KitLog pro

Powered By Kitlog Pro v2.0

Pete's RV-8 Web Site
Work Logs Found: 14
Category Work Time: 26 Hours
 Date
Hours
Work Log Summary

Details

 06-08-2009
0.00
Wiring conduit
Details
       

 05-18-2009
2.00
Complete riveting on vertical stabilizer
Details
       

 05-17-2009
2.00
Riveted the vertical stabilizer
Details
       

 05-16-2009
1.00
Prepared the vertical stab skin for assembly
Details
       

 05-15-2009
1.00
Match drilled new vertical stab skin to skeleton
Details
     

 05-15-2009
4.50
Began process to reskin the vertical stabilizer
Details
       

 09-16-2008
6.00
Finished the vertical stabilizer
Details
     

 09-15-2008
0.50
Riveted ribs to vertical stabilizer front spar
Details
     

 09-14-2008
2.00
Riveted the vertical stabilizer rear spar
Details
       

 09-01-2008
1.50
Machine countersink spar doubler
Details
     

 08-30-2008
2.00
Prepared vertical stab for final assembly
Details
     

 08-28-2008
1.80
Match drilled vert stab skin to skeleton
Details
       

 08-28-2008
0.30
Attached doubler and hinge brackets to spar
Details
     

 08-28-2008
1.00
Assemble and drill vert stab skeleton
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.