My Airplane Projects
Work Logs Found: 228
Category Work Time: 0 Hours
 Date
Hours
Work Log Summary

Details

 11-01-2020
0.00
Reset trim limits.
Details

 08-12-2020
0.00
Fitted and installed doors
Details

 08-05-2020
0.00
WIng root fairings
Details

 07-15-2020
0.00
Fuel system, instrument panel.
Details
     

 07-03-2020
0.00
Worked on windshield fitting.
Details

 05-13-2020
0.00
A little panel work
Details
     

 05-12-2020
0.00
Ordered grease and buttons, packed up props.
Details

 05-11-2020
0.00
Continued electrical work.
Details
     

 05-09-2020
0.00


 05-07-2020
0.00
Tail feathers and rigging.
Details
       

 05-06-2020
0.00
Tail feather work.
Details
     

 05-05-2020
0.00
Sam worked on tail.
Details
       

 05-04-2020
0.00
Finished most panel wiring.
Details
       

 05-02-2020
0.00
Began wiring revisions.
Details
       

 04-30-2020
0.00
Updated wiring diagram
Details
     

 04-28-2020
0.00
Moved to T hangar, worked on HS.
Details
       

 04-15-2020
0.00
Painted glare shield.
Details

 04-09-2020
0.00
Worked on windshield strip.
Details
       

 04-08-2020
0.00
Checked present latch mechanism.
       

 03-30-2020
0.00
Tested light, tried bearing.
Details

 03-29-2020
0.00
Airport visit for latchs and lights.
Details
       

 03-27-2020
0.00
Worked on yokes, ordered starter bearing.
Details

 03-26-2020
0.00
Worked parts at home.
Details
     

 03-20-2020
0.00
Baffles @ Pecks Lake, windshield at FBO.
Details
       

 03-17-2020
0.00
Worked on exhaust and baffles.
Details
       

 03-16-2020
0.00
Moved fuselage to FBO hangar.
Details
       

 03-13-2020
0.00
Ordered parts, worked on throttle control.
Details

 03-11-2020
0.00
Moved back to airport.
Details
     

 03-03-2020
0.00
Installed engine.
Details

 11-23-2019
0.00
Received ski fitting kit
     

 11-17-2019
0.00
Painted 2nd batch first coat.
       

 11-16-2019
0.00
Primed 2nd batch parts

 11-15-2019
0.00
Prepped/alodined 2nd batch parts

 11-08-2019
0.00
Reorganized paint area, moved interior to T hangar

 08-01-2019
0.00
Began lower cowl repair.
Details

 06-13-2019
0.00
Lower cowl cosmetics and patch.

 06-06-2019
0.00
Door and window interior painting.
Details

 06-03-2019
0.00
Worked on doors
Details

 05-31-2019
0.00
Put away all tools, prepped for move.

 05-29-2019
0.00
Gear legs.
Details

 05-28-2019
0.00
Panel and gear.
Details

 05-25-2019
0.00
ELT test, wiring tidy-up.
Details

 05-24-2019
0.00
Avionics wiring.
Details
     

 05-22-2019
0.00
Tested radio audio.
Details

 05-21-2019
0.00
Revised sub-panel mounting, check audio wiring.
Details

 05-15-2019
0.00
Photos from UFO fly-in.
Details
       

 05-14-2019
0.00
Finished panel wiring, powered up.
Details

 05-13-2019
0.00
Mag compass
Details
       

 05-11-2019
0.00
Photos of C140.
Details
       

 05-10-2019
0.00
Puttered - electrical.
Details

 05-03-2019
0.00
Worked on avionics.
Details
       

 05-02-2019
0.00
Inserted D cells, tested ELT for output.

 05-01-2019
0.00
Worked on wiring and avionics.
Details
     

 04-29-2019
0.00
Installed left aft spar spacer, painted parts.

 04-18-2019
0.00
Wiring.
Details

 04-17-2019
0.00
Miscellaneous minor tasks.
Details

 04-16-2019
0.00
Continued wiring.
Details
       

 04-15-2019
0.00
Worked on second batch of parts at Milton's.
Details

 04-13-2019
0.00
Moved first batch of painted parts to T hangar.

 04-12-2019
0.00
Panel work.
Details
       

 04-11-2019
0.00
Spars, strobe, miscellaneous.
Details
       

 04-10-2019
0.00
Panel work.
Details
       

 04-09-2019
0.00
Fuselage and panel work continue.
Details
       

 04-08-2019
0.00
Fuselage and panel work continue.
Details

 04-07-2019
0.00
First batch parts paint.
Details
       

 04-06-2019
0.00
Priming session 1.
Details
     

 04-05-2019
0.00
Painted interior, Alodined parts.
Details
       

 04-04-2019
0.00
Readied for interior paint.
Details
       

 04-03-2019
0.00
Panel layout plus.
Details
       

 04-02-2019
0.00
Fuselage tasks.
Details

 04-01-2019
0.00
Various tasks on fuselage.
Details

 03-30-2019
0.00
Miscellaneous Saturday puttering.
Details
       

 03-28-2019
0.00
Regulator, solunoid, Floating panel blank.
Details
       

 03-27-2019
0.00
Regulator and solunoid work.
Details

 03-26-2019
0.00
Miscellaneous tasks.
Details
       

 03-25-2019
0.00
Paint choices, antennas, voltage regulator.
Details
     

 03-24-2019
0.00
Cowl latches, struts.
Details
       

 03-23-2019
0.00
Parts prep for paint.
Details
       

 03-21-2019
0.00
More antenna work.
Details

 03-20-2019
0.00
Worked on antennas.
Details
     

 03-19-2019
0.00
Primer prep and Grimes.
Details
     

 03-16-2019
0.00
Panel prep for paint.
Details
       

 03-15-2019
0.00
Continued work on panel.
Details
       

 03-14-2019
0.00
Finished wiring on mockup panel.
Details
     

 03-13-2019
0.00
Worked fuselage parts @ Milton's.
Details
       

 03-12-2019
0.00
Worked on small parts, wiring.
Details
     

 03-11-2019
0.00
Began paint prep at Milton's
Details
       

 03-08-2019
0.00
Continued on wiring.
Details
     

 03-07-2019
0.00
Worked on avionics wiring.
Details
       

 03-06-2019
0.00
Worked on avionics wiring.
Details
       

 03-05-2019
0.00
Began building up panel wiring.
Details
       

 03-04-2019
0.00
Started intercom wiring.
Details

 03-01-2019
0.00
Finished glovebox and CB panel.
Details
     

 02-28-2019
0.00
Worked on electrical planning.
Details
     

 02-27-2019
0.00
Made decision, reduced glove box, made CB panel
Details

 02-26-2019
0.00
Worked on electrical system design.
Details

 02-25-2019
0.00
Test fit switches and breakers.
Details

 02-24-2019
0.00
Documented old wiring, drafted new wiring and pane
Details
       

 02-23-2019
0.00
Took pictures, did research.
Details
       

 02-22-2019
0.00
Peparation for panel wiring.
Details
       

 02-21-2019
0.00
Documented old wiring.
Details
     

 02-20-2019
0.00
Fit windshields, removed old wiring.
Details
       

 02-19-2019
0.00
Worked on windsheild.
Details
     

 02-18-2019
0.00
Installed doors, checked windsheild and controls.
Details
       

 02-14-2019
0.00
Heater, seat pan riveting.
Details
       

 02-12-2019
0.00
Staged h'ware, loosened switches.
Details
       

 02-11-2019
0.00
Installed rivets, repaired heater control.
Details
       

 02-08-2019
0.00
Secured battery cable.
Details
       

 02-06-2019
0.00
Installed aileron controls.
Details
     

 02-01-2019
0.00
Riveted seat pan.
Details

 01-31-2019
0.00
Small tasks.
Details
       

 01-29-2019
0.00
Trim wheel, rivets.
Details
       

 01-28-2019
0.00
Fuel plumbing install.
Details
     

 01-26-2019
0.00
Rivetted gearbox cover.
Details
       

 01-25-2019
0.00
Catch-up weekday sessions
Details
       

 01-18-2019
0.00
Aileron controls, brake lines.
Details
     

 01-17-2019
0.00
Tested left brake plumbing.
Details

 01-16-2019
0.00
Gearbox cover and brake lines.
Details
       

 01-15-2019
0.00
Elevator cables, gearbox.
Details
     

 01-14-2019
0.00
Repaired two rivets.
Details
       

 01-12-2019
0.00
More fuselage riveting.
Details
     

 01-11-2019
0.00
Flight control hookups.
Details
     

 01-08-2019
0.00
Odds and ends.
Details
     

 01-07-2019
0.00
Small stuff after flying with Jacob Hentnik.
Details
       

 01-05-2019
0.00
Right side riveting, battery box.
Details
       

 01-04-2019
0.00
Got information about motor mount attachment.
Details
       

 01-03-2019
0.00
Flight controls parts.
Details

 01-02-2019
0.00
Worked on flight controls.
Details
       

 12-31-2018
0.00
Began work on re-installation of flight controls.
Details
       

 12-30-2018
0.00
Two team riveting and motor mount install.
Details
       

 12-28-2018
0.00
Replaced right rudder cable.
Details
       

 12-27-2018
0.00
Repaired elevator bellcrank.
Details
     

 12-26-2018
0.00
Replaced battery cable and brake lines.
Details
       

 12-21-2018
0.00
Riveted floorboards.
Details

 12-19-2018
0.00
Catch-up Entry Last Few Days
Details

 12-13-2018
0.00
Sorted out brake lines.
Details

 12-12-2018
0.00
Fuel plumbing, battery wire.
Details
       

 12-11-2018
0.00
Fit, drilled box cover and seat pan.
Details
       

 12-10-2018
0.00
Fitted floors and gearbox cover.
Details
       

 12-07-2018
0.00
Dry fit floor boards, drilled side skins.
Details

 12-06-2018
0.00
Back to work on fuselage!
Details
     

 12-03-2018
0.00
Overhauled rudder pedal assembly.
Details
     

 07-25-2017
0.00
Removed from jig, set up new area.
     

 07-24-2017
0.00
Finished fitting gear leg covers.
Details
       

 07-11-2017
0.00
Finished belly rivets, worked on gear leg covers.
       

 07-07-2017
0.00
Riveted about 75% of belly stiffeners.

 07-05-2017
0.00
Began fitting side skins.
       

 07-04-2017
0.00
Riveted belly skin in place.
       

 07-03-2017
0.00
Clecoed belly skin in place.
       

 06-19-2017
0.00
Continued re-assembly of fuselage.
Details
       

 06-13-2017
0.00
Blasted, inspected, cleaned engine mount.
     

 06-03-2017
0.00
Riveted front skins to structure.
     

 05-29-2017
0.00
Began riveting skins on. Primed firewall.
       

 05-27-2017
0.00
Deburring and cleaning.
Details
       

 05-26-2017
0.00
Continued work on gearbox bulkheads and new skins
Details

 05-13-2017
0.00
Began riveting gearbox into fuselage.
     

 05-12-2017
0.00
More riveting gearbox together, test fit.
     

 05-08-2017
0.00
Continued riveting gear box.
     

 05-06-2017
0.00
Turned the corner! Reassembly begins!
Details
       

 05-05-2017
0.00
Parts primed by Chris.
     

 05-03-2017
0.00
Finished upsizing gearbox assembly holes, deburred
       

 05-02-2017
0.00
Marked hole sizes.
Details
       

 05-01-2017
0.00
Clamped in place and drilled steel angles.
       

 04-10-2017
0.00
Behind panel work.
Details
       

 04-04-2017
0.00
Deburred and cleaned parts.
     

 03-31-2017
0.00
Disassembled center section, trimmed bulkhead flan
       

 03-29-2017
0.00
Completed fitting skins and internal structure. Re
       

 03-19-2017
0.00
Drilled new side skins, pushed out elevator rod be
     

 03-16-2017
0.00
Got new bearing for elevator control rod end.
       

 03-15-2017
0.00
Cleaned and repaired elevator control bracket.
     

 03-07-2017
0.00
Fabbed new skins near LG legs, started elevator co
       

 03-06-2017
0.00
Trim control.
Details
       

 03-03-2017
0.00
Continued on fuselage.
Details
       

 02-05-2017
0.00
More reconstruction work .............
Details
     

 01-24-2017
0.00
Catch-up entry - work continues...
Details
       

 01-07-2017
0.00
Bill worked on gearboxes and new skins.

 12-23-2016
0.00
Marked and cut angles off.
       

 12-19-2016
0.00
Laid out and drilled both forward skins
     

 12-14-2016
0.00
Removed brake pedal clamps
Details
     

 12-03-2016
0.00
Worked on bulkhead and skins.
Details
       

 11-25-2016
0.00
Installed master cylinders.
     

 11-23-2016
0.00
Master cylinder bracket and bulkhead marking.
Details

 11-22-2016
0.00
Drilled holes in new forward bulkhead.
     

 11-21-2016
0.00
Bulkhead work and master cylinders.
Details
       

 06-02-2016
0.00
Tires and tubes.
Details
     

 05-17-2016
0.00
Catch up entry. See details.
Details
     

 05-04-2016
0.00
Wheels, rocker bushings, gear box.
Details
       

 05-03-2016
0.00
Brake work.
Details

 03-21-2016
0.00
Fabbed second set of bulkheads.
Details
       

 02-01-2016
0.00
Carb inspection.
Details
       

 01-30-2016
0.00
Drilled angles.
Details
     

 01-27-2016
0.00
Prepped parts, started on carbs.
Details
     

 01-26-2016
0.00
Continued making new parts..
Details
     

 01-21-2016
0.00
Joggles.
Details
     

 01-20-2016
0.00

Details
       

 01-18-2016
0.00
Fabbed new belly skin.
Details
     

 01-16-2016
0.00
Saturday Work Day
Details

 01-14-2016
0.00
Worked on stringer and other tasks.
Details
       

 01-13-2016
0.00
Doublers and floors.
Details
       

 01-12-2016
0.00
Worked on doorpost top channels.
Details
       

 01-09-2016
0.00
Finished floor panels, removed rivets.
Details
       

 01-06-2016
0.00
Work continues on fuselage.
Details
       

 12-28-2015
0.00
Bulkheads.
Details
       

 12-14-2015
0.00
Bulkheads and floor boards.
Details

 12-11-2015
0.00
Continued fuselage work.
Details
       

 12-03-2015
0.00
Bulkhead work.
Details
       

 11-18-2015
0.00
Removed gear boxes and bulheads.
Details
       

 11-17-2015
0.00
Removed floors and pushrod, trial fit doors.
Details
       

 11-14-2015
0.00
Disassembly of items in gear box area.
Details

 11-13-2015
0.00
Removed three big skins.
Details
       

 11-12-2015
0.00
Drilled rivets.
Details

 11-11-2015
0.00
Drilled rivets.
Details
       

 11-07-2015
0.00
Removed windsheild and venturi's.
Details
       

 11-06-2015
0.00
Drilled rivets, removed skin.
       

 11-05-2015
0.00
Fuselage back in jig.
Details
       

 11-22-2013
0.00
Worked on gear leg.
Details
       

 11-21-2013
0.00
Swapped gear legs.
Details
       

 11-20-2013
0.00
Moved fuselage to my hanagar.
Details
     

 11-19-2013
0.00
Built gear leg dollies.

 11-18-2013
0.00
Finished disassembly, removed from jig.
Details
       

 11-15-2013
0.00
Removed floor panels.
       

 11-13-2013
0.00
Drilled out floor.
       

 11-12-2013
0.00
Worked on gearbox/doorpost disassembly.
Details

 11-08-2013
0.00
Exposed more problems in MLG area.
Details
       

 11-07-2013
0.00
More disassembly & inspection.
Details
       

 11-06-2013
0.00
Interior removal, assembled generator.
Details
     

 11-05-2013
0.00
Fuselage in jig.
Details
       

 11-04-2013
0.00
Moved fuselage to FBO hangar.
Details
       