details
       

 11-28-2010
3.00
Install ailerons and control rods
Details
       

 11-22-2010
1.50
Install left aileron push tube
Details

 11-18-2010
2.00
Drill lower skin to fuselage holes.
Details
       

 11-15-2010
2.00
Drill rear spar holes
Details
       

 11-08-2010
2.00
Recheck wings and mark rear spar
Details
       

 10-25-2010
2.50
Square wings, ck triangulation, angle of incidence
Details

 10-17-2010
2.50
Install the right wing
Details
       

 10-16-2010
1.50
Mount pitot hose
Details
       

 10-14-2010
2.50
Drill for pitot line through rib and fuselage
Details
       

 10-11-2010
1.00
Mount left wing to fuselage!!
Details
       

 10-10-2010
2.00
Modify pitot line in wing
Details

 10-04-2010
3.00
Unpack lt wing
Details
       

 09-26-2010
3.00
Fab static line clamps and mount
Details
       

 09-23-2010
2.00
Drill holes for statis ports
Details
       

 09-20-2010
3.00
Level fuselage
Details
       

 09-13-2010
0.00
Move tools and parts
Details
       

 09-12-2010
0.00
Move fuselage
Details
       

 08-21-2010
2.00
fab fuel tank brackets
Details
     

 08-15-2010
5.00
fab elevator pushrods
Details
     

 07-16-2010
2.00
fab drift pins for wing assy
Details
     

 07-04-2010
3.00
more rear turtledeck
Details
       

 07-03-2010
3.00
Rear turtledeck work
Details
       

 06-13-2010
3.00
fab rear fuselage control covers
Details
       

 06-11-2010
3.00
Fab control cover
Details
       

 06-08-2010
1.50
Reassemble baggage panels
Details
       

 06-06-2010
3.00
Disassemble baggage panels
Details

 06-04-2010
1.00
Nutplates for flap bushing
Details
       

 05-29-2010
5.00
Begin flap control system
Details
     

 05-23-2010
2.00
Paint floor panels and assemble interior
Details
       

 05-21-2010
3.00
Fab F782D angles and prep F782A covers
Details
       

 05-14-2010
1.00
prep and paint fuel valve cover
Details
       

 05-12-2010
2.00
Prep heater shell
Details
       

 05-09-2010
2.00
prime and assemble seat back two
Details
       

 05-07-2010
2.00
Prime and assemble one seat back.
Details
       

 05-05-2010
2.00
Fab hinges, drill and debur, mock up
Details
       

 05-04-2010
1.50
Fabricate hinges
Details
     

 05-02-2010
1.50
fab top and bottom angle
Details
     

 05-01-2010
4.00
Cut holes in seat back plate
Details
     

 04-30-2010
2.00
Fab hinges
Details

 04-28-2010
1.50
Fab top and bottom angles
Details

 04-27-2010
2.00
Fab seat back angles
Details
     

 04-25-2010
4.00
Rivet hinges to floor and start seat backs
Details
     

 04-24-2010
4.00
Aft seat floors
Details
       

 04-21-2010
3.00
Prep baggage covers
Details
       

 04-18-2010
5.00
Finished the baggage bulkhead
Details
       

 04-17-2010
4.00
Baggage bulkhead
Details
       

 04-13-2010
1.50
Fab F707 angle
Details

 04-11-2010
2.00
Mount the autopilot pitch servo
Details
       

 04-11-2010
6.00
assemble aft skins
Details
       

 04-07-2010
2.00
Rivet F728 vertical rib
Details
       

 04-06-2010
3.00
Shoulder harness mounts, bellcrank fab
Details
       

 04-05-2010
2.50
F695 gussets, misc items
Details
       

 04-04-2010
6.00
fit canopy rails
Details
       

 04-03-2010
6.00
Misc details before back to plans
Details
       

 03-28-2010
6.00
assemble rear fuselage plate
Details
       

 03-27-2010
1.50
Prime spacers
Details
     

 03-26-2010
3.00
fab F-710C/F-711E/F-912D spacers
Details

 03-24-2010
2.00
Drill F-714 bulkhead to rear fuselage
Details
       

 03-22-2010
0.00
Same day, more leveling
Details
       

 03-21-2010
2.00
Level fuselage
Details
       

 03-15-2010
0.30
Part 3 More photos right side up
Details
       

 03-14-2010
0.20
Part 2 Rolling of the fuselage, milestone
Details
       

 03-14-2010
2.00
Part 1 Finish the hard rivets and flip the canoe!
Details
       

 03-13-2010
3.50
Rivet fuselage floor
Details
       

 03-09-2010
2.00
Rivet floor stiffiners
Details
       

 03-03-2010
2.00
Rivet firewall
Details
       

 02-23-2010
2.00
more side skin rivets
Details
       

 02-21-2010
2.00
Rivet side skins
Details
       

 02-20-2010
2.00
Begin rivet of center section and side skins
Details
       

 02-14-2010
2.00
join center section to tailcone
Details
       

 02-13-2010
6.00
Center section prep.
Details
       

 02-06-2010
3.00
Prep tailcone
Details
       

 02-03-2010
1.50
Prep 706B bulkhead
Details
       

 02-01-2010
1.50
prep longerons
Details
       

 01-31-2010
4.00
Prep lt side skin
Details
       

 01-30-2010
3.50
Prep right side skin
Details
       

 01-24-2010
3.00
Prep longerons
Details

 01-23-2010
3.00
Prep armrests and bulkheads
Details
       

 01-22-2010
1.00
Drill fuel vent and fuel line through skin.
Details

 01-19-2010
2.00
Debur and dimple forward lower skin.
Details
     

 01-16-2010
4.00
Prep baggage parts
Details
     

 01-10-2010
2.00
Mock up baggage area and drill
Details

 01-09-2010
3.00
Fabricate front floor stiffiners
Details
       

 12-27-2009
2.00
drill pedals to the cockpit.
Details

 12-26-2009
2.00
Assemble pedals
Details
       

 12-25-2009
3.00
Pedal assembly
Details

 12-23-2009
1.00
assembled F9101 plates
Details
       

 12-20-2009
6.00
Drill braces to fuse, drill skin to longerons
Details
       

 12-15-2009
2.00
Fab F996 B and C brackets, mount F9101 to fuse.
Details
       

 12-13-2009
3.00
Drill F684 gussets, drill skin to longerons
Details
     

 12-12-2009
2.50
Fab F684 gussets and drill longerons for bolts
Details
       

 12-11-2009
1.00
Drill clips to longerons
Details

 12-08-2009
1.00
Drill F719 longerons to skin.
Details
       

 12-07-2009
3.00
Fab F917 lower longerons, fab clips
Details

 12-06-2009
1.50
mount F713 aux longerons and drill
Details
       

 12-04-2009
1.00
Final drill firewall to longerons
Details
       

 12-02-2009
3.00
Install bottom ft skin, final position of firewall
Details
       

 12-01-2009
3.00
Fab F-904L straps, mock up firewall
Details
       

 11-28-2009
6.00
Drill the longerons and armrests
Details
       

 11-27-2009
5.00
Install front side skins
Details
       

 11-26-2009
1.00
Mount center section to tailcone
Details
       

 11-22-2009
6.00
install longerons into tailcone
Details
       

 11-21-2009
8.00
Prep floor parts, install 915 ribs, install floor
Details
       

 11-17-2009
2.00
Finish bottom skin
Details
     

 11-15-2009
2.00
Rivet bottom skin to ribs
Details
       

 11-14-2009
2.00
Install control stick, mock up
Details

 11-12-2009
2.00
Install seatbelt crotch strap parts
Details
       

 11-11-2009
4.00
Prime bottom skin, reassemble
Details
       

 11-10-2009
8.00
Prep all parts, debur, dimple, prime
Details
       

 11-03-2009
3.00
Fit the wing bulkheads
Details
       

 11-02-2009
2.00
Fit the corner ribs to the bottom skin
Details
       

 11-01-2009
4.00
Matchdrill bulkheads and bottom skin
Details
     

 10-31-2009
5.00
Install nutplates on ribs and assemble centersecti
Details
       

 10-29-2009
3.00
Modify seat ribs
Details
       

 10-21-2009
2.00
Finish the tailcone!
Details
       

 10-20-2009
2.00
Rivet side skins to stringers
Details
     

 10-19-2009
3.00
Rivet side skins to bottom skin
Details
     

 10-16-2009
2.00
Rivet tailcone and start the bottom of side skins
Details
       

 10-15-2009
2.00
Rivet bulkheads to bottom skin, install side skins
Details
       

 10-14-2009
6.00
Debur and dimple side skins
Details
       

 10-13-2009
4.00
Debur, dimple, prime bottom skin, bulkheads, strin
Details
     

 10-11-2009
1.00
Disassemble fuselage tail
Details

 10-10-2009
4.00
Match drill fuselage tail
Details
       

 10-07-2009
3.00
mock up fuselage tail
Details
       

 10-06-2009
5.00
Mock up rear bulkheads and tailwheel spring
Details
       

 10-01-2009
2.50
Fab J-stringers
Details

 09-29-2009
3.00
Bend longerons
Details
       

 09-15-2009
0.00
F-710 and F-711 bulkhead
Details
       

 09-15-2009
6.00
Bulkhead F-710 and F-711 part 2
Details
       

 09-14-2009
1.00
Bulkhead F-709
Details
     

 09-13-2009
3.50
Bulkheads F-707 and F-708
Details
       

 09-12-2009
7.00
F-706 bulkhead, more
Details
       

 09-12-2009
0.00
F-706 bulkhead
Details
       

 09-11-2009
1.00
Finish the flap bearings
Details
       

 09-10-2009
1.00
Flap bearing block
Details
       

 09-09-2009
3.00
Bulkhead F-705 top channel
Details
       

 09-08-2009
2.50
Rivet doubler for seat belt anchors
Details
       

 09-07-2009
6.00
Fab the top of the F-705 structure
Details

 09-07-2009
4.00
Drill the anchors and prime.
Details
       

 09-02-2009
5.00
Begin the next station F-705
Details

 09-01-2009
3.00
Control column assy
Details
       

 08-30-2009
8.00
Bulkhead brackets
Details
       

 08-29-2009
3.00
Match drill, debur and rivet F904C & D
Details
       

 08-28-2009
1.00
Drill holes for bushings
Details
       

 08-26-2009
2.00
Wing bulkhead mockup
Details

 08-25-2009
3.00
Rivet firewall, done!
Details
       

 08-25-2009
5.00
Dimple firewall, prime, final prep
Details
       

 08-23-2009
7.00
Match drill firewall
Details
       

 08-22-2009
4.00
Mock up firewall
Details
       

 08-21-2009
1.50
Fabricate F-601J brackets
Details
       

 08-19-2009
3.00
Inventory parts
Details
       

 08-18-2009
0.00
Receive fuselage from ABF
Details
       

 06-23-2009
0.00
Order Fuselage
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.