RV-8 N998W
Work Logs Found: 86
Category Work Time: 283 Hours
 Date
Hours
Work Log Summary

Details

 04-07-2010
5.00
Changed out firewall hardware bolts for longer.
Details

 04-06-2010
3.00
Installed nut plates on prop spinner back plate.
Details

 03-27-2010
5.00
Installed new EGT probe.
Details

 03-26-2010
4.00
Set idle and adjusted linkage.

 03-23-2010
6.00
Fixed Emag anomoly. Addressed tach problem.
Details

 03-21-2010
6.00
Anaylized engine start problems.

 03-20-2010
4.00
First engine start
Details

 03-11-2010
3.00
Torqued, safetied prop & alternator

 08-23-2009
3.10
Finished installing air seals.

 08-17-2009
3.20
Finished installing oil door hinge.

 05-09-2009
4.00
Reinstalled and timed ignitions
Details

 01-30-2009
2.00
Fabricated airseals for baffels.
Details
       

 01-18-2009
2.00
Fabricated airseals for baffels

 01-12-2009
4.70
Fabricated airseals for baffels

 01-09-2009
2.00
Fabricated airseals for baffels

 01-05-2009
2.00
Fabricated airseals for baffels

 01-03-2009
4.00
Fabricated baffle modification for olil cooler.

 01-02-2009
2.00
Applied RTV to engine baffles.

 01-01-2009
2.00
Installed oil breather and timed ignition.
       

 12-30-2008
2.20
Continued to tighten lines and hook up ignition.

 12-28-2008
1.30
Tightened line with Tightseal.

 12-27-2008
2.50
Fabricated plug leads, painted oil cap, tighten li

 12-16-2008
1.50
Fabricated Firewall penitration.

 12-15-2008
1.50
Safetywired lowewr engine baffles

 12-14-2008
1.50
Safetywired lower cylinder baffles.

 11-25-2008
0.70
Installed plug leads.

 11-24-2008
2.60
Fabricated and installed plug leads.

 08-30-2008
6.50
WD 814 installed. ESS/Avionics buss relay intalled
Details

 08-23-2008
5.30
Fab fuel line for engine pump,.
Details

 08-20-2008
5.20
More cowl fitting, changed out mixture cable.

 08-19-2008
1.00
Installed firesleeve, mount Fuel flow transducer.
Details

 08-18-2008
1.00
Fuel flow transducer mounted to firewall.

 08-17-2008
4.30
Cowl & Oil cooler door fit.

 08-16-2008
2.30
Engine cowl fit.

 08-14-2008
5.70
Engine cowl fit.

 08-10-2008
3.00
Cowl fit, replaced fuel valve fittings
Details

 08-09-2008
2.00
Engine cowl fit

 07-15-2008
4.10
O/P, F/P, Hobbs transduces & switches.
Details

 07-14-2008
4.00
Fabrication O/P, M/P line

 07-12-2008
2.00
Fabricated M/P line from Cyl to Firewall.

 07-05-2008
2.00
Replaced & rerouted alt air cable.
     

 06-30-2008
1.00
Rewired starter & removed solenoid strap.

 04-20-2008
2.00
Attached Throttle quad cables
       

 04-18-2008
5.50
Installed eng control cable firewall carry through
Details

 04-14-2008
2.80
Installed Alt Air & Cabin Heat cables.

 07-31-2007
3.30
Installed Stby Alt Kit.
Details

 07-29-2007
4.00
Installed control quad cables

 07-24-2007
2.50
Installed blast tubes for Atlternator & Mags.
Details

 02-23-2007
2.00
Installed fuse links and start contactor.

 02-22-2007
1.60
Measured and ordered quadrant control cables.

 02-21-2007
2.20
Modified prop control bracket for fit.

 02-17-2007
2.50
Reworked right rear baffle & installed oil dip sti

 02-13-2007
2.00
Wired LH Pmag, install throttle bracket & Stby alt

 02-11-2007
3.00
Install CYL & EGT probes, OT sensor & quick drain.

 02-10-2007
3.00
Installed oil cooler fittings, alternator & mix br

 02-09-2007
6.00
Baffle & snorkle installation completed.

 02-08-2007
4.00
Baffle installation.
Details

 02-07-2007
4.00
Baffle installation

 02-06-2007
6.00
Blast tubes...
Details
       

 01-13-2007
3.00
Oil cooler mount
       

 01-12-2007
3.00
Oil cooler mount assembly

 01-09-2007
5.70
Oil cooler mount assembly.

 12-31-2006
5.50
Oil cooler mounting assembly.

 12-29-2006
2.50
Snorkle installation

 12-28-2006
2.00
Snorkle installation
       

 12-24-2006
4.00
Snorkle fit & asembly.
       

 12-20-2006
2.00
Assembled & mounted heat muff to exhaust.
       

 12-15-2006
6.00
Trimmed & adjusted snorkle for assembly.

 12-12-2006
3.00
Baffle assembly & rived cowl hinges to fuselage.

 12-11-2006
4.50
Baffle installation

 12-08-2006
2.00
Baffle installation

 12-07-2006
3.00
Baffle installation

 11-22-2006
1.80
Baffles installation

 11-20-2006
3.80
Baffles

 11-19-2006
4.30
Baffles

 11-18-2006
3.50
Baffles

 11-17-2006
2.70
Baffles

 11-16-2006
4.60
Baffle assembly
Details

 11-15-2006
4.40
Baffle assembly

 11-14-2006
1.50
Baffle assembly

 11-13-2006
3.50
Installed exhaust pipes & hangers.
       

 11-12-2006
2.00
Installed intake pipes

 10-03-2006
2.30
Hung Engine
       

 08-26-2006
1.00
Pulled EMags off to reture to mfg for firmware upd

 06-18-2006
5.00
Finished engine build up.
       

 06-17-2006
10.00
Built up the engine in PHX with Robbie Attaway.
       