KitLog pro

Powered By Kitlog Pro v2.0

N144GP Lancair Super ES
Work Logs Found: 23
Category Work Time: 34 Hours
 Date
Hours
Work Log Summary

Details

 05-21-2012
0.75
install bracket for taxi light
       

 05-14-2012
6.25
wing tip lights
Details
       

 05-14-2012
2.50
troubleshoot and resolve alternator issues
Details
       

 05-07-2012
4.25
pull wires for recognition wing tip lights
Details
       

 12-26-2011
4.00
fix pitch servo wiring; test brakes & misc
Details
       

 12-11-2011
0.50
plan map light switch and drill hole in OH console
       

 08-28-2011
1.00
add conduit tubing to batt leads; attach covers
       

 08-15-2011
1.75
route charger wires to baggage area
       

 07-04-2011
1.25
install & wire map lights
Details
       

 07-04-2011
1.25
door seal pump wiring
       

 07-04-2011
0.00
add'l door seal pump pics
       

 07-04-2011
0.00

       

 06-13-2011
1.25
install tip lights & molex connectors
       

 06-05-2011
1.50
re-install 24v door seal pump
Details
       

 06-05-2011
0.00
door pump cont'd
Details
       

 05-22-2011
1.00
troubleshoot aux sense circuit
Details

 05-16-2011
1.50
troubleshoot AUX battery not showing on VP
Details
       

 05-15-2011
1.75
trace & rewire battery and contactor circuits
Details
       

 01-15-2011
0.25
wire 2 batteries in series; attach 24v battery min
Details
     

 08-02-2009
0.50
replaced RG58 coax in VS with RG400
Details
     

 06-28-2009
1.25
modify battery boxes for 2 Odyssey PC680 batteries
Details
       

 06-28-2009
0.00
additional battery box pics
     

 06-08-2009
1.00
reseach and plan battery and power grid placement
Details










Copyright © 2001-2025 Matronics. All Rights Reserved.