RV-8 N998W
RV-8
Interior
Work Logs Found:
44
Category Work Time:
157 Hours
Date
Hours
Work Log Summary
Details
04-18-2009
2.00
Installed mid cabin brace fasteners.
04-17-2009
3.50
Installed front seat back modification.
04-14-2009
4.50
Installed front baggage shelf.
Details
04-13-2009
5.20
Installed rear bag comp, floors and seats
04-11-2009
1.50
Fit and installed lower firewall blanket& rudder p
02-23-2009
3.80
Refitted floor panels and finished rear stick floo
02-22-2009
6.10
Install bushings for VOR coax.
Details
02-19-2007
2.50
Panel wiring
02-18-2007
1.00
Installed panel
10-01-2006
5.00
Installes Infinity stick grips.
09-17-2006
3.00
Terminate switch panel wires.
09-16-2006
4.80
Terminate switch panel wires.
09-15-2006
6.70
Terminate switch panel wirres
09-14-2006
4.30
Terminated switch panel wires
09-13-2006
3.80
Painted switch panel skirt.
Details
09-11-2006
5.30
Finished mounting switch panel.
09-10-2006
4.50
Finished mounting wheel farings.
Details
08-11-2006
3.50
More fuel lines and valve.
08-09-2006
0.80
Test fuel line install installation
07-08-2006
5.00
Install fuel lines and valve.
07-07-2006
2.50
Install fuel lines.
07-06-2006
0.50
Install fuel lines.
07-05-2006
1.50
Install fuel lines.
05-21-2006
4.60
Installed aileron trim.
05-13-2006
2.50
Riveted forward baggage bulkhead in place.
Details
05-11-2006
3.80
Plumed fuselage brake lines.
05-10-2006
6.20
Fuel valve installation fabricated.
Details
05-09-2006
3.10
Installed F-802N brace.
Details
05-07-2006
5.00
Fabricated Batt access in forward
Details
05-03-2006
3.00
Reinstalled static Safe1 static system.
Details
04-29-2006
4.50
Installed front NACA vent.
Details
04-28-2006
3.00
Drilled engine cable holes in F-802A.
Details
04-27-2006
1.00
Drilled Wd-814 windscreen support to fuselage.
Details
04-26-2006
2.70
Painted interior parts & fit F821
04-25-2006
2.00
Refit front 7 rear throttle Quads
04-23-2006
1.50
Installed Aux Fuel Pump & forward Bag comp.
04-21-2006
7.50
Installed pitch & roll servo brackets
03-08-2006
2.00
Front seat back Fab finish.
Details
03-04-2006
6.20
Aft wiring & Assemble front & rear seat backs.
03-03-2006
6.20
Installed aft wiring
03-02-2006
5.10
Seat backs preped for painting. wired strobs.
03-01-2006
1.30
Rear bay bottom stiffiner fabricated.
02-27-2006
2.20
Installed in assembly bushings for tail strob & po
10-02-2004
2.20
Drilled stiffners and hing to F829.
Details
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
813
2980
Avionics
44
138
Electrical
37
136
Empennage
64
273
Engine
86
283
Firewall Forward
1
2
First Flight
4
Fuselage
347
1237
Interior
44
157
Miscellaneous
13
66
Systems
2
9
Wings
171
679