Date
|
Hours
|
Work Log Summary
|
Details
|
04-07-2010
|
5.00
|
Changed out firewall hardware bolts for longer.
|
Details
|
|
|
04-06-2010
|
3.00
|
Installed nut plates on prop spinner back plate.
|
Details
|
|
|
03-27-2010
|
5.00
|
Installed new EGT probe.
|
Details
|
|
|
03-26-2010
|
4.00
|
Set idle and adjusted linkage.
|
|
|
|
03-23-2010
|
6.00
|
Fixed Emag anomoly. Addressed tach problem.
|
Details
|
|
|
03-21-2010
|
6.00
|
Anaylized engine start problems.
|
|
|
|
03-20-2010
|
4.00
|
First engine start
|
Details
|
|
|
03-11-2010
|
3.00
|
Torqued, safetied prop & alternator
|
|
|
|
08-23-2009
|
3.10
|
Finished installing air seals.
|
|
|
|
08-17-2009
|
3.20
|
Finished installing oil door hinge.
|
|
|
|
05-09-2009
|
4.00
|
Reinstalled and timed ignitions
|
Details
|
|
|
01-30-2009
|
2.00
|
Fabricated airseals for baffels.
|
Details
|
|
|
01-18-2009
|
2.00
|
Fabricated airseals for baffels
|
|
|
|
01-12-2009
|
4.70
|
Fabricated airseals for baffels
|
|
|
|
01-09-2009
|
2.00
|
Fabricated airseals for baffels
|
|
|
|
01-05-2009
|
2.00
|
Fabricated airseals for baffels
|
|
|
|
01-03-2009
|
4.00
|
Fabricated baffle modification for olil cooler.
|
|
|
|
01-02-2009
|
2.00
|
Applied RTV to engine baffles.
|
|
|
|
01-01-2009
|
2.00
|
Installed oil breather and timed ignition.
|
|
|
|
12-30-2008
|
2.20
|
Continued to tighten lines and hook up ignition.
|
|
|
|
12-28-2008
|
1.30
|
Tightened line with Tightseal.
|
|
|
|
12-27-2008
|
2.50
|
Fabricated plug leads, painted oil cap, tighten li
|
|
|
|
12-16-2008
|
1.50
|
Fabricated Firewall penitration.
|
|
|
|
12-15-2008
|
1.50
|
Safetywired lowewr engine baffles
|
|
|
|
12-14-2008
|
1.50
|
Safetywired lower cylinder baffles.
|
|
|
|
11-25-2008
|
0.70
|
Installed plug leads.
|
|
|
|
11-24-2008
|
2.60
|
Fabricated and installed plug leads.
|
|
|
|
08-30-2008
|
6.50
|
WD 814 installed. ESS/Avionics buss relay intalled
|
Details
|
|
|
08-23-2008
|
5.30
|
Fab fuel line for engine pump,.
|
Details
|
|
|
08-20-2008
|
5.20
|
More cowl fitting, changed out mixture cable.
|
|
|
|
08-19-2008
|
1.00
|
Installed firesleeve, mount Fuel flow transducer.
|
Details
|
|
|
08-18-2008
|
1.00
|
Fuel flow transducer mounted to firewall.
|
|
|
|
08-17-2008
|
4.30
|
Cowl & Oil cooler door fit.
|
|
|
|
08-16-2008
|
2.30
|
Engine cowl fit.
|
|
|
|
08-14-2008
|
5.70
|
Engine cowl fit.
|
|
|
|
08-10-2008
|
3.00
|
Cowl fit, replaced fuel valve fittings
|
Details
|
|
|
08-09-2008
|
2.00
|
Engine cowl fit
|
|
|
|
07-15-2008
|
4.10
|
O/P, F/P, Hobbs transduces & switches.
|
Details
|
|
|
07-14-2008
|
4.00
|
Fabrication O/P, M/P line
|
|
|
|
07-12-2008
|
2.00
|
Fabricated M/P line from Cyl to Firewall.
|
|
|
|
07-05-2008
|
2.00
|
Replaced & rerouted alt air cable.
|
|
|
|
06-30-2008
|
1.00
|
Rewired starter & removed solenoid strap.
|
|
|
|
04-20-2008
|
2.00
|
Attached Throttle quad cables
|
|
|
|
04-18-2008
|
5.50
|
Installed eng control cable firewall carry through
|
Details
|
|
|
04-14-2008
|
2.80
|
Installed Alt Air & Cabin Heat cables.
|
|
|
|
07-31-2007
|
3.30
|
Installed Stby Alt Kit.
|
Details
|
|
|
07-29-2007
|
4.00
|
Installed control quad cables
|
|
|
|
07-24-2007
|
2.50
|
Installed blast tubes for Atlternator & Mags.
|
Details
|
|
|
02-23-2007
|
2.00
|
Installed fuse links and start contactor.
|
|
|
|
02-22-2007
|
1.60
|
Measured and ordered quadrant control cables.
|
|
|
|
02-21-2007
|
2.20
|
Modified prop control bracket for fit.
|
|
|
|
02-17-2007
|
2.50
|
Reworked right rear baffle & installed oil dip sti
|
|
|
|
02-13-2007
|
2.00
|
Wired LH Pmag, install throttle bracket & Stby alt
|
|
|
|
02-11-2007
|
3.00
|
Install CYL & EGT probes, OT sensor & quick drain.
|
|
|
|
02-10-2007
|
3.00
|
Installed oil cooler fittings, alternator & mix br
|
|
|
|
02-09-2007
|
6.00
|
Baffle & snorkle installation completed.
|
|
|
|
02-08-2007
|
4.00
|
Baffle installation.
|
Details
|
|
|
02-07-2007
|
4.00
|
Baffle installation
|
|
|
|
02-06-2007
|
6.00
|
Blast tubes...
|
Details
|
|
|
01-13-2007
|
3.00
|
Oil cooler mount
|
|
|
|
01-12-2007
|
3.00
|
Oil cooler mount assembly
|
|
|
|
01-09-2007
|
5.70
|
Oil cooler mount assembly.
|
|
|
|
12-31-2006
|
5.50
|
Oil cooler mounting assembly.
|
|
|
|
12-29-2006
|
2.50
|
Snorkle installation
|
|
|
|
12-28-2006
|
2.00
|
Snorkle installation
|
|
|
|
12-24-2006
|
4.00
|
Snorkle fit & asembly.
|
|
|
|
12-20-2006
|
2.00
|
Assembled & mounted heat muff to exhaust.
|
|
|
|
12-15-2006
|
6.00
|
Trimmed & adjusted snorkle for assembly.
|
|
|
|
12-12-2006
|
3.00
|
Baffle assembly & rived cowl hinges to fuselage.
|
|
|
|
12-11-2006
|
4.50
|
Baffle installation
|
|
|
|
12-08-2006
|
2.00
|
Baffle installation
|
|
|
|
12-07-2006
|
3.00
|
Baffle installation
|
|
|
|
11-22-2006
|
1.80
|
Baffles installation
|
|
|
|
11-20-2006
|
3.80
|
Baffles
|
|
|
|
11-19-2006
|
4.30
|
Baffles
|
|
|
|
11-18-2006
|
3.50
|
Baffles
|
|
|
|
11-17-2006
|
2.70
|
Baffles
|
|
|
|
11-16-2006
|
4.60
|
Baffle assembly
|
Details
|
|
|
11-15-2006
|
4.40
|
Baffle assembly
|
|
|
|
11-14-2006
|
1.50
|
Baffle assembly
|
|
|
|
11-13-2006
|
3.50
|
Installed exhaust pipes & hangers.
|
|
|
|
11-12-2006
|
2.00
|
Installed intake pipes
|
|
|
|
10-03-2006
|
2.30
|
Hung Engine
|
|
|
|
08-26-2006
|
1.00
|
Pulled EMags off to reture to mfg for firmware upd
|
|
|
|
06-18-2006
|
5.00
|
Finished engine build up.
|
|
|
|
06-17-2006
|
10.00
|
Built up the engine in PHX with Robbie Attaway.
|
|
|