Date
|
Hours
|
Work Log Summary

|
Details

|
06-08-2009
|
0.00
|
Wiring conduit
|
Details
|
|
|
05-18-2009
|
2.00
|
Complete riveting on vertical stabilizer
|
Details
|
|
|
05-17-2009
|
2.00
|
Riveted the vertical stabilizer
|
Details
|
|
|
05-16-2009
|
1.00
|
Prepared the vertical stab skin for assembly
|
Details
|
|
|
05-15-2009
|
1.00
|
Match drilled new vertical stab skin to skeleton
|
Details
|
 |
|
05-15-2009
|
4.50
|
Began process to reskin the vertical stabilizer
|
Details
|
|
|
09-16-2008
|
6.00
|
Finished the vertical stabilizer
|
Details
|
 |
|
09-15-2008
|
0.50
|
Riveted ribs to vertical stabilizer front spar
|
Details
|
 |
|
09-14-2008
|
2.00
|
Riveted the vertical stabilizer rear spar
|
Details
|
|
|
09-01-2008
|
1.50
|
Machine countersink spar doubler
|
Details
|
 |
|
08-30-2008
|
2.00
|
Prepared vertical stab for final assembly
|
Details
|
 |
|
08-28-2008
|
1.80
|
Match drilled vert stab skin to skeleton
|
Details
|
|
|
08-28-2008
|
0.30
|
Attached doubler and hinge brackets to spar
|
Details
|
 |
|
08-28-2008
|
1.00
|
Assemble and drill vert stab skeleton
|
Details
|
 |