KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Construction Log
Work Logs Found: 60
Category Work Time: 53 Hours
 Date
Hours
Work Log Summary

Details

 08-23-2021
2.00
Garmin Antenna and Cowl Aluminum
Details
       

 02-09-2019
1.00
EMS Settings
Details
     

 09-07-2018
1.00
Fuel Level Calibration 2
Details
       

 09-07-2018
2.00
Fuel Level Calibration 1
Details
       

 09-04-2018
2.00
Trim Servo Calibrations
Details

 06-04-2018
0.50
Transponder Antennas
Details
       

 05-18-2018
0.50
Glare Shield Pad 2
Details
       

 05-18-2018
0.50
Glare Shield Pad 1
Details
       

 05-06-2018
1.00
Tail Installation for Final Time 7
Details
       

 04-14-2018
1.00
Antenna for ADS-B IN 2
Details
       

 04-14-2018
1.00
Antenna for ADS-B IN 1
Details
       

 04-13-2018
1.00
Testing 1
Details
       

 04-13-2018
0.50
Headset Plugs 2
Details
       

 04-13-2018
1.00
Headset Plugs 1
Details
       

 03-25-2018
1.00
VOR & GS splitter
Details
       

 03-25-2018
0.50
Panel Install 3
Details
       

 03-25-2018
1.00
Panel Install 2
Details
       

 03-25-2018
1.00
Panel Install 1
Details
       

 03-25-2018
1.00
Capacitance to Voltage Converter 1
Details
       

 03-25-2018
1.00
Cable Adel Clamps to hold Cables under sub panel
Details
       

 03-24-2018
0.50
Slot for wing wire bundle 1
Details
       

 03-24-2018
1.00
Hole in Wing Spar Bulkhead 1
Details
       

 03-24-2018
0.50
GPS Antennas 3
       

 03-24-2018
1.00
GPS Antennas 2
       

 03-24-2018
1.00
GPS Antennas 1
Details
       

 03-24-2018
0.50
Control Module Comm and Transponder
Details
       

 02-04-2018
0.50
Front Connector Magnatometer & ADAHRS 5
Details
       

 02-04-2018
1.00
Front Connector Magnatometer & ADAHRS 2
Details
       

 02-04-2018
1.00
Front Connector Magnatometer & ADAHRS 1
Details
       

 02-03-2018
0.50
ELT and Front Connector 5
Details
       

 02-03-2018
1.00
ELT and Front Connector 4
Details
       

 02-03-2018
1.00
ELT and Front Connector 3
Details
       

 02-03-2018
1.00
ELT and Front Connector 2
Details
       

 02-03-2018
1.00
ELT and Front Connector 1
Details
       

 02-02-2018
0.20
Pitot Tube Routing to D6 EFIS 3
Details
       

 02-02-2018
1.00
Pitot Tube Routing to D6 EFIS 2
Details
       

 02-02-2018
1.00
Pitot Tube Routing to D6 EFIS 1
Details
       

 01-20-2018
1.00
Wire routing
Details
       

 01-20-2018
1.00
Servo Wires
Details
       

 01-20-2018
0.50
Oil Temperature
       

 01-20-2018
1.00
Fuel and Oil Pressure Transducers
     

 01-20-2018
1.00
Engine Control Module 1
Details
       

 01-20-2018
1.00
EGT/CHT wires
Details
       

 01-20-2018
1.00
Backup Battery and Manifold Pressure Unit
Details
       

 01-20-2018
1.00
Advanced Control Module Mounting 2
Details
       

 01-20-2018
1.00
Advanced Control Module Mounting 1
Details
       

 01-02-2018
1.00
Panel 4 Attaching Cable panel
Details
       

 01-02-2018
1.00
Panel 3 Relocating Ribs
Details
       

 01-02-2018
1.00
Panel 2 Hack Saw Stuff
Details
       

 12-30-2017
0.20
Panel 1 More Photos
Details
       

 12-29-2017
0.30
Panel 1 Receiving it
Details
       

 10-09-2017
1.00
GPS Antennas 2
Details
       

 10-09-2017
1.00
GPS Antennas 1
Details
       

 09-09-2017
1.00
Pitot Static Lines 2
Details
       

 09-09-2017
1.00
Pitot Static Lines 1
Details
       

 09-08-2017
0.10
Panel
Details
     

 09-02-2017
1.00
Antennas 3 Comms
Details
       

 09-02-2017
0.50
Antennas 2 Transponder
Details
       

 09-02-2017
0.50
Antennas 1
Details
       

 03-31-2009
0.50
Panel with EFIS and Avionics - Couldn't Help It
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.