RV-A8
Electrical System
Work Logs Found:
157
Category Work Time:
311 Hours
Date
Hours
Work Log Summary
Details
09-17-2014
1.00
Re-Installed the Vertical Power Control Unit
Details
01-21-2014
1.50
Fixed Right Console Switches Problem
Details
01-20-2014
1.00
Troubleshooting Improper Console Switch Function
Details
01-16-2014
0.50
Rewired the Prop Controller Connector
Details
01-02-2014
1.00
Installed Wiring Conduit to Cabin Interior Bundles
Details
08-31-2012
0.75
Adjusted the Heights of the Starboard Switch Panel
Details
08-29-2012
2.00
Laced Forward Baggage Compartment Wires
Details
06-19-2012
2.00
Re-installed Battery Tray and Connected Cables
Details
06-09-2012
1.50
Re-connected Aft Electrical Wiring to VP CU
Details
06-04-2012
2.00
Removed the Battery Tray and Secured Cables
Details
06-01-2012
1.00
Installed Repaired Verical Power Control Unit
Details
05-19-2012
1.00
Installed Molex MX-150L Socket in Lt Mid Fuselage
Details
05-18-2012
1.00
Installed 3 Position Molex Socket Rt Mid Fuselage
Details
05-17-2012
1.50
Installed a Molex MX-150L Socket in Fuselage Wall
Details
03-25-2012
2.00
Installed the Blue Sea Sockets and Plugs
Details
03-25-2012
0.00
External View of the Charger Connections
Details
03-24-2012
3.00
Fabricated Doublers for the External Charger Plugs
Details
02-09-2012
2.50
Installed Two Engine Grounds to the Firewall
Details
02-09-2012
0.50
Attached Fat Ground to the Firewall
Details
02-08-2012
1.00
Attached the Fat Ground to the Firewall
Details
02-07-2012
4.00
Attached Avionic Grounds and Fuel Pumps' Ground
Details
02-06-2012
2.00
Ran the Fuel Pump Grounds to the Forrest of Tabs
Details
02-05-2012
2.50
Secured Ground Wires in Forward Cabin
Details
01-09-2012
1.50
Made a Copper Bar to Attach Starter Relay to ANL
Details
01-03-2012
0.25
Attached the Forrest of Tabs to the Firewall
Details
12-28-2011
2.00
Riveted Fat Wire Firewall Pass Through to Firewall
Details
12-27-2011
0.50
Drilled Holes for the Fat Wire Firewall Pass Throu
Details
09-04-2011
1.00
Ran Cowl Flap Power Wire to Throttle Area
Details
08-28-2011
1.00
Installed a Stud Grounding Block on the Brace
Details
08-23-2011
1.00
Connected Cowl Flap Wire to the Autopilot Terminal
Details
08-20-2011
2.00
Ran Panel Dimmer Source Grounds to the Terminal
Details
08-02-2011
0.50
Moved the avionics terminal bar down 3/4".
Details
06-11-2011
2.00
Wired the Engine Critical Power CommonTerminal
Details
04-02-2011
1.50
Checked and Corrected Heater Fan Wiring
Details
03-09-2011
2.00
Linked the Forward Grounds Together
Details
03-08-2011
2.00
Re-routed Starter Cable Through Floor Rib
Details
02-20-2011
1.00
Wired the Heater Fan to the Switch
Details
01-16-2011
4.00
Used Hangers to Finish the Switch Panel Wiring
Details
01-15-2011
6.00
Wired the Switch Panel on the Fwd Rt Side
Details
01-03-2011
2.00
Re-routed switch panel wires from the panel
Details
01-02-2011
3.00
Wired the Switches of the Rt Forward Switch Panel
Details
12-17-2010
1.50
Made Hangers for the Bundles in Aft Lt Mid Section
Details
12-12-2010
1.50
Installed Wiring Hangers in the Aft Section
Details
12-11-2010
2.00
Installed Split Conduit on Aft Section Wire Bundle
Details
12-10-2010
2.00
Drilled a Tail Light Hole Through the Aft Bulkhead
Details
11-18-2010
1.50
Re-routed #6 Cable to the Aft Power Terminal
Details
11-13-2010
3.00
Secured Wires of the Left Side
Details
11-13-2010
4.00
Laced the Wires of the Left Side
Details
11-12-2010
3.00
Re-laced the Right Side Wires that Needed It
Details
11-12-2010
1.00
Changed the Heater Fan Switch Installation
Details
11-08-2010
1.50
Organized Forward Right Cabin Wires
Details
11-07-2010
2.00
Organized the Wires/Cables of Rt Fwd Cabin Floor
Details
11-07-2010
1.50
Installed a Backup Fuselage Ground Wire
Details
11-06-2010
3.00
Installed Switches in the Fwd Right Switch Panel
Details
11-04-2010
2.50
Ran Battery Backup Wires From the Right Aft Side
Details
08-23-2010
2.00
Installed the Light Assembly in the Left Tip
Details
08-21-2010
1.00
Fitted the Light Assembly to the Right Tip
Details
08-20-2010
5.00
Worked on the Installation of the Tip Lights
Details
08-18-2010
1.50
Started the Installation of the Tip Lights
Details
05-10-2010
0.50
Re-Installed the Heater
Details
05-08-2010
2.00
Re-wired heater with Molex Pins and Plugs
Details
04-27-2010
1.00
Powered up the Vertical Power System
Details
04-20-2010
1.50
Re- laced wires of the CU that were removed
Details
04-19-2010
0.25
Tested VP CU Serial Cables with the buzzer
04-18-2010
4.60
Tested VP CU Plugs/Pins for correct wiring
Details
04-17-2010
1.00
Assembled a circuit tester for the VP wiring
Details
04-02-2010
1.00
Secured ground cable in the mid-cabin
Details
03-28-2010
2.00
Installled Conduit under the Front Throttle Mount
Details
03-23-2010
1.00
Laced wires of the Left Mid Fuselage Floor
Details
03-21-2010
2.00
Laced the wires along the right side, aft to front
Details
03-21-2010
1.00
Laced the wires along the right side, aft to front
Details
03-20-2010
1.50
Fixed wiring conflict with Flap Position Sensor
Details
03-19-2010
1.00
Made #8 Power Cable to Aft Terminal Block
Details
03-19-2010
1.50
Finished J-7 plug
Details
03-18-2010
2.00
Finished wiring the J-7 Plug
Details
03-16-2010
1.00
Put pins on the J-7 Pins 31, 32, 34 and 35
Details
03-15-2010
1.00
Ran another power wire for the cowl flap control
Details
03-02-2010
1.50
Started wiring the J-7 plug on the CU
Details
02-28-2010
4.00
Ran spare switch wires from CU to behind panel
Details
02-26-2010
1.00
Connected Flap Position Sensor wires to Cable
Details
02-25-2010
1.50
Laced wires around the VP CU
Details
02-24-2010
0.75
Ran Flap Position Sensor Cable to the VP CU
Details
02-21-2010
7.00
Laces starter cable wires and CU wires
Details
02-20-2010
4.00
Finished wiring grips' terminal
Details
02-16-2010
1.00
Wired Servo outputs from the terminal strip
Details
02-13-2010
0.25
Ran Front Stick Ground to Aft Ground Terminal
Details
02-13-2010
3.75
Installed the Grips terminal strip
Details
02-09-2010
2.50
Re-wired the Front/Aft grips at the terminal strip
Details
02-08-2010
8.00
Wired the Front and Aft Grips together
Details
02-07-2010
2.00
Mounted the stick grips' terminal strip
Details
02-06-2010
1.50
Connected a 12 and 6 terminal strips together
Details
02-03-2010
1.50
Ran Control Sticks' cable aft to VP CU
Details
01-31-2010
6.00
Wired the Aft Stick Grip
Details
01-30-2010
0.00
Ring used to guide wires around the grip boss
Details
01-30-2010
10.00
Installed Infinity grip on Front Stick
Details
01-26-2010
1.00
Ran 14 ga seat heater wire from Fused terminal
Details
01-21-2010
1.50
Drilled mount and added Platenuts for Aft Terminal
Details
01-17-2010
3.00
Fabricated a mount for the Aft Fused Terminal
Details
01-17-2010
1.00
Crimped pins on Switch Panel plug wires
Details
01-04-2010
1.00
Ran Remote Starter Switch wire from VP CU
Details
01-01-2010
3.50
Ran the E-Bus Power for the VP CU
Details
01-01-2010
0.50
Ran Ground Wires from VP CU
Details
12-30-2009
2.00
Made cables for the Aft Ground Terminal Block
Details
12-28-2009
2.50
Fabrication/Installation Aft Grounding Block Mount
Details
12-20-2009
2.00
Made Cables from Contactor to Bus Block
Details
12-16-2009
1.00
Fabricated/Installed the Bus Block Mount
Details
12-16-2009
1.00
Fabricated/Installed the Bus Block Mount
Details
12-15-2009
2.00
Bundled forward cabin wires
Details
12-12-2009
3.50
Started bundling the VP CU wires
Details
12-09-2009
1.50
Put shellbacks on the CU serial cables
Details
12-06-2009
1.00
Running VP CU wires
Details
12-06-2009
1.00
Running VP CU wires
Details
12-06-2009
1.00
Ran wires for the J-4 and J-5 plugs
Details
12-05-2009
3.50
Ran wires from the J-3 and J-6 VP CU plugs
Details
12-03-2009
1.00
Electrical planning
Details
12-01-2009
1.00
Finished wiring VP CU plugs
Details
11-28-2009
1.75
Put d-sub connector on the aft SP cable
Details
11-25-2009
2.00
Put d-sub connector on the aft end of the DU Cable
Details
11-22-2009
1.00
Ran wires from VP CU to Flap Motor
Details
11-22-2009
2.00
Ran wires from the Vertical Power Control Unit
Details
11-21-2009
1.50
Attached Adel clamp mounting angles to floor ribs
Details
11-19-2009
1.50
Ran wires for the Backup A & B switches
Details
11-11-2009
0.00
To Disney for 5 days
11-08-2009
3.00
Wired plugs of the VP CU
11-07-2009
3.00
Continued to make VP CU Bundles
Details
11-04-2009
1.50
Made wires for a Vertical Power Plug
Details
10-29-2009
3.00
Made a new #6 cable for run from Battery to VP
Details
10-28-2009
2.50
Adjusted Starter cable run
Details
10-28-2009
1.00
Added Terminal to Starter Cable at Contactor
Details
10-26-2009
2.00
Called Van's and talked to Joe about fat cable run
Details
10-25-2009
2.50
Ran the Essential Engine Aux wires up left side
Details
10-24-2009
4.00
Ran Engine Main (Always Hot) Wires up Left Side
Details
10-22-2009
1.50
Put miniature d-sub connector on the roll trim cab
Details
10-22-2009
1.50
Fashioned a miniature d-sub connector for roll tri
Details
10-20-2009
1.00
Tested d-sub pins on the trim 26ga wires
Details
10-07-2009
1.50
Wired most of the J-5 and started J-6 Plug
Details
10-06-2009
1.50
Finished J-4 plug except for Ground Wire
Details
10-05-2009
2.00
Wired the J-3 & 3/4 of J-4 VP Plugs
Details
10-04-2009
1.00
Crimped connectors to the flap power wires
Details
09-09-2009
2.00
Measured wiring lengths for the VP loadsheet
Details
08-16-2009
10.00
Started VP Load Planning Sheet
Details
07-04-2009
2.00
Put PIGD Push-on terminals on Aux Fuse Block
Details
07-03-2009
1.00
Ran a #6AWG Tefzel Cable to the VP CU
Details
07-01-2009
1.50
Ran #8AWG Tefzel cable to the Fuse Blocks
Details
06-29-2009
2.50
Mounted the Vertical Power Control Unit
Details
06-29-2009
1.00
Installed the fuse blocks in the aft fuselage
Details
06-25-2009
1.00
Mounted the battery tray into the fuselage
Details
06-22-2009
2.00
Made and attached 2 ground cables to the tray
Details
06-21-2009
4.00
Finished making positive cables for battery tray
Details
06-20-2009
3.00
Attached 200A ANL holders to platforms
Details
06-19-2009
1.50
Riveted the ANL fuse holder platform together
Details
06-17-2009
1.00
Re-painted the battery hold downs
Details
06-15-2009
2.50
Mounted battery contactors/Made ANL mounts
Details
06-14-2009
2.00
Mounted Battery Tray Ground Bus Bar
Details
06-13-2009
3.00
Made Spacers for the hold-down bolts
Details
06-12-2009
2.00
Riveted the K1000-426 nutplates on battery tray
Details
06-11-2009
1.00
Drilled 1/4" holes in the battery tray
Details
SITE NAVIGATION
Contact Builder
RV-14A Home
RV-A8 Home
Category
# Logs
# Hours
All
2277
6152
Aircraft Related
314
1432
Avionics
206
404
Brakes
11
18
Canopy
41
63
Cooling System
7
9
Cowl Flap
13
20
Cowling
146
354
Electrical System
157
311
Empennage
29
48
Engine
88
158
Fiberglass
148
316
Finishing Kit
27
76
First Flight Prep
4
1
Flight Control Syste
75
118
Flight Testing
18
20
Flights
6
7
Forward Baggage Comp
6
9
Forward Top Skin
24
36
Fuel System
84
155
Fuselage
344
812
Heating System
1
0
Inspection
5
5
Interior
24
20
Landing Gear
53
100
Lighting
17
27
Miscellaneous
8
5
None
14
6
Oxygen System
5
6
Painiting
11
28
Painting
11
28
Prop
22
27
Sensors
5
7
Testing
1
1
Ventilation
3
4
Windscreen
8
13
Wing Construction
27
76
Wings
314
1432