RV-8 N998W
RV-8
Avionics
Work Logs Found:
44
Category Work Time:
138 Hours
Date
Hours
Work Log Summary
Details
04-02-2009
2.00
Reinstalled Garmin antenna BNC connectors.
Details
04-01-2009
2.00
Standby Mic jack pilot seat inop. Replaced wiring.
03-30-2009
2.50
Avionics hookup and test
03-29-2009
5.00
Reinstalled instrument panel.
02-26-2009
2.50
Install BNC connectors & Ant splitter,
02-24-2009
2.00
Install Stby A/S indicator
02-21-2009
2.90
Panel punched for Stby A/S indiccator.
Details
02-19-2009
3.20
Installed rear stick grip.
Details
02-13-2009
3.00
Installed A/P Master switch and roll control arm.
02-11-2009
1.40
Installed backup set of headset jacks
02-10-2009
1.00
Installed backup set of headset jacks
02-09-2009
2.00
Installed backup headset jacks
11-12-2008
7.00
Installed Aileron.Elevator & flap sensor wiring.
Details
11-11-2008
4.30
Installed aileron trim.
Details
11-10-2008
5.00
EFIS & EIS programming
11-09-2008
4.00
EFIS & EIS programming
11-03-2008
3.50
EFIS & EIS programming
10-30-2008
5.00
Magnetometer alignment
10-29-2008
4.00
Fabricated & Installled RT radio rack brace.
Details
10-15-2008
1.50
Fabricated & Installed LT radio rack brace.
09-01-2008
3.50
Finished installing switch panel
08-31-2008
6.00
Switch panel installed
07-03-2008
2.00
Mounted & installed magnetometer in aft fuselage.
07-02-2008
2.00
Fabricated bracket for magnetometer.
06-16-2008
3.30
Installed molex connectors for switch panel.
Details
06-15-2008
1.20
Installed molex connectors for switch panel.
06-14-2008
1.50
Installed molex connectors for switch panel.
06-13-2008
6.00
Installed molex connectors for switch panel.
06-11-2008
4.50
Installed molex connectors for switch panel.
06-09-2008
3.30
Installed molex connectors for switch panel.
06-08-2008
5.00
Installed molex connectors for switch panel.
06-06-2008
1.30
Installed molex connectors for switch panel.
06-05-2008
1.80
Installed molex connectors for switch panel.
05-17-2008
4.10
Installed avionics bus relay.
08-05-2007
2.00
Installed M/P attachments & UBS cables for EFIS
07-25-2007
2.00
Made connections for "Canopy Open" light
07-18-2007
3.00
Worked on switch panel anomolies.
07-17-2007
3.00
Cabled antennas
07-16-2007
3.00
Installed Com & Xponder antennas
07-02-2007
3.00
Switch panel wiring
07-01-2007
3.00
Reconnected front stick connections
06-29-2007
3.30
Remover rear stick grip.
Details
06-28-2007
3.30
Installed pitch servo & cable.
Details
06-27-2007
3.00
Shortened front control stick.
Details
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
813
2980
Avionics
44
138
Electrical
37
136
Empennage
64
273
Engine
86
283
Firewall Forward
1
2
First Flight
4
Fuselage
347
1237
Interior
44
157
Miscellaneous
13
66
Systems
2
9
Wings
171
679