Powered By Kitlog Pro v2.0
John B.s Web Site
RV-9A
Firewall Forward
Work Logs Found:
68
Category Work Time:
152 Hours
Date
Hours
Work Log Summary
Details
09-05-2012
2.75
Seal firewall
Details
08-25-2011
1.50
Seal engine baffles used by oil line
Details
10-22-2010
2.50
Sliding Canopy
Details
07-12-2009
1.00
Bracket for Fuel Flow Sensor
Details
10-09-2008
1.00
Prop oil line clearence
Details
09-16-2008
15.00
Engine baffle air seals
Details
09-16-2008
0.10
Engine baffle air seals
Details
09-16-2008
0.10
Engine baffle air seals
Details
09-08-2008
2.25
Trim front baffles.
Details
09-08-2008
0.50
Air input ramp
Details
08-18-2008
0.50
Engine Control
Details
08-16-2008
1.00
Oil line to oil cooler
Details
08-15-2008
1.00
Oil Line to Oil cooler
Details
08-15-2008
0.50
Ignition cables
Details
08-14-2008
0.50
Seal cooling blast tubes
Details
08-14-2008
0.75
Install cooling blast tubes
Details
08-14-2008
0.25
Engine mount cutter pins
Details
08-13-2008
2.00
Install engine baffles
Details
08-12-2008
1.50
Install baffles
Details
08-11-2008
1.50
Cabin heat flange (rear right baffle)
Details
08-09-2008
0.50
Cooling fin wrap reinforcements
Details
08-08-2008
2.00
Cooling fin wrap reinforcements
Details
08-07-2008
3.00
Fit oil cooler to Part 5 and rivet parts together
Details
08-06-2008
2.50
Bolt reinforcements
Details
08-05-2008
2.00
Bolt reinforcement.
Details
08-04-2008
1.00
Install leftt ignition cable seal
Details
08-03-2008
1.50
Paint the baffles
Details
08-02-2008
2.00
Prep for baffle painting
Details
08-01-2008
1.50
Right ignition cable seal
Details
07-31-2008
1.50
Drilled holes for cooling blast tubes
Details
07-30-2008
1.50
Install left ignition cable seal
Details
07-29-2008
3.50
Cut the hole for the oil cooler
Details
07-28-2008
3.00
Modification to left back outer bulkhead
Details
07-24-2008
2.00
Support brace for Part 4 and Part 8
Details
07-23-2008
1.50
Finger spacer on left back inner bulkhead
Details
07-22-2008
1.00
Install Platenuts on forward side baffles
Details
07-20-2008
1.50
Final Trim Engine bafles
Details
07-18-2008
2.00
Fit Part 12 and Part 15
Details
07-13-2008
15.00
Engine baffles
Details
07-11-2008
2.00
Upper cowl curvature
Details
07-10-2008
1.50
Part 134
Details
07-10-2008
3.00
Air inlet floor to front bulkhead fasteners
Details
07-09-2008
3.00
Front bulkhead
Details
07-09-2008
3.00
Front bulkhead
Details
07-08-2008
0.10
Front bulkheads 2
07-08-2008
3.00
Front bulkheads 1
Details
07-05-2008
1.50
Right front bulkhead
Details
07-04-2008
4.00
Right front air inlet floor
Details
07-02-2008
1.50
Left front bulkhead
Details
07-01-2008
2.00
Left front air inlet floor
Details
06-30-2008
3.00
Make Part 10SF
Details
06-29-2008
0.10
Fit Part 10, continue
06-28-2008
5.00
Fit Part 10
Details
06-25-2008
0.10
Fit Part 10, continue 2
06-25-2008
0.10
Fit Part 10, continue 1
Details
06-24-2008
8.00
Fit Part 10, right front air inlet floor.
Details
06-23-2008
5.00
Fit Part 2, left front air inlet floor.
Details
06-22-2008
4.00
Fit back bulkheads
Details
06-21-2008
1.00
Engine baffles
Details
06-17-2008
5.00
Engine baffles
Details
06-15-2008
2.00
Cabin heat muff
Details
06-14-2008
0.50
Throttle and Mixture control
Details
06-13-2008
2.00
Vetterman exhaust system
Details
06-10-2008
3.00
Fuel pump fitting
Details
06-08-2008
0.25
Prop control
Details
06-07-2008
1.00
Manifold pressure gage
Details
06-05-2008
0.25
Install oil filler tube
06-04-2008
2.50
Install alternator belt.
Details
SITE NAVIGATION
Contact Builder
RV-9A Home
Category
# Logs
# Hours
All
1347
2941
Avionics
207
496
Canopy
50
145
Cowling
29
70
Electrical
18
49
Empennage
35
60
Engine
119
248
FilteredAirBox
7
17
Firewall Forward
68
152
Fuselage
464
944
Hardware
3
4
Labels
6
10
Miscellaneous
46
103
Paperwork
2
0
Prop
1
2
Seat belt
3
8
Wings
289
633
Copyright © 2001-2024 Matronics. All Rights Reserved.