KitLog pro

Powered By Kitlog Pro v2.0

Pete's RV-8 Web Site
Work Logs Found: 15
Category Work Time: 16 Hours
 Date
Hours
Work Log Summary

Details

 09-29-2010
0.50
New tool for fuselage preparation
Details
     

 08-22-2010
0.00
Skin rolling tools
Details
     

 08-21-2010
0.00
Wingnut cleco organizer
Details
     

 07-22-2010
0.00
Aluminum sheet bending tool
Details
       

 06-16-2010
2.50
Various clamps for fuselage assembly
Details
     

 09-04-2009
1.00
Finished the 12v power pack
Details
       

 09-03-2009
4.00
Test battery pack (variable polarity)
Details
       

 06-16-2009
0.50
Fabricated second rod end bearing tool
Details
     

 06-08-2009
0.00
Counterweight shaping
Details
       

 05-22-2009
0.50
Fabricate drill bushing
Details
       

 10-21-2008
1.00
Fabricated tool for installing hinge bearings
Details
       

 10-19-2008
3.00
Built bench fixtures to hold control surfaces
Details
     

 09-22-2008
2.00
Built bending brake
Details
       

 08-17-2008
0.50
Fabrication of "dimple punch"
Details
       

 08-17-2008
1.00
Fabricated some recommended tools
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.