Date
|
Hours
|
Work Log Summary
|
Details
|
02-24-2017
|
1.00
|
Replaced std platenuts with movable ones
|
Details
|
|
|
02-08-2017
|
1.00
|
Lower flap skins to fuselage fit
|
Details
|
|
|
01-21-2017
|
2.00
|
More wing tip work
|
Details
|
|
|
01-18-2017
|
4.00
|
Adjusting the wing tips to align with ailerons
|
Details
|
|
|
12-06-2016
|
6.00
|
Flap rigging and actuation
|
Details
|
|
|
11-14-2016
|
4.00
|
Flap fairings and cut lines
|
Details
|
|
|
11-07-2016
|
6.00
|
Attached starboard wing
|
Details
|
|
|
11-06-2016
|
6.00
|
Attached port wing
|
Details
|
|
|
11-05-2016
|
6.00
|
Getting ready to attach wings
|
Details
|
|
|
11-02-2015
|
1.00
|
Sanded filler on wingtips
|
Details
|
|
|
09-13-2015
|
6.00
|
Stiifeners, elevator tube, ELT, battery, and patch
|
Details
|
|
|
09-12-2015
|
4.00
|
Fiberglass stiffeners and port lens
|
Details
|
|
|
09-09-2015
|
4.00
|
Wingtip light lenses
|
Details
|
|
|
09-07-2015
|
8.00
|
Starboard wingtip and light lens
|
Details
|
|
|
09-05-2015
|
7.00
|
Starboard flap and wingtip
|
Details
|
|
|
09-03-2015
|
5.00
|
Completed starboard wing bottom skins
|
Details
|
|
|
09-02-2015
|
6.00
|
Bottom skins riveted to starboard wing
|
Details
|
|
|
09-01-2015
|
4.00
|
Starboard aileron actuator & prep work
|
Details
|
|
|
08-31-2015
|
1.00
|
Prepared starbaord wing for bottom skin install
|
Details
|
|
|
08-31-2015
|
7.00
|
Continued work on port wingtip
|
Details
|
|
|
08-29-2015
|
6.00
|
More work on port wingtip
|
Details
|
|
|
08-27-2015
|
3.00
|
Began wingtip mounting - port wing
|
Details
|
|
|
08-26-2015
|
5.00
|
Aileron tube and hardware for right aileron
|
Details
|
|
|
08-25-2015
|
7.00
|
Attach flap on port wing
|
Details
|
|
|
08-24-2015
|
3.00
|
Riveting bottom outboard skin port wing - Part 3
|
Details
|
|
|
08-12-2015
|
2.00
|
Fabricate cradles for both wings
|
Details
|
|
|
08-11-2015
|
4.00
|
Riveting bottom outboard skin port wing - Part 1
|
Details
|
|
|
08-10-2015
|
4.00
|
Riveting bottom inboard skin port wing - Part 2
|
Details
|
|
|
08-09-2015
|
4.00
|
Riveting bottom inboard skin port wing - Part 1
|
Details
|
|
|
07-17-2015
|
3.00
|
Bottom skins port wing
|
Details
|
|
|
09-01-2014
|
0.50
|
NACA vent installation on starboard wing
|
Details
|
|
|
09-01-2014
|
5.00
|
Aileron alignment tool & port wing tip
|
Details
|
|
|
08-30-2014
|
4.00
|
Installation of NACA vent in wing
|
Details
|
|
|
08-11-2014
|
2.00
|
Determining best wing wiring route & termination
|
Details
|
|
|
08-10-2014
|
3.00
|
Nav/strobe light wiring & SafeAir pitot line
|
Details
|
|
|
08-09-2014
|
3.00
|
Continued wiring in wings
|
Details
|
|
|
08-07-2014
|
3.00
|
Running conduit & wiring in wings
|
Details
|
|
|
04-02-2012
|
5.00
|
Trimming tip lenses
|
Details
|
|
|
03-31-2012
|
3.00
|
Installed heat shield in wing tips
|
Details
|
|
|
03-27-2012
|
1.00
|
Marked wing tip lens for cut
|
Details
|
|
|
03-25-2012
|
6.00
|
Installed lights in starboard wing tip
|
Details
|
|
|
03-24-2012
|
6.00
|
Continued light installation port wing
|
Details
|
|
|
03-23-2012
|
3.00
|
Began installation of nav/position/strobe lights
|
Details
|
|
|
03-19-2012
|
0.00
|
Lights & flap positioning kit arrive
|
Details
|
|
|
08-28-2011
|
2.50
|
Replaced flap hinge
|
Details
|
|
|
05-23-2010
|
1.50
|
Missed rivets installed & fuel sender lead
|
Details
|
|
|
04-10-2010
|
4.00
|
Aileron brackets, gap seal, and flap brace
|
Details
|
|
|
04-07-2010
|
4.00
|
Finished riveting top skins & leak test tank
|
Details
|
|
|
04-06-2010
|
3.00
|
Begin riveting top skins
|
Details
|
|
|
04-01-2010
|
4.00
|
Starboard tank fitting and top skin preparation
|
Details
|
|
|
03-31-2010
|
4.00
|
Fitting of tank and top skins
|
Details
|
|
|
03-30-2010
|
5.00
|
Finished starboard tank
|
Details
|
|
|
03-29-2010
|
3.00
|
Installed tank Z brackets & sealed rivets
|
Details
|
|
|
03-27-2010
|
3.00
|
Riveting tank baffle
|
Details
|
|
|
03-25-2010
|
4.00
|
Vent line, fuel sender & rear baffle installation
|
Details
|
|
|
03-24-2010
|
0.50
|
Fuel tank avgas test
|
Details
|
|
|
03-23-2010
|
3.00
|
Dimpling wing skeleton and tank inspection
|
Details
|
|
|
03-22-2010
|
4.00
|
Installed the leading edge on the spar
|
Details
|
|
|
03-20-2010
|
1.50
|
Primed main spar flanges & installed few rivets
|
Details
|
|
|
03-19-2010
|
0.70
|
Completed the countersinking of main spar
|
Details
|
|
|
03-18-2010
|
3.00
|
Leading edge assembly & countersinking spar
|
Details
|
|
|
03-17-2010
|
3.00
|
Riveting leading edge starboard wing assembly
|
Details
|
|
|
03-16-2010
|
3.50
|
Leading edge assembly
|
Details
|
|
|
03-15-2010
|
7.50
|
Leading edge assembly & DRDT-2 repair
|
Details
|
|
|
03-12-2010
|
5.50
|
Tank rib fillets and rivet shop heads
|
Details
|
|
|
03-11-2010
|
3.50
|
Riveted tank end ribs
|
Details
|
|
|
03-10-2010
|
0.50
|
Some rivet repair & planning of a fix
|
Details
|
|
|
03-09-2010
|
3.50
|
Sealed and inserted tank end ribs
|
Details
|
|
|
03-08-2010
|
3.50
|
Finished riveting internal tank ribs (starboard)
|
Details
|
|
|
03-07-2010
|
8.00
|
Sealed end ribs & began riveting tank ribs
|
Details
|
|
|
03-06-2010
|
1.00
|
Prepared end rib components for sealing
|
Details
|
|
|
03-04-2010
|
3.00
|
Sealed and installed internal right tank ribs
|
Details
|
|
|
02-05-2010
|
3.50
|
Riveted tank stiffeners, fuel filler, and drain
|
Details
|
|
|
02-03-2010
|
3.00
|
Dimple bottom skins and install nutplates
|
Details
|
|
|
01-31-2010
|
3.00
|
Removal of plastic and scarfing joints
|
Details
|
|
|
01-27-2010
|
2.50
|
Dimpling tank parts and final test fit
|
Details
|
|
|
01-23-2010
|
3.00
|
Preparation of tank skin and aileron brackets
|
Details
|
|
|
01-21-2010
|
4.50
|
Begin fabrication of starboard fuel tank
|
Details
|
|
|
01-19-2010
|
4.00
|
Match drilling Z brackets and fit tank assembly
|
Details
|
|
|
01-18-2010
|
1.50
|
Install final Z bracket and test fit tank skin
|
Details
|
|
|
01-17-2010
|
4.00
|
Match drill leading edge & fabricate Z brackets
|
Details
|
|
|
01-12-2010
|
4.00
|
Leading edge assembly starboard wing
|
Details
|
|
|
01-09-2010
|
4.00
|
Match drilled wing skins
|
Details
|
|
|
01-08-2010
|
5.00
|
Riveted ribs to spars & clecoed wing skins
|
Details
|
|
|
01-04-2010
|
3.50
|
Match drilled wing skeleton
|
Details
|
|
|
01-03-2010
|
6.00
|
Initial assembly of starboard wing skeleton
|
Details
|
|
|
01-02-2010
|
0.50
|
Initial preparation of tank ribs (starboard side)
|
Details
|
|
|
12-31-2009
|
4.00
|
Initial preparation of ribs for starboard wing
|
Details
|
|
|
12-30-2009
|
4.50
|
Prepared starboard rear spar for assembly
|
Details
|
|
|
12-29-2009
|
4.00
|
Installed platenuts and fabricated tie down bracke
|
Details
|
|
|
12-28-2009
|
2.00
|
Finished countersinking main spar
|
Details
|
|
|
12-27-2009
|
2.50
|
Final rivets and flap brace
|
Details
|
|
|
12-27-2009
|
2.00
|
Begin countersinking main spar starboard wing
|
Details
|
|
|
12-26-2009
|
0.20
|
Mount starboard wing spar in jig
|
Details
|
|
|
12-26-2009
|
4.80
|
Installed aileron brackets and gap seal
|
Details
|
|
|
12-24-2009
|
0.10
|
Check wing twist
|
Details
|
|
|
12-23-2009
|
10.00
|
Built wing storage fixture
|
Details
|
|
|
12-19-2009
|
2.50
|
Finished riveting top skins port wing
|
Details
|
|
|
12-19-2009
|
1.50
|
Fabricated fixtures to hold wings on work bench
|
Details
|
|
|
12-17-2009
|
8.00
|
Riveting top skins on port wing
|
Details
|
|
|
12-15-2009
|
6.00
|
Begin riveting left wing top skins
|
Details
|
|
|
12-09-2009
|
7.00
|
Preparing to rivet top skins on left wing
|
Details
|
|
|
12-08-2009
|
0.10
|
Left tank pressure check (168 hrs)
|
Details
|
|
|
12-08-2009
|
2.00
|
Finished preparation of left wing top skins
|
Details
|
|
|
12-08-2009
|
4.00
|
Completed install of leading edge assembly
|
Details
|
|
|
12-05-2009
|
0.10
|
Checking tank pressure/leakage
|
Details
|
|
|
12-02-2009
|
0.10
|
Checking the balloon (leak test)
|
Details
|
|
|
12-01-2009
|
3.00
|
Prepare top skins for left wing
|
Details
|
|
|
12-01-2009
|
2.00
|
Leak testing left fuel tank
|
Details
|
|
|
11-30-2009
|
1.00
|
Sealed fuel tank (access plate & sender)
|
Details
|
|
|
11-30-2009
|
1.00
|
Installed leading edge assembly
|
Details
|
|
|
11-29-2009
|
3.00
|
Riveted left wing ribs to spars
|
Details
|
|
|
11-28-2009
|
2.50
|
Riveted leading edge assembly
|
Details
|
|
|
11-26-2009
|
3.50
|
Prepared leading edge assembly for riveting
|
Details
|
|
|
11-25-2009
|
2.00
|
Removing plastic on bottom wing skins
|
Details
|
|
|
11-24-2009
|
7.00
|
Finished left tank (baffle and Z brackets)
|
Details
|
|
|
11-23-2009
|
6.00
|
Miscellaneous wing tasks
|
Details
|
|
|
11-22-2009
|
4.00
|
Installed rear tank baffle with sealant
|
Details
|
|
|
11-20-2009
|
2.50
|
Prepared bottom skins (plastic removal & dimpling)
|
Details
|
|
|
11-20-2009
|
2.50
|
Joint splice strip and access plate fasteners
|
Details
|
|
|
11-19-2009
|
3.00
|
Some miscellaneous wing tasks
|
Details
|
|
|
11-18-2009
|
0.50
|
Reamed and fitted bellcrank bushing
|
Details
|
|
|
11-18-2009
|
2.50
|
Builder consultation and miscellaneous items
|
Details
|
|
|
11-16-2009
|
2.50
|
Sealing rivet shop heads inside left tank
|
Details
|
|
|
11-15-2009
|
2.00
|
Final tank skin rivets and shop head sealing
|
Details
|
|
|
11-14-2009
|
0.50
|
Fabricated and installed anti-foul bracket
|
Details
|
|
|
11-12-2009
|
3.00
|
Squeezed rivets on tank end ribs
|
Details
|
|
|
11-10-2009
|
3.00
|
Installed left tank end ribs
|
Details
|
|
|
11-09-2009
|
0.50
|
Sealed platenuts and vent line fitting
|
Details
|
|
|
11-09-2009
|
2.50
|
Completed prep of root rib
|
Details
|
|
|
11-07-2009
|
3.50
|
Continue riveting left fuel tank
|
Details
|
|
|
11-04-2009
|
3.00
|
Riveting internal tank ribs
|
Details
|
|
|
11-03-2009
|
3.50
|
Set inner five ribs in tank
|
Details
|
|
|
10-30-2009
|
3.50
|
Sealing left tank end rib components
|
Details
|
|
|
10-28-2009
|
2.00
|
Begin sealing left tank
|
Details
|
|
|
10-27-2009
|
2.50
|
Final prep of left tank skin
|
Details
|
|
|
10-01-2009
|
1.50
|
Fabricating fuel sender float arm and testing
|
Details
|
|
|
09-30-2009
|
1.00
|
Adjusted placement of tank reinforcement bracket
|
Details
|
|
|
09-29-2009
|
1.00
|
Completed the aileron to bellcrank rods
|
Details
|
|
|
09-28-2009
|
4.00
|
Aileron hinge brackets & push/pull tubes
|
Details
|
|
|
09-26-2009
|
3.50
|
Completed the left aileron and stored
|
Details
|
|
|
09-24-2009
|
7.00
|
Cleco ailerons for final riveting
|
Details
|
|
|
09-23-2009
|
8.00
|
Final preparation of parts for both ailerons
|
Details
|
|
|
09-22-2009
|
7.00
|
Initial assembly & match drilling of ailerons
|
Details
|
|
|
09-11-2009
|
6.80
|
Begin construction of ailerons
|
Details
|
|
|
09-10-2009
|
4.00
|
Completed left flap
|
Details
|
|
|
09-09-2009
|
2.00
|
Finished all riveting on right flap
|
Details
|
|
|
09-08-2009
|
7.00
|
Riveting of flaps
|
Details
|
|
|
09-02-2009
|
1.00
|
Fuel sender test jig
|
Details
|
|
|
08-27-2009
|
5.00
|
Continue work on right flap
|
Details
|
|
|
08-26-2009
|
8.00
|
Begin initial assembly of right flap
|
Details
|
|
|
08-25-2009
|
3.00
|
Prime parts and begin riveting left flap
|
Details
|
|
|
08-24-2009
|
5.00
|
Final preparation of left flap components
|
Details
|
|
|
08-22-2009
|
3.00
|
Left flap brackets, hinge & match drilling
|
Details
|
|
|
08-19-2009
|
3.00
|
Continued tank preparations
|
Details
|
|
|
08-19-2009
|
2.00
|
Begin Fabrication of Left Flap
|
Details
|
|
|
08-18-2009
|
4.00
|
Inverted fuel modifications
|
Details
|
|
|
08-17-2009
|
5.50
|
Left tank preparation
|
Details
|
|
|
08-16-2009
|
3.00
|
Match drilling tasks & prep of root rib left tank
|
Details
|
|
|
08-15-2009
|
3.00
|
Fabricated trap door & match drilled tank
|
Details
|
|
|
08-14-2009
|
0.00
|
Van's order arrived
|
Details
|
|
|
08-12-2009
|
2.00
|
Miscellaneous tank parts and tasks
|
Details
|
|
|
08-11-2009
|
2.00
|
Miscellaneous tank tasks
|
Details
|
|
|
08-10-2009
|
2.80
|
Fabrication of tank attach brackets
|
Details
|
|
|
08-08-2009
|
3.00
|
Preparing tank parts and paint test
|
Details
|
|
|
08-07-2009
|
4.50
|
Initial assembly of left tank
|
Details
|
|
|
08-05-2009
|
4.50
|
Fabricated stiffeners (tanks and ailerons)
|
Details
|
|
|
08-04-2009
|
3.50
|
Tank Z brackets and leading edge joint plate
|
Details
|
|
|
08-04-2009
|
2.00
|
Begin work on left fuel tank
|
Details
|
|
|
08-03-2009
|
3.50
|
Fabricated tank Z brackets
|
Details
|
|
|
08-02-2009
|
3.50
|
Match drilling main skins
|
Details
|
|
|
08-02-2009
|
3.00
|
Fitting the leading edge
|
Details
|
|
|
08-01-2009
|
2.00
|
Fabricated wing walk doubler & began skinning
|
Details
|
|
|
08-01-2009
|
1.00
|
Began fitting the main skins
|
Details
|
|
|
07-31-2009
|
1.00
|
Match drilled the ribs to the wing spars
|
Details
|
|
|
07-30-2009
|
2.50
|
Fabricated the tank/leading edge cradle
|
Details
|
|
|
07-29-2009
|
1.00
|
Mount main spar in jig and level
|
Details
|
|
|
07-28-2009
|
2.00
|
Rear wing spar assembly
|
Details
|
|
|
07-28-2009
|
5.00
|
Initial assembly of left wing
|
Details
|
|
|
07-27-2009
|
0.50
|
Primed rear spar components
|
Details
|
|
|
07-27-2009
|
4.00
|
Initial work on left rear spar
|
Details
|
|
|
07-26-2009
|
1.50
|
Riveted nutplates on left wing
|
Details
|
|
|
07-25-2009
|
3.00
|
Priming flanges and fabricating tie down assembly
|
Details
|
|
|
07-23-2009
|
2.00
|
Countersunk flanges for access plates
|
Details
|
|
|
07-22-2009
|
0.00
|
Platenut install (countersinking spar) - Page 3
|
Details
|
|
|
07-22-2009
|
0.00
|
Platenut install (countersinking spar) - Page 2
|
Details
|
|
|
07-22-2009
|
6.00
|
Platenut install (countersinking spar) - Page 1
|
Details
|
|
|
07-21-2009
|
4.00
|
Storing inventory and building wing jig
|
Details
|
|
|
07-20-2009
|
0.00
|
Rack for long material
|
Details
|
|
|
07-19-2009
|
8.00
|
Workbench storage drawers
|
Details
|
|
|
07-16-2009
|
6.00
|
Wing kit delivered
|
Details
|
|
|
05-19-2009
|
0.20
|
Ordered the standard wing kit
|
Details
|
|