Conrads X-10 Build Log
Work Logs Found: 7
Category Work Time: 18 Hours
 Date
Hours
Work Log Summary

Details

 06-07-2009
2.00
LAYING OUT THE WING TIP AFT RIVET PATTERN
Details
       

 06-03-2009
4.00
FORWARD TORQUE TUBE SUB-ASSEMBLY and AFT TORQUE TU
Details
     

 06-02-2009
2.00
AILERON BELL CRANK BUSHING INSTALLATION and AILERO
Details
     

 06-01-2009
1.00
ROD END BEARING AND JAM NUT INSTALLATION, and AIL
Details
     

 05-30-2009
3.00
BELLCRANK TO AILERON PUSHROD FABRICATION and PILOT
Details

 05-29-2009
3.00
THREADED ROD END INSTALLATION
Details

 05-28-2009
3.00
RQUE TUBE TO BELL CRANK PUSHROD FABRICATION,
Details