KitLog pro

Powered By Kitlog Pro v2.0

Conrads X-10 Build Log
Work Logs Found: 15
Category Work Time: 32 Hours
 Date
Hours
Work Log Summary

Details

 05-08-2009
1.00
removed the A-1001 Trailing Edge from both Aileron
Details
       

 05-07-2009
2.00
Turned the assembly over and riveted the assigned
Details

 05-06-2009
1.00
Clecoed the end ribs A1005-L and A-1005-R to the M
Details

 05-05-2009
1.00
21-6 Completed Step 2 with for the Bottom Skin Ass
Details

 05-04-2009
2.00
Clecoed at every other hole the Top Skin Assembly
Details
       

 05-03-2009
1.00
Spar A-1003-L in the cradle I lowered the A-1001A-
Details
     

 05-02-2009
3.00
Attached the A-1004-L and A-1004 Nose Ribs to the
Details
       

 05-01-2009
1.00
Clecoed the A-1014 Spacer to the A-1003 Spar.
Details

 04-30-2009
2.00
clecoed in place the A-1011 Trailing Edge made fro
Details

 04-29-2009
4.00
Began by clecoing the Counter Balance Weight or “p
Details
     

 04-28-2009
2.00
Attached the Bottom Skin Assembly to the Spar and
Details
     

 04-27-2009
2.00
Completed riveting all the Rib Stiffeners A-710 to
Details
     

 04-22-2009
3.00
Section 21-3 Steps 6 to 8 After orienting the A-10
Details
     

 04-19-2009
4.00
Section 21-3 Out-Board / In-Board Hinge Bracket an
Details
       

 04-17-2009
3.00
Started the Ailerons Nose Rib, Doublers Counter W
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.