Powered By Kitlog Pro v2.0
RV-7A Construction Log
RV-7A
Engine
Work Logs Found:
102
Category Work Time:
73 Hours
Date
Hours
Work Log Summary
Details
11-15-2020
3.00
Oil Chg and EGT Replace
Details
01-19-2019
1.00
Fuel Flow Test Final 1
Details
11-10-2018
0.30
Fuel Injection Plug
Details
09-23-2018
0.25
First Engine Start 4
Details
09-23-2018
0.20
First Engine Start 3
Details
09-23-2018
1.00
First Engine Start 1
Details
09-22-2018
0.25
First Engine Start 2
Details
09-06-2018
1.00
Fuel Flow Test 1
Details
07-07-2018
0.30
Quick Drain
Details
07-04-2018
0.50
Alternator
Details
07-02-2018
1.00
Sniffle Valve
Details
06-08-2018
0.50
Testing Fuel Flow 2
Details
06-08-2018
1.00
Testing Fuel Flow 1
Details
06-06-2018
0.50
Sniffle Valve
Details
05-18-2018
0.30
Snorkel Bolts Safety Wired
Details
12-06-2017
1.00
Baffle Material 3
Details
12-06-2017
0.50
Baffle Material 2
Details
10-11-2017
1.00
Baffle Material 1
Details
10-08-2017
0.50
Oil Dip Stick
Details
10-07-2017
0.50
Exhaust Heat Muff 3
Details
10-07-2017
1.00
Exhaust Heat Muff 2
Details
10-07-2017
1.00
Exhaust Heat Muff 1
Details
08-04-2017
0.10
Exhaust 4
Details
08-04-2017
0.50
Exhaust 3
Details
08-04-2017
1.00
Exhaust 2
Details
08-04-2017
1.00
Exhaust 1
Details
07-05-2017
0.50
Oil Cooler Install
Details
06-07-2017
1.00
Baffle 24 Snorkle
Details
06-07-2017
1.00
Baffle 23 Snorkle
Details
06-06-2017
1.00
Baffle Rivetting 2
06-06-2017
1.00
Baffle Rivetting 1
Details
04-20-2017
1.00
Baffles 21 Snorkle Inlet Version 2b
Details
04-20-2017
1.00
Baffles 21 Snorkle Inlet Version 2a
Details
04-19-2017
0.50
Baffle 22 Snorkle
Details
04-19-2017
0.50
Baffle 21 Snorkle
Details
04-19-2017
0.50
Baffle 20 Snorkle
Details
04-18-2017
1.00
Baffles 18 Snorkle
Details
04-18-2017
0.50
Baffles 16 Trimming left side rear
Details
04-18-2017
0.50
Baffles 15 Had to redo the top cowl airflow
Details
04-18-2017
0.50
Baffles 14 Front clips
Details
04-18-2017
0.50
Baffles 13 Paper clips on baffles
Details
04-18-2017
0.50
Baffles 11 Conical part
Details
04-18-2017
0.50
Baffles 10 DO NOT TRIM LEFT RAMP
Details
04-18-2017
0.50
Baffle 19 Snorkle
Details
04-18-2017
0.50
Baffle 12 Mark and cut baffles to height.
Details
04-17-2017
0.50
Baffles 7
Details
04-17-2017
0.50
Baffles 5
Details
04-17-2017
0.50
Baffles 4
Details
04-17-2017
0.50
Baffles 1 Oil Cooler
Details
04-17-2017
0.50
Baffle 9 Ramps
Details
04-17-2017
1.00
Baffle 8
Details
04-17-2017
0.50
Baffle 6 Corner re-enforcement
Details
04-17-2017
0.50
Baffle 3
Details
04-17-2017
0.50
Baffle 2 Cooler vertical position
Details
02-19-2017
1.00
Cooling Blow Tubes
Details
12-04-2016
1.00
Red Cube Fuel Flow Sensor 4 Fire Sleeve
Details
12-04-2016
1.00
Red Cube Fuel Flow Sensor 3 Fire Sleeve
Details
11-02-2016
1.00
Engine Preparation 33 - Dimple Firewall
09-19-2016
1.00
Red Cube Fuel Flow Sensor 2 - Installed
Details
09-19-2016
0.50
Red Cube Fuel Flow Sensor 1 - Location
Details
09-18-2016
1.00
Fuel Overflow Bypass Hose
Details
09-16-2016
1.00
Throttle Body 1
Details
09-16-2016
0.25
Mount the Engine 9 Oil Pressure Hose
09-16-2016
1.00
Mount the Engine 8 Alternator
Details
09-16-2016
0.50
Mount the Engine 7 Blower Hose
Details
09-16-2016
1.00
Mount the Engine 6 Mixture Linkage
Details
09-16-2016
1.00
Mount the Engine 5 Throttle Linkage
Details
09-15-2016
1.00
Mount the Engine 4
Details
09-15-2016
0.50
Mount the Engine 3
Details
09-15-2016
1.00
Mount the Engine 2
Details
09-15-2016
0.50
Mount the Engine 1
Details
09-14-2016
0.25
Cables 7 - Interference with pressure hose
Details
09-14-2016
1.00
Cables 6 - Subpanel mount
09-14-2016
1.00
Cables 5-Prop Govenor
Details
09-14-2016
0.50
Cables 4 - Mixture routing
Details
09-14-2016
0.20
Cables 3.5 - Heater Valve Cable Routing
09-14-2016
0.50
Cables 3 - Throttle Routing
Details
09-14-2016
0.50
Cables 2 - Panel Placement
Details
09-14-2016
0.50
Cables 1 - Firewall Penetrations
Details
09-13-2016
0.25
Throttle Body 1
Details
09-12-2016
1.00
Prop Govenor 2
Details
09-12-2016
1.00
Prop Govenor 1
Details
09-11-2016
0.50
Engine Preparation 14 - Oil Cooler & Manifold Pres
Details
09-09-2016
1.00
Engine Preparation 6.5 - Cabin Heat Valve Cable
Details
09-03-2016
1.00
Engine Preparation 13 - Oil Pressure Fitting
Details
09-03-2016
0.20
Engine Preparation 12 - Rearrange Garage
Details
09-03-2016
2.00
Engine Preparation 11 - Install Mount & Gears
Details
09-03-2016
1.00
Engine Preparation 10 - Fire Wall Prep Done
Details
09-02-2016
1.00
Engine Preparation 9 - Cutout Riveted on
Details
09-02-2016
0.50
Engine Preparation 8 - Copper Strip
Details
09-02-2016
0.20
Engine Preparation 7 - Transducer Fitting
Details
09-02-2016
1.00
Engine Preparation 6 - Cabin Heat Valve
Details
09-02-2016
1.00
Engine Preparation 5 - Painted Box
Details
09-02-2016
1.00
Engine Preparation 4 - Battery Box
Details
09-02-2016
1.00
Engine Preparation 3 - Dimple Firewall
Details
09-02-2016
1.00
Engine Preparation 2 - Platenuts
Details
09-02-2016
0.50
Engine Preparation 1 - Unpack Engine
Details
09-01-2016
0.20
Engine Go Get It at Van's 2
Details
09-01-2016
0.20
Engine Go Get It at Van's 1
Details
05-01-2016
0.10
Engine Has Been Ordered
Details
06-14-2014
0.50
Engine Mount 2
06-14-2014
1.00
Engine Mount 1
Details
SITE NAVIGATION
Contact Builder
RV-7A Home
Category
# Logs
# Hours
All
2101
1764
Avionics
60
53
Cert & Flying
62
75
Cowl
48
37
Electrical
61
48
Empennage
141
181
Engine
102
73
Finish Kit
255
148
Fuselage
339
238
Fuselage After Flip
385
237
Gear
78
57
Interior
16
14
Miscellaneous
49
33
Painting
62
50
Prop
17
17
Shop
5
10
Tools
59
24
Training Projects
12
32
Wings
350
437
Copyright © 2001-2024 Matronics. All Rights Reserved.