Powered By Kitlog Pro v2.0
Pete's RV-8 Web Site
RV-8
Vertical Stabilizer
Work Logs Found:
14
Category Work Time:
26 Hours
Date
Hours
Work Log Summary
Details
06-08-2009
0.00
Wiring conduit
Details
05-18-2009
2.00
Complete riveting on vertical stabilizer
Details
05-17-2009
2.00
Riveted the vertical stabilizer
Details
05-16-2009
1.00
Prepared the vertical stab skin for assembly
Details
05-15-2009
1.00
Match drilled new vertical stab skin to skeleton
Details
05-15-2009
4.50
Began process to reskin the vertical stabilizer
Details
09-16-2008
6.00
Finished the vertical stabilizer
Details
09-15-2008
0.50
Riveted ribs to vertical stabilizer front spar
Details
09-14-2008
2.00
Riveted the vertical stabilizer rear spar
Details
09-01-2008
1.50
Machine countersink spar doubler
Details
08-30-2008
2.00
Prepared vertical stab for final assembly
Details
08-28-2008
1.80
Match drilled vert stab skin to skeleton
Details
08-28-2008
0.30
Attached doubler and hinge brackets to spar
Details
08-28-2008
1.00
Assemble and drill vert stab skeleton
Details
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
1127
2782
About the Builder
12
Canopy
60
198
Electrical Supplies
2
Elevators
40
79
Empennage
22
104
Engine
55
145
Finishing Kit
31
178
Fuselage
293
898
Hangar/Workshop
28
Horiz Stabilizer
33
49
Instrument Panel
22
47
Miscellaneous
103
4
Paint
15
Primer
3
Prop
5
28
Reference Material
14
Rudder
19
37
RV-8 Specifications
2
Shop Supplies
5
Software
1
Tools
27
4
Tools (Fabricated)
15
16
Training Project
5
7
Vertical Stabilizer
14
26
Wheels & Brakes
1
2
Wings
192
645
Wiring & Electrical
72
259
Workshop
36
56
Copyright © 2001-2024 Matronics. All Rights Reserved.