RV-8 N998W
Work Logs Found: 44
Category Work Time: 157 Hours
 Date
Hours
Work Log Summary

Details

 04-18-2009
2.00
Installed mid cabin brace fasteners.

 04-17-2009
3.50
Installed front seat back modification.

 04-14-2009
4.50
Installed front baggage shelf.
Details

 04-13-2009
5.20
Installed rear bag comp, floors and seats
       

 04-11-2009
1.50
Fit and installed lower firewall blanket& rudder p
       

 02-23-2009
3.80
Refitted floor panels and finished rear stick floo
     

 02-22-2009
6.10
Install bushings for VOR coax.
Details

 02-19-2007
2.50
Panel wiring

 02-18-2007
1.00
Installed panel
     

 10-01-2006
5.00
Installes Infinity stick grips.

 09-17-2006
3.00
Terminate switch panel wires.

 09-16-2006
4.80
Terminate switch panel wires.

 09-15-2006
6.70
Terminate switch panel wirres

 09-14-2006
4.30
Terminated switch panel wires

 09-13-2006
3.80
Painted switch panel skirt.
Details

 09-11-2006
5.30
Finished mounting switch panel.
     

 09-10-2006
4.50
Finished mounting wheel farings.
Details
       

 08-11-2006
3.50
More fuel lines and valve.

 08-09-2006
0.80
Test fuel line install installation
     

 07-08-2006
5.00
Install fuel lines and valve.
       

 07-07-2006
2.50
Install fuel lines.

 07-06-2006
0.50
Install fuel lines.

 07-05-2006
1.50
Install fuel lines.

 05-21-2006
4.60
Installed aileron trim.

 05-13-2006
2.50
Riveted forward baggage bulkhead in place.
Details

 05-11-2006
3.80
Plumed fuselage brake lines.

 05-10-2006
6.20
Fuel valve installation fabricated.
Details

 05-09-2006
3.10
Installed F-802N brace.
Details

 05-07-2006
5.00
Fabricated Batt access in forward
Details

 05-03-2006
3.00
Reinstalled static Safe1 static system.
Details

 04-29-2006
4.50
Installed front NACA vent.
Details

 04-28-2006
3.00
Drilled engine cable holes in F-802A.
Details

 04-27-2006
1.00
Drilled Wd-814 windscreen support to fuselage.
Details

 04-26-2006
2.70
Painted interior parts & fit F821

 04-25-2006
2.00
Refit front 7 rear throttle Quads

 04-23-2006
1.50
Installed Aux Fuel Pump & forward Bag comp.

 04-21-2006
7.50
Installed pitch & roll servo brackets
     

 03-08-2006
2.00
Front seat back Fab finish.
Details
     

 03-04-2006
6.20
Aft wiring & Assemble front & rear seat backs.

 03-03-2006
6.20
Installed aft wiring
     

 03-02-2006
5.10
Seat backs preped for painting. wired strobs.

 03-01-2006
1.30
Rear bay bottom stiffiner fabricated.

 02-27-2006
2.20
Installed in assembly bushings for tail strob & po

 10-02-2004
2.20
Drilled stiffners and hing to F829.
Details