KitLog pro

Powered By Kitlog Pro v2.0

RUSS'S WEB SITE
Work Logs Found: 79
Category Work Time: 864 Hours
 Date
Hours
Work Log Summary

Details

 10-25-2010
37.60
Installed elevator, wiring, gas lines, elevator ca
Details
       

 03-27-2010
29.30
Work on cabin, windows and wing
Details
       

 03-11-2010
35.00
flaperon supports, windows, seat belts, seats
Details
       

 02-27-2010
20.00
Riveted fuselage, installed torque tube
Details
       

 02-13-2010
44.50
Continued clicoing the fuselage
Details

 02-02-2010
10.00
Continue disassemble and deburr RHS
Details

 01-31-2010
21.00
New bottom and RHS rear skin extensions
Details
       

 12-31-2009
12.00
Late entry to include photos. See 12/31/09
Details
       

 12-30-2009
30.00
Put new right side skin on. Straighten fuselage
Details
       

 12-07-2009
26.10
Rebuilding rear fuselage: Start on wings
Details
       

 11-21-2009
9.70
Flaperons and fuselage
Details

 11-12-2009
18.00
Worked on RHS skin to straighten fuselage
Details
       

 11-10-2009
30.10
Work on fuselage problem and flaperons
Details

 10-18-2009
22.10
Aligning top and bottom skins
Details
     

 09-21-2009
16.00
Riveting cockpit parts
Details
       

 09-15-2009
18.50
Fuselage alignment
Details
       

 09-05-2009
9.30
Fairleads for rudder cables
Details
       

 09-02-2009
17.30
RH main mount, safety wire nose strut, cables
Details
       

 08-30-2009
13.90
Mounted main mounts. Prepared to debur fwd fuselag
Details
       

 08-28-2009
14.90
Prepared parts and installed main landing gear str
Details
       

 08-23-2009
5.10
Completed nose wheel strut. Riveted main mount gui
Details
       

 08-11-2009
12.60
Nose gear and wheel. Seats
Details
       

 08-06-2009
3.90
Nose wheel strut. Nose wheel.
Details
       

 08-04-2009
6.80
Seat Pans. Nose gear strut.
Details
       

 08-02-2009
7.40
Worked on nose gear strut
Details
       

 07-25-2009
10.00
Install top forward skin
Details
       

 07-22-2009
6.20
Fitted langing gear strut doublers
Details
       

 07-14-2009
5.00
Fitted left seat base. Fitted left gear strut fitt
Details
       

 07-08-2009
15.60
Lower engine mount. Gear strut fittings.
Details
       

 07-05-2009
5.30
Fitted left hand seat. Installed firewall.
Details
       

 07-02-2009
6.40
Fitting in the seat pan.
Details
       

 06-29-2009
7.70
Worked on controls. Riveted fuselage
Details
       

 06-26-2009
8.60
Joined fwd and rear fuselage. Control linkages
Details
       

 06-22-2009
4.00
Worked on bottom inspection plate. Rudder pedals
Details
       

 06-17-2009
3.90
Prepared bottom inspection door. Controls.
Details
       

 06-16-2009
6.70
Riveting in baggage compartment. Flaperon controls
Details
       

 06-15-2009
4.80
Repaired some firewall rivets and fuselage rivets
Details

 06-14-2009
10.70
re-assembled and riveted firewall
Details
       

 06-11-2009
8.30
Deburred, treated and re-assembled firewall
Details
       

 05-22-2009
7.10
Continue working on the firewall
Details
       

 05-20-2009
3.00
Worked on firewall
Details
       

 05-19-2009
4.90
Re-assembled fwd fuselage. Started on firewall
Details
       

 05-18-2009
4.30
Deburred, ZnO, reassembled fwd fuselage
Details
       

 05-17-2009
19.20
Deburring, preparing rear fuselage for joining
Details
       

 05-12-2009
5.70
Deburred, Zinc Oxide, re-installed parts
Details
       

 05-07-2009
6.30
Make L's and start deburring fwd fuselage
Details

 04-14-2009
10.90
Added "L" s to fwd fuselage as indicated
Details
       

 04-12-2009
10.00
Cleco'd fwd fuselage. Fitted rudder pedals.
Details
       

 04-11-2009
2.60
Drilled and cleco'd parts in the forward fuselage
Details
       

 04-10-2009
12.40
Started assembly of forward fuselage
Details
       

 04-08-2009
6.90
Located and assembled control linkages
Details
       

 04-06-2009
11.30
Clico'd baggage compartment. Worked on controls.
Details
       

 04-05-2009
6.70
Put top skin on. Baggage back. Flaperon cross bar.
Details
       

 04-04-2009
11.40
Lot of time getting rear bulkhead to fit
Details
       

 04-03-2009
6.40
Attached sides to bottom; worked on bulkheads
Details
       

 03-31-2009
2.90
Prepared front end of the top. Flaperon linkage br
Details

 03-30-2009
11.20
Prepared RHS to assemble with bottom.
Details

 03-29-2009
14.10
Built up baggage cpt and got right side ready for
Details

 03-27-2009
6.40
Riveted up the bottom
Details
       

 03-26-2009
6.30
Built up left side of baggage area on left side
Details
       

 03-23-2009
7.60
Studied plans and pre-positioned inner structures
Details
       

 03-22-2009
9.10
Baggage area. Difficult 3D problem.
Details

 03-21-2009
4.10
Deburred bottom and started on baggage compartment
Details
       

 03-20-2009
4.10
Added L sections to bottom skin. Fabricated rear t
Details
       

 03-19-2009
5.40
Drilled and clido'd the bottom skin
Details
       

 03-17-2009
8.70
Reassembled and riveted top section. Got longerons
Details
       

 03-16-2009
9.30
Stiffners, bulkheads, deburring and ZnO to top
Details
       

 03-15-2009
10.30
Clico'd longerons to top. Fabricated cross members
Details
       

 03-13-2009
5.10
Finished riveting LHS. Started on fuselage rear to
Details
       

 03-12-2009
3.90
Deburred and treated LHS with Zinc Oxide
Details

 03-11-2009
9.60
Put longerons and stiffners onto LHS skin
Details
       

 03-10-2009
4.20
Applied ZnO to RHS, cleco'd and riveted it.
Details
       

 03-04-2009
3.80
Disassembled RHS and deburred
Details

 03-03-2009
3.80
Put last stiffners on the fuselage RHS
Details
       

 03-01-2009
4.90
Fabricated diagonal L sections for RHS, drilled, c
Details
       

 02-28-2009
8.40
Attached longerons to RHS. Drilled for "L"'s
Details
       

 02-27-2009
4.80
Started drilling and clecoing longeron to RH skin
Details
       

 02-26-2009
8.40
Picked out all fuselage parts. Studied plan.
Details
       

 02-26-2009
4.00
Drilled and clico'd parts of the interior of the r
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.